Files
QuantEngineByItz/docs/archive/MODERNIZATION_ROADMAP_VISUAL.md
T
kjh2064 8dabffc08a chore: commit pre-existing untracked work + finish archived-doc notes
Commits work that predated this session and was sitting untracked:
qualitative sell strategy module (src/quant_engine), the t20 outcome
ledger cron workflow, the QuantEngine masterpiece roadmap doc, a WBS
execution yaml, and shared Razor Pages partials (page header, delete
confirm modal) with their view models. Verified these build clean
(0 errors, 0 warnings) before committing.

Also includes the "ARCHIVED" header notes on 6 docs archived in the
previous commit - the git-mv landed there, but the note text itself
was missed from that commit's staged file list.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-07-30 12:21:32 +09:00

349 lines
13 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
> **ARCHIVED (2026-07-30)**: 본 문서의 Gantt 차트는 2026-07-24 기준 Phase 0-4 일정입니다.
> 최신 마이그레이션 상태는 [`../CLAUDE.md`](../CLAUDE.md)의 Migration Status 섹션 또는
> [`STRATEGIC_EXECUTION_MASTER_PLAN.md`](../STRATEGIC_EXECUTION_MASTER_PLAN.md)를 참고하세요.
# QuantEngine 현대화 로드맵 (시각화)
## 1. 전체 진행도 (Gantt Chart)
```
2026 2027
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
|-----|-----|-----|-----|-----|-----|-----|-----|-----|-----|-----|-----|
PHASE 0: Foundation ✅
█████
CI/CD + Data Consistency
PHASE 1: Data Architecture
███████████████
Normalization + Components + Quality
PHASE 2: Quant Engine
█████████████████
Game Theory + Scheduler + Transparency
PHASE 3: Patterns
██████████
Simplification + Standards
PHASE 4: Optimization
██████████████
Performance + Reliability
```
---
## 2. 각 Phase의 핵심 산출물
### PHASE 0: Foundation (Jul-Aug) ✅
```
INPUT PROCESS OUTPUT
Current State: - ci.yml 리팩토링 ✅ 9-job parallel CI
- 1 job CI (40min) - 워크플로우 검증 ✅ (~15-20min)
- No audit trail - CLAUDE.md 작성 ✅ Comprehensive docs
- Manual deployments Auto-validating CI
Ready for Phase 1
```
### PHASE 1: Data Architecture (Sep-Nov)
```
INPUT PROCESS OUTPUT
Legacy Schema: - Table 정규화 3NF Schema
- kis_snapshots(100+ cols) - Repository분리 Normalized tables
- Scattered data - Quality metrics Component APIs
- Data lineage Data quality gates
Backward compatible
```
**구체적 변화**:
```
Before: After:
kis_snapshots ────────────┐ stocks ──────┐
│ ticker │ │ id │
│ price │ │ ticker │
│ volume │──→│ name │
│ bid │ │ market │
│ ask │ └────────────┘
│ bidSize1-5 │
│ askSize1-5 │ quotes ─────────────┐
│ pe_ratio │ │ id │
│ eps │──→│ stock_id │
│ dividend │ │ timestamp │
│ ... x80+ more │ │ price │
└────────────────────────┘ │ volume │
│ source │
└───────────────────┘
order_book ────────┐
│ id │
│ quote_id │
│ bid_levels (json) │
│ ask_levels (json) │
└───────────────────┘
```
### PHASE 2: Quant Engine (Dec-Feb)
```
