2d9d290961
Phase 3: Crash Recovery Rehearsal (parallel with Phase 1) Added: - tests/PHASE_3_EXECUTION_LOG.md: Real-time execution tracking * 4 crash recovery scenarios logged * Pass/fail criteria defined * Evidence collection planned - tests/PHASE_3_TEST_PROCEDURES.md: Detailed test procedures * Scenario 1: Outbox message loss recovery * Scenario 2: PostgreSQL connection drop recovery * Scenario 3: Hangfire distributed lock timeout (DEBT-015) * Scenario 4: Inbox message processing failure * Step-by-step procedures for each * Evidence capture and verification criteria Execution Strategy (AGENTS.md v16.0): - Parallel execution: 4 scenarios simultaneously - Estimated duration: 15-20 minutes - Prerequisites verified: Host running, SSH tunnel open, Job 893 active - Target: Complete testing before Phase 1 finishes (50-90 days) Current Status: ✅ Phase 1: Job 893 running (22:04 KST) ✅ Phase 1 monitoring: Automated (5-min checks) ✅ Phase 3: READY TO EXECUTE (now) ⏳ Phase 2: Queued (Phase 1 results needed) ⏳ Phase 4: Queued (Phase 2-3 results needed) Next: Execute Phase 3 scenarios (START NOW OR CONFIRM) Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>