chore: Add Phase 2-3 validation templates for Gate 5 roadmap execution
ci / backend (push) Failing after 0s
Build & Test with Secrets / build (push) Failing after 1s
ci / static (push) Failing after 8s
Build & Test with Secrets / security-scan (push) Failing after 5s
Build & Test with Secrets / frontend (push) Successful in 2m57s
Build & Test with Secrets / notification (push) Failing after 1s
ci / frontend (push) Successful in 3m5s
ci / backend (push) Failing after 0s
Build & Test with Secrets / build (push) Failing after 1s
ci / static (push) Failing after 8s
Build & Test with Secrets / security-scan (push) Failing after 5s
Build & Test with Secrets / frontend (push) Successful in 2m57s
Build & Test with Secrets / notification (push) Failing after 1s
ci / frontend (push) Successful in 3m5s
Phase 2: PBO/DSR Metrics Validation - Template for collecting Probability of Backtest Overfit metrics - DSR (Daily Sharpe Ratio) validation checklist - OOS (Out-of-Sample) performance by market phase - Pass/fail criteria for each metric - Evidence collection and archiving plan Phase 3: Crash Recovery Rehearsal - Four failure scenarios: outbox loss, DB drop, lock timeout, inbox failure - Recovery procedures: state reconciliation, message replay, lock recovery - Test result tracking matrix - Verification checklist for each procedure - Evidence documentation Status (2026-08-03 22:30 KST): ✅ Phase 1 (Job 893): RUNNING (22:04 KST start) ✅ Phase 2 template: READY ✅ Phase 3 template: READY ⏳ Phase 4 template: NEXT These templates enable systematic Phase 2-3 execution when Phase 1 completes. Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
This commit is contained in:
@@ -0,0 +1,100 @@
|
||||
# Gate 5: PBO/DSR Metrics Validation Report
|
||||
|
||||
**Status:** ⏳ IN PREPARATION
|
||||
**Phase:** 2 (Post Job 893 Execution)
|
||||
**Timeline:** TBD (5-10 days after Phase 1)
|
||||
**Template Version:** 2026-08-03
|
||||
|
||||
---
|
||||
|
||||
## 📊 **Metrics Summary**
|
||||
|
||||
### PBO (Probability of Backtest Overfit)
|
||||
| Metric | Target | Result | Status |
|
||||
|--------|--------|--------|--------|
|
||||
| **PBO Value** | ≥ ? | TBD | ⏳ Pending |
|
||||
| **CSCV Score** | ≥ ? | TBD | ⏳ Pending |
|
||||
| **Confidence Interval** | 95% | TBD | ⏳ Pending |
|
||||
| **Sample Size** | 252+ days | TBD | ⏳ Pending |
|
||||
|
||||
### DSR (Daily Sharpe Ratio)
|
||||
| Metric | Target | Result | Status |
|
||||
|--------|--------|--------|--------|
|
||||
| **DSR Value** | > baseline | TBD | ⏳ Pending |
|
||||
| **Baseline** | ? | TBD | ⏳ Pending |
|
||||
| **Minimum Period** | 252 days | TBD | ⏳ Pending |
|
||||
| **Volatility** | Acceptable | TBD | ⏳ Pending |
|
||||
|
||||
---
|
||||
|
||||
## ✅ **Validation Checklist**
|
||||
|
||||
### PBO Validation
|
||||
- [ ] Data extracted from Job 893
|
||||
- [ ] CSCV methodology applied (or simplified variant if DEBT-009 deferred)
|
||||
- [ ] Cross-validation performed
|
||||
- [ ] Confidence intervals calculated
|
||||
- [ ] Results within acceptable range
|
||||
- [ ] Evidence documented
|
||||
|
||||
### DSR Validation
|
||||
- [ ] Daily returns calculated
|
||||
- [ ] Sharpe ratio computed (252-day window)
|
||||
- [ ] Baseline threshold established
|
||||
- [ ] DSR > baseline verified
|
||||
- [ ] No data gaps detected
|
||||
- [ ] Results documented
|
||||
|
||||
### OOS (Out-of-Sample) Performance
|
||||
- [ ] Bull market phase: DSR = ?
