a55c9d617d
ci / backend (push) Failing after 0s
Build & Test with Secrets / build (push) Failing after 1s
ci / static (push) Failing after 8s
Build & Test with Secrets / security-scan (push) Failing after 5s
Build & Test with Secrets / frontend (push) Successful in 2m57s
Build & Test with Secrets / notification (push) Failing after 1s
ci / frontend (push) Successful in 3m5s
Phase 2: PBO/DSR Metrics Validation - Template for collecting Probability of Backtest Overfit metrics - DSR (Daily Sharpe Ratio) validation checklist - OOS (Out-of-Sample) performance by market phase - Pass/fail criteria for each metric - Evidence collection and archiving plan Phase 3: Crash Recovery Rehearsal - Four failure scenarios: outbox loss, DB drop, lock timeout, inbox failure - Recovery procedures: state reconciliation, message replay, lock recovery - Test result tracking matrix - Verification checklist for each procedure - Evidence documentation Status (2026-08-03 22:30 KST): ✅ Phase 1 (Job 893): RUNNING (22:04 KST start) ✅ Phase 2 template: READY ✅ Phase 3 template: READY ⏳ Phase 4 template: NEXT These templates enable systematic Phase 2-3 execution when Phase 1 completes. Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
101 lines
2.1 KiB
Markdown
101 lines
2.1 KiB
Markdown
# Gate 5: PBO/DSR Metrics Validation Report
|
|
|
|
**Status:** ⏳ IN PREPARATION
|
|
**Phase:** 2 (Post Job 893 Execution)
|
|
**Timeline:** TBD (5-10 days after Phase 1)
|
|
**Template Version:** 2026-08-03
|
|
|
|
---
|
|
|
|
## 📊 **Metrics Summary**
|
|
|
|
### PBO (Probability of Backtest Overfit)
|
|
| Metric | Target | Result | Status |
|
|
|--------|--------|--------|--------|
|
|
| **PBO Value** | ≥ ? | TBD | ⏳ Pending |
|
|
| **CSCV Score** | ≥ ? | TBD | ⏳ Pending |
|
|
| **Confidence Interval** | 95% | TBD | ⏳ Pending |
|
|
| **Sample Size** | 252+ days | TBD | ⏳ Pending |
|
|
|
|
### DSR (Daily Sharpe Ratio)
|
|
| Metric | Target | Result | Status |
|
|
|--------|--------|--------|--------|
|
|
| **DSR Value** | > baseline | TBD | ⏳ Pending |
|
|
| **Baseline** | ? | TBD | ⏳ Pending |
|
|
| **Minimum Period** | 252 days | TBD | ⏳ Pending |
|
|
| **Volatility** | Acceptable | TBD | ⏳ Pending |
|
|
|
|
---
|
|
|
|
## ✅ **Validation Checklist**
|
|
|
|
### PBO Validation
|
|
- [ ] Data extracted from Job 893
|
|
- [ ] CSCV methodology applied (or simplified variant if DEBT-009 deferred)
|
|
- [ ] Cross-validation performed
|
|
- [ ] Confidence intervals calculated
|
|
- [ ] Results within acceptable range
|
|
- [ ] Evidence documented
|
|
|
|
### DSR Validation
|
|
- [ ] Daily returns calculated
|
|
- [ ] Sharpe ratio computed (252-day window)
|
|
- [ ] Baseline threshold established
|
|
- [ ] DSR > baseline verified
|
|
- [ ] No data gaps detected
|
|
- [ ] Results documented
|
|
|
|
### OOS (Out-of-Sample) Performance
|
|
- [ ] Bull market phase: DSR = ?
|
|
- [ ] Bear market phase: DSR = ?
|
|
- [ ] Sideways market phase: DSR = ?
|
|
- [ ] Results within acceptable range
|
|
- [ ] No systematic failure detected
|
|
|
|
---
|
|
|
|
## 📝 **Findings**
|
|
|
|
### PBO Analysis
|
|
```
|
|
[To be completed during Phase 2]
|
|
|
|
Observation:
|
|
Conclusion:
|
|
Impact:
|
|
```
|
|
|
|
### DSR Analysis
|
|
```
|
|
[To be completed during Phase 2]
|
|
|
|
Observation:
|
|
Conclusion:
|
|
Impact:
|
|
```
|
|
|
|
### OOS Phase Analysis
|
|
```
|
|
[To be completed during Phase 2]
|
|
|
|
Bull Market DSR: TBD
|
|
Bear Market DSR: TBD
|
|
Sideways Market DSR: TBD
|
|
|
|
Overall: TBD
|
|
```
|
|
|
|
---
|
|
|
|
## ✅ **Gate 5 Phase 2 Completion**
|
|
|
|
- [ ] All metrics collected
|
|
- [ ] Validation complete
|
|
- [ ] Evidence archived
|
|
- [ ] Report approved
|
|
- **Status:** ✅ **PASS** or ❌ **FAIL** (TBD)
|
|
|
|
---
|
|
|
|
**Next:** Phase 3 (Crash Recovery Rehearsal)
|