Validators (Pushes and Pull Requests) / Database & Schema Validation (push) Failing after 6s
Validators (Pushes and Pull Requests) / UI & Storage Validation (push) Failing after 11s
Validators (Pushes and Pull Requests) / WBS & Audit Validations (push) Has been skipped
Validators (Pushes and Pull Requests) / .NET Contracts (push) Has been skipped
Validators (Pushes and Pull Requests) / Calibration & Performance (push) Has been skipped
Validators (Pushes and Pull Requests) / Operational Report & Decision Packet (push) Has been skipped
Validators (Pushes and Pull Requests) / Notify PR Results (push) Has been skipped
Validators (Pushes and Pull Requests) / Security & Secrets (push) Failing after 6s
Validators (Pushes and Pull Requests) / CI Workflow Lint (push) Failing after 5s
Validators (Pushes and Pull Requests) / Core Validators & Database Setup (push) Failing after 20s
docs: add Phase 0 closeout & Phase 1 kickoff execution plan
Strategic execution roadmap for 2026-07-24 ~ 2026-09-30 (9 weeks):

PART 1: Phase 0 Validation (Jul 24 - Aug 31, 4 weeks)
- Task 1.1.1: CI performance baseline (expect 15-20min actual)
- Task 1.1.2: CI reproducibility validation (3x same commit → same result)
- Task 1.2.1: PostgreSQL audit trail tables (kis_*_audit)
- Task 1.2.2: Daily data consistency validation (completeness, freshness, consistency, outliers)
- Task 1.3.1: Deployment e2e testing (prepare-release + deploy-prod scenarios)

PART 2: Phase 1 Preparation (Sep 1-30, 5 weeks)
- Task 2.1.1: 3NF schema design & validation (stocks, quotes, order_book, fundamentals)
- Task 2.1.2: Blue-green migration strategy (5-phase parallel run, zero downtime)
- Task 2.2.1: Repository ISP refactoring (IQuoteRepository, IRunRepository, IErrorRepository)
- Task 2.2.2: Dependency inversion implementation (DI container, Strategy pattern)
- Task 2.3.1: Architecture Decision Records (5+ ADRs: normalization, DI, audit, fallback)
- Task 2.3.2: Code style guide (C#, Python, SQL, naming conventions)

PART 3: Integrated Progress Tracking
- Weekly tracking table (11-week timeline)
- Risk matrix & mitigation plans
- Success criteria for Phase 0 & 1

Key Principles Applied:
✓ SOLID (Single Responsibility, Interface Segregation, Dependency Inversion)
✓ YAGNI (No over-engineering, necessities only)
✓ Data consistency (100% audit trail, reproducibility)
✓ Blue-green deployment (zero downtime, easy rollback)
✓ Pattern standardization (Repository, Strategy, Adapter, Factory)
✓ Code quality (tests, coverage, technical debt reduction)

Success criteria by 2026-09-30:
- Phase 0 validation: CI 15-20min confirmed, 3x reproducibility pass
- Phase 1 ready: Schema designed, migration tested, SOLID refactor designed

Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>