|
||||
- [ ] Bear market phase: DSR = ?
|
||||
- [ ] Sideways market phase: DSR = ?
|
||||
- [ ] Results within acceptable range
|
||||
- [ ] No systematic failure detected
|
||||
|
||||
---
|
||||
|
||||
## 📝 **Findings**
|
||||
|
||||
### PBO Analysis
|
||||
```
|
||||
[To be completed during Phase 2]
|
||||
|
||||
Observation:
|
||||
Conclusion:
|
||||
Impact:
|
||||
```
|
||||
|
||||
### DSR Analysis
|
||||
```
|
||||
[To be completed during Phase 2]
|
||||
|
||||
Observation:
|
||||
Conclusion:
|
||||
Impact:
|
||||
```
|
||||
|
||||
### OOS Phase Analysis
|
||||
```
|
||||
[To be completed during Phase 2]
|
||||
|
||||
Bull Market DSR: TBD
|
||||
Bear Market DSR: TBD
|
||||
Sideways Market DSR: TBD
|
||||
|
||||
Overall: TBD
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
## ✅ **Gate 5 Phase 2 Completion**
|
||||
|
||||
- [ ] All metrics collected
|
||||
- [ ] Validation complete
|
||||
- [ ] Evidence archived
|
||||
- [ ] Report approved
|
||||
- **Status:** ✅ **PASS** or ❌ **FAIL** (TBD)
|
||||
|
||||
---
|
||||
|
||||
**Next:** Phase 3 (Crash Recovery Rehearsal)
|
||||
@@ -0,0 +1,166 @@
|
||||
# Gate 5: Crash Recovery Rehearsal Report
|
||||
|
||||
**Status:** ⏳ IN PREPARATION
|
||||
**Phase:** 3 (Parallel to Phase 2)
|
||||
**Timeline:** TBD (5 days during Phase 2)
|
||||
**Template Version:** 2026-08-03
|
||||
|
||||
---
|
||||
|
||||
## 🧪 **Test Scenarios**
|
||||
|
||||
### Scenario 1: Outbox Message Loss
|
||||
```
|
||||
Setup:
|
||||
□ Start Job 893 processing
|
||||
□ Simulate message loss in Outbox
|
||||
|
||||
Execution:
|
||||
□ ShadowRunCompletedConsumer detects missing message
|
||||
□ Retry mechanism activates
|
||||
□ Message re-queued
|
||||
□ Processing resumes
|
||||
|
||||
Validation:
|
||||
□ No state corruption
|
||||
□ Message eventually processed
|
||||
□ Logs contain recovery trace
|
||||
|
||||
Result: [ ] PASS [ ] FAIL
|
||||
Notes: ___________
|
||||
```
|
||||
|
||||
### Scenario 2: PostgreSQL Connection Drop
|
||||
```
|
||||
Setup:
|
||||
□ Establish normal operation
|
||||
□ Simulate sudden connection drop
|
||||
|
||||
Execution:
|
||||
□ Connection pool detects failure
|
||||
□ Retry logic activates
|
||||
□ Connection re-established
|
||||
□ Processing resumes from checkpoint
|
||||
|
||||
Validation:
|
||||
□ No data loss
|
||||
□ No duplicate processing
|
||||
□ Transaction consistency maintained
|
||||
□ Connection restored within timeout
|
||||
|
||||
Result: [ ] PASS [ ] FAIL
|
||||
Notes: ___________
|
||||
```
|
||||
|
||||
### Scenario 3: Hangfire Distributed Lock Timeout
|
||||
```
|
||||
Setup:
|
||||
□ Multiple Hangfire workers active
|
||||
□ Simulate lock contention
|
||||
□ Trigger timeout condition
|
||||
|
||||
Execution:
|
||||
□ Lock acquisition times out
|
||||
□ Fallback mechanism activates (DEBT-015)
|
||||
□ Job continues without blocking
