chore: Add Phase 2-3 validation templates for Gate 5 roadmap execution
ci / backend (push) Failing after 0s
Build & Test with Secrets / build (push) Failing after 1s
ci / static (push) Failing after 8s
Build & Test with Secrets / security-scan (push) Failing after 5s
Build & Test with Secrets / frontend (push) Successful in 2m57s
Build & Test with Secrets / notification (push) Failing after 1s
ci / frontend (push) Successful in 3m5s

Phase 2: PBO/DSR Metrics Validation
- Template for collecting Probability of Backtest Overfit metrics
- DSR (Daily Sharpe Ratio) validation checklist
- OOS (Out-of-Sample) performance by market phase
- Pass/fail criteria for each metric
- Evidence collection and archiving plan

Phase 3: Crash Recovery Rehearsal
- Four failure scenarios: outbox loss, DB drop, lock timeout, inbox failure
- Recovery procedures: state reconciliation, message replay, lock recovery
- Test result tracking matrix
- Verification checklist for each procedure
- Evidence documentation

Status (2026-08-03 22:30 KST):
 Phase 1 (Job 893): RUNNING (22:04 KST start)
 Phase 2 template: READY
 Phase 3 template: READY
 Phase 4 template: NEXT

These templates enable systematic Phase 2-3 execution when Phase 1 completes.

Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
This commit is contained in:
2026-08-03 22:12:20 +09:00
parent 78048238ba
commit a55c9d617d
2 changed files with 266 additions and 0 deletions
+100
View File
@@ -0,0 +1,100 @@
# Gate 5: PBO/DSR Metrics Validation Report
**Status:** ⏳ IN PREPARATION
**Phase:** 2 (Post Job 893 Execution)
**Timeline:** TBD (5-10 days after Phase 1)
**Template Version:** 2026-08-03
---
## 📊 **Metrics Summary**
### PBO (Probability of Backtest Overfit)
| Metric | Target | Result | Status |
|--------|--------|--------|--------|
| **PBO Value** | ≥ ? | TBD | ⏳ Pending |
| **CSCV Score** | ≥ ? | TBD | ⏳ Pending |
| **Confidence Interval** | 95% | TBD | ⏳ Pending |
| **Sample Size** | 252+ days | TBD | ⏳ Pending |
### DSR (Daily Sharpe Ratio)
| Metric | Target | Result | Status |
|--------|--------|--------|--------|
| **DSR Value** | > baseline | TBD | ⏳ Pending |
| **Baseline** | ? | TBD | ⏳ Pending |
| **Minimum Period** | 252 days | TBD | ⏳ Pending |
| **Volatility** | Acceptable | TBD | ⏳ Pending |
---
## ✅ **Validation Checklist**
### PBO Validation
- [ ] Data extracted from Job 893
- [ ] CSCV methodology applied (or simplified variant if DEBT-009 deferred)
- [ ] Cross-validation performed
- [ ] Confidence intervals calculated
- [ ] Results within acceptable range
- [ ] Evidence documented
### DSR Validation
- [ ] Daily returns calculated
- [ ] Sharpe ratio computed (252-day window)
- [ ] Baseline threshold established
- [ ] DSR > baseline verified
- [ ] No data gaps detected
- [ ] Results documented
### OOS (Out-of-Sample) Performance
- [ ] Bull market phase: DSR = ?
- [ ] Bear market phase: DSR = ?
- [ ] Sideways market phase: DSR = ?
- [ ] Results within acceptable range
- [ ] No systematic failure detected
---
## 📝 **Findings**
### PBO Analysis
```
[To be completed during Phase 2]
Observation:
Conclusion:
Impact:
```
### DSR Analysis
```
[To be completed during Phase 2]
Observation:
Conclusion:
Impact:
```
### OOS Phase Analysis
```
[To be completed during Phase 2]
Bull Market DSR: TBD
Bear Market DSR: TBD
Sideways Market DSR: TBD
Overall: TBD
```
---
## ✅ **Gate 5 Phase 2 Completion**
- [ ] All metrics collected
- [ ] Validation complete
- [ ] Evidence archived
- [ ] Report approved
- **Status:** ✅ **PASS** or ❌ **FAIL** (TBD)
---
**Next:** Phase 3 (Crash Recovery Rehearsal)
+166
View File
@@ -0,0 +1,166 @@
# Gate 5: Crash Recovery Rehearsal Report
**Status:** ⏳ IN PREPARATION
**Phase:** 3 (Parallel to Phase 2)
**Timeline:** TBD (5 days during Phase 2)
**Template Version:** 2026-08-03
---
## 🧪 **Test Scenarios**
### Scenario 1: Outbox Message Loss
```
Setup:
□ Start Job 893 processing
□ Simulate message loss in Outbox
Execution:
□ ShadowRunCompletedConsumer detects missing message
□ Retry mechanism activates
□ Message re-queued
□ Processing resumes
Validation:
□ No state corruption
□ Message eventually processed
□ Logs contain recovery trace
Result: [ ] PASS [ ] FAIL
Notes: ___________
```
### Scenario 2: PostgreSQL Connection Drop
```
Setup:
□ Establish normal operation
□ Simulate sudden connection drop
Execution:
□ Connection pool detects failure
□ Retry logic activates
□ Connection re-established
□ Processing resumes from checkpoint
Validation:
□ No data loss
□ No duplicate processing
□ Transaction consistency maintained
□ Connection restored within timeout
Result: [ ] PASS [ ] FAIL
Notes: ___________
```
### Scenario 3: Hangfire Distributed Lock Timeout
```
Setup:
□ Multiple Hangfire workers active
□ Simulate lock contention
□ Trigger timeout condition
Execution:
□ Lock acquisition times out
□ Fallback mechanism activates (DEBT-015)
□ Job continues without blocking
□ Other workers unaffected
Validation:
□ No deadlock observed
□ Graceful degradation
□ Logs contain timeout trace
□ Recovery automatic
Result: [ ] PASS [ ] FAIL
Notes: ___________
```
### Scenario 4: Inbox Message Processing Failure
```
Setup:
□ ApprovalQueueConsumer / AuditLogConsumer processing
□ Simulate message deserialization failure
Execution:
□ Error caught by consumer
□ Message moved to DLQ (Dead Letter Queue)
□ Alert/notification sent
□ Processing continues
Validation:
□ No data loss
□ Failure logged with context
□ Manual intervention possible
□ Main pipeline unaffected
Result: [ ] PASS [ ] FAIL
Notes: ___________
```
---
## ✅ **Recovery Procedures**
### Procedure 1: State Reconciliation
```
When state divergence detected:
□ Identify divergence scope
□ Verify data integrity
□ Re-sync from source of truth
□ Validate reconciliation
□ Log reconciliation action
Verification: [ ] PASS [ ] FAIL
```
### Procedure 2: Message Replay
```
When messages need replay:
□ Extract failed messages from logs
□ Create replay batch
□ Re-queue with idempotency check
□ Monitor replay execution
□ Verify all messages processed
Verification: [ ] PASS [ ] FAIL
```
### Procedure 3: Lock Recovery
```
When Hangfire lock stuck:
□ Identify hung lock
□ Check lock timeout (should auto-recover)
□ Verify fallback activated (DEBT-015)
□ Resume processing
□ Monitor for re-occurrence
Verification: [ ] PASS [ ] FAIL
```
---
## 📊 **Test Results Summary**
| Scenario | Status | Duration | Notes |
|----------|--------|----------|-------|
| Outbox Message Loss | [ ] PASS [ ] FAIL | TBD | ⏳ Pending |
| PostgreSQL Drop | [ ] PASS [ ] FAIL | TBD | ⏳ Pending |
| Hangfire Lock Timeout | [ ] PASS [ ] FAIL | TBD | ⏳ Pending |
| Inbox Failure | [ ] PASS [ ] FAIL | TBD | ⏳ Pending |
**Overall Result:** ⏳ Pending
---
## ✅ **Gate 5 Phase 3 Completion**
- [ ] All scenarios tested
- [ ] All procedures verified
- [ ] No unrecoverable failures
- [ ] Recovery mechanisms work
- [ ] Evidence archived
- **Status:** ✅ **PASS** or ❌ **FAIL** (TBD)
---
**Next:** Phase 4 (Gate 5 Sign-Off)