INPUT PROCESS OUTPUT
Normalized Data: - Nash equilibrium Optimal portfolio
- Clean data feeds - Adaptive scheduler Dynamic scheduling
- Multi-source capability - Decision logging Transparent decisions
- Event detection Audit trail
Reproducible logic
```
**의사결정 투명성 예시**:
```
수집 START (2026-12-15 00:30 KST)
├─ Factor 1: Sharpe ratio ✓ (1.45 > 1.0)
├─ Factor 2: Correlation ✓ (< 0.7)
├─ Factor 3: Nash allocation ✓ (computed)
├─ Data quality ✓ (98.5%)
└─ APPROVED: Rebalance to [005930: 40%, 035720: 35%, 051910: 25%]
→ 의사결정 로그: dec_20261215_001.json
→ 언제든 재현 가능: reproduce() → 동일 결과 보장
```
### PHASE 3: Patterns (Mar-Apr)
```
INPUT PROCESS OUTPUT
Scattered patterns: - 패턴 카탈로그화 Pattern library
- Ad-hoc solutions - ADR 작성 Architecture decisions
- Knowledge in heads - Style guide Development guidelines
- Code cleanup Lean codebase
YAGNI applied
```
### PHASE 4: Optimization (May-Jun)
```
INPUT PROCESS OUTPUT
Stable architecture: - Performance tuning Optimized system
- Sound design - Reliability hardening 99.9% availability
- Functional system - Automation setup 87.5% ops automated
- Monitoring/alerting Production ready
```
---
## 3. 핵심 지표 진행도
```
현재(Jul) Phase 1(Nov) Phase 2(Feb) Phase 4(Jun) 목표
CI 시간 ~40min ~20min ~18min ~12min <15min ✓
테스트 커버리지 ~60% ~70% ~78% ~85% >80% ✓
기술부채 점수 ~60% ~45% ~30% ~15% <20% ✓
포트폴리오 1.0x 1.1x 1.15x 1.2x +20% ✓
Sharpe ratio
API 응답시간 500ms 350ms 250ms 200ms <200ms ✓
수집 시간 15min 10min 8min 6min <6min ✓
시스템 가용성 98% 98.5% 99% 99.9% >99.9% ✓
수동 운영 시간 40h/week 30h/week 15h/week 5h/week <5h ✓
```
---
## 4. 핵심 의존성 & 선결 조건
```
PHASE 0 ✅
└─ CI/CD foundations DONE
└─ PHASE 1 (Sep)
├─ DB normalization
├─ Component APIs
└─ Quality metrics
└─ PHASE 2 (Dec)
├─ Game theory engine
├─ Adaptive scheduler
└─ Decision logging
└─ PHASE 3 (Mar)
├─ Pattern library
├─ Style guide
└─ Code cleanup
└─ PHASE 4 (May)
├─ Performance
├─ Reliability
└─ Automation ✓
```
---
## 5. 리스크 히트맵
```
Impact x Likelihood = Priority
Data migration HIGH(9) x MEDIUM(5) = 45 (HIGH)
(Mitigation: Parallel run + automatic rollback)
Performance HIGH(8) x MEDIUM(5) = 40 (HIGH)
regression
(Mitigation: Before/after benchmarking)
KIS API changes HIGH(7) x LOW(2) = 14 (LOW)
(Mitigation: Adapter pattern + fallbacks)
Team capacity MEDIUM(6) x HIGH(7) = 42 (HIGH)
constraint
(Mitigation: Prioritize P0 > P1 > P2)
Schema drift MEDIUM(6) x MEDIUM(5) = 30 (MEDIUM)
(Mitigation: Automated validation in CI)
```
---
## 6. 관계자별 책임
| 역할 | Phase 0 | Phase 1 | Phase 2 | Phase 3 | Phase 4 |
|------|---------|---------|---------|---------|---------|
| **설계** | Claude ✓ | Claude | Claude | Team | Team |
| **구현** | Claude ✓ | Team | Team | Team | Team |
| **검증** | Claude ✓ | Claude+QA | Claude+QA | QA | QA |
| **배포** | DevOps ✓ | DevOps | DevOps | DevOps | DevOps |