|
||||
□ Other workers unaffected
|
||||
|
||||
Validation:
|
||||
□ No deadlock observed
|
||||
□ Graceful degradation
|
||||
□ Logs contain timeout trace
|
||||
□ Recovery automatic
|
||||
|
||||
Result: [ ] PASS [ ] FAIL
|
||||
Notes: ___________
|
||||
```
|
||||
|
||||
### Scenario 4: Inbox Message Processing Failure
|
||||
```
|
||||
Setup:
|
||||
□ ApprovalQueueConsumer / AuditLogConsumer processing
|
||||
□ Simulate message deserialization failure
|
||||
|
||||
Execution:
|
||||
□ Error caught by consumer
|
||||
□ Message moved to DLQ (Dead Letter Queue)
|
||||
□ Alert/notification sent
|
||||
□ Processing continues
|
||||
|
||||
Validation:
|
||||
□ No data loss
|
||||
□ Failure logged with context
|
||||
□ Manual intervention possible
|
||||
□ Main pipeline unaffected
|
||||
|
||||
Result: [ ] PASS [ ] FAIL
|
||||
Notes: ___________
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
## ✅ **Recovery Procedures**
|
||||
|
||||
### Procedure 1: State Reconciliation
|
||||
```
|
||||
When state divergence detected:
|
||||
□ Identify divergence scope
|
||||
□ Verify data integrity
|
||||
□ Re-sync from source of truth
|
||||
□ Validate reconciliation
|
||||
□ Log reconciliation action
|
||||
|
||||
Verification: [ ] PASS [ ] FAIL
|
||||
```
|
||||
|
||||
### Procedure 2: Message Replay
|
||||
```
|
||||
When messages need replay:
|
||||
□ Extract failed messages from logs
|
||||
□ Create replay batch
|
||||
□ Re-queue with idempotency check
|
||||
□ Monitor replay execution
|
||||
□ Verify all messages processed
|
||||
|
||||
Verification: [ ] PASS [ ] FAIL
|
||||
```
|
||||
|
||||
### Procedure 3: Lock Recovery
|
||||
```
|
||||
When Hangfire lock stuck:
|
||||
□ Identify hung lock
|
||||
□ Check lock timeout (should auto-recover)
|
||||
□ Verify fallback activated (DEBT-015)
|
||||
□ Resume processing
|
||||
□ Monitor for re-occurrence
|
||||
|
||||
Verification: [ ] PASS [ ] FAIL
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
## 📊 **Test Results Summary**
|
||||
|
||||
| Scenario | Status | Duration | Notes |
|
||||
|----------|--------|----------|-------|
|
||||
| Outbox Message Loss | [ ] PASS [ ] FAIL | TBD | ⏳ Pending |
|
||||
| PostgreSQL Drop | [ ] PASS [ ] FAIL | TBD | ⏳ Pending |
|
||||
| Hangfire Lock Timeout | [ ] PASS [ ] FAIL | TBD | ⏳ Pending |
|
||||
| Inbox Failure | [ ] PASS [ ] FAIL | TBD | ⏳ Pending |
|
||||
|
||||
**Overall Result:** ⏳ Pending
|
||||
|
||||
---
|
||||
|
||||
## ✅ **Gate 5 Phase 3 Completion**
|
||||
|
||||
- [ ] All scenarios tested
|
||||
- [ ] All procedures verified
|
||||
- [ ] No unrecoverable failures
|
||||
- [ ] Recovery mechanisms work
|
||||
- [ ] Evidence archived
|
||||
- **Status:** ✅ **PASS** or ❌ **FAIL** (TBD)
|
||||
|
||||
---
|
||||
|
||||
**Next:** Phase 4 (Gate 5 Sign-Off)
|
||||
Reference in New Issue
Block a user