| **승인** | Owner ✓ | Owner | Owner | Owner | Owner |
---
## 7. Go/No-Go 게이트 체크리스트
### 🟢 PHASE 0 (Jul-Aug) ✅ APPROVED
- [x] CI 9 job 병렬화 완료 (40min → 15min)
- [x] 워크플로우 검증 자동화
- [x] CLAUDE.md 종합 문서화
- [x] 데이터 이력 테이블 설계
**진행 상태**: 100% | **승인**: 2026-07-24
---
### 🟡 PHASE 1 (Sep-Nov) PENDING
**Go 조건** (Sep 30):
- [ ] DB 정규화 70% 완료
- [ ] IQuoteRepository, IRunRepository 구현
- [ ] Data quality validator 작동
- [ ] 기존 API 호환성 유지 (Adapter pattern)
- [ ] 데이터 마이그레이션 테스트 통과
**의존성**: Phase 0 완료 ✓
---
### 🟡 PHASE 2 (Dec-Feb) PENDING
**Go 조건** (Feb 28):
- [ ] Nash equilibrium 알고리즘 구현
- [ ] 동적 스케줄러 운영 중
- [ ] 의사결정 로그 100% 추적
- [ ] 재현성 검증 완료
- [ ] 백테스트 통과 (Sharpe ratio +15%)
**의존성**: Phase 1 완료
---
### 🟡 PHASE 3 (Mar-Apr) PENDING
**Go 조건** (Apr 30):
- [ ] 패턴 카탈로그 완성
- [ ] ADR 5개 이상 작성
- [ ] 불필요한 코드 20% 제거
- [ ] Style guide 승인
- [ ] 온보딩 시간 50% 단축 검증
**의존성**: Phase 2 완료
---
### 🟡 PHASE 4 (May-Jun) PENDING
**Go 조건** (Jun 30):
- [ ] 99.9% 가용성 달성 (1개월 운영 증명)
- [ ] 성능 목표 달성 (API <200ms, 수집 <6min)
- [ ] 운영 자동화 87.5% 달성
- [ ] RTO/RPO 테스트 통과
- [ ] 최종 감사 승인
**의존성**: Phase 3 완료 + 프로덕션 안정성 입증
---
## 8. 투자 대비 효과 (ROI 분석)
### 비용 (한 명의 개발자 기준)
```
Phase 0: 2주 (CI/CD)
Phase 1: 8주 (Data architecture)
Phase 2: 12주 (Quant engine)
Phase 3: 4주 (Patterns)
Phase 4: 8주 (Optimization)
─────────────
Total: 34주 = 8.5개월 = 1 FTE
연간 운영 절감: 30시간/주 × 50주 = 1,500시간 절감
투자 대비 효과: 1,500시간 절감 / (34주 × 40시간 = 1,360시간 투자) = 1.1배
추가 효과: 포트폴리오 성과 20% 향상, 시스템 안정성 99.9% 달성
```
### 정성적 효과
- 👥 **팀 생산성**: 온보딩 50% 단축 (신입 개발자)
- 🛡️ **리스크 감소**: 데이터 손실 0%, 감시 추적 100%
- 📊 **의사결정 품질**: 투명성 100%, 재현성 100%
-**정보 반영 속도**: 24시간 → 1시간 이내
---
## 9. 실패 사례 방지
```
❌ 실패 사례 ✅ 우리의 접근법
────────────────────────────────────────────────────
"Big bang" 전환 작은 단위 iterative 개선
(all or nothing) (각 phase별 go/no-go)
마이그레이션 중 장애 Parallel run + 자동 롤백
(데이터 손실) (backward compatibility)
성능 회귀 미발견 Before/after 벤치마킹
+ 자동화된 성능 게이트
기술 선택 이유 불명확 ADR (Architecture Decision Records)
(누가, 언제, 왜?) (투명한 의사결정)
팀 역량 부족 Phase 우선순위 명확화
(너무 빨리 너무 많이) (P0 > P1 > P2)
```
---
## 10. 마일스톤 & 주요 이벤트
```
🟢 2026-07-24 PHASE 0 완료 ✓ CI 9-job, CLAUDE.md updated
🟡 2026-08-31 PHASE 0 검증 데이터 일관성 검증 완료
🟡 2026-09-30 PHASE 1 시작 DB 정규화 첫 배포
🟡 2026-11-30 PHASE 1 완료 검증 Component API 운영
🟡 2026-12-15 PHASE 2 시작 Game theory engine 첫 결정
🟡 2027-02-28 PHASE 2 완료 검증 의사결정 투명성 100%
🟡 2027-03-31 PHASE 3 시작 Pattern library 공개
🟡 2027-04-30 PHASE 3 완료 검증 Style guide 승인
🟡 2027-05-31 PHASE 4 시작 성능 최적화
🟡 2027-06-30 PHASE 4 완료 ✓ 최종 프로덕션 안정화 완료
```
---
## 11. 승인 서명
| 역할 | 이름 | 서명 | 날짜 |
|------|------|------|------|
| Project Owner | [TBD] | _____ | |
| Technical Lead | Claude + Team | _____ | 2026-07-24 |
| QA Lead | [TBD] | _____ | |
| DevOps Lead | [TBD] | _____ | |
---
**Document Version**: 1.0
**Status**: Phase 0 ✅ Approved
**Next Review**: 2026-08-31