Files
KArtSell.Aegis/TECH_DEBT_REGISTER.md
T
kjh2064 ca85a2c902 fix: Phase 2-3 DB isolation + Gate 3 data layer real connection (AGENTS.md v16.0)
**DB Isolation (P0):**
- Test connection string: kartselldb → kartselldb_test (prevents accidental production truncates)
- Production Host appsettings unchanged (kartselldb is correct for operations)

**Gate 3 Data Layer (P1):**
- Remove StubKrxDataService from ModelOperationsModule DI
- Register real KrxDataService as typed HttpClient in Program.cs
- KrxDataService already has built-in fallback to stub data when KRX_API_KEY is missing
- No behavior change for local dev (key missing → stub data); production ready (key present → real API)

**Tech Debt Registration (AGENTS.md no undocumented magic):**
- DEBT-009: PBO/Sharpe calculation simplified (needs proper CSCV methodology)
- DEBT-010: Model prediction uses fixed quantities (needs real position-sizing)
- DEBT-011: Cost 2x simulation uses linear formula (needs full re-simulation)
- DEBT-012: False-exit analysis unimplemented (always returns 0)
- DEBT-013: Plaintext DB password in appsettings.json (security debt)
- DEBT-014: Duplicate/reconciliation detection placeholders (infrastructure debt)

Gate 3 marked "rehearsal ready" (real KRX data, simplified analytics).
See TECH_DEBT_REGISTER.md for full impact/effort estimates.

Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-02 21:09:15 +09:00

123 lines
7.4 KiB
Markdown

# Tech Debt Register
**Governance:** Tracked per AGENTS.md v16.0. Quarterly paydown target: 20% by Impact.
---
## Summary
| Status | Count | Total Impact |
|--------|-------|--------------|
| Backlog | 6 | 12 pts |
| In Progress | 0 | 0 pts |
| Completed | 1 | 1 pt |
| No Action | 1 | 1 pt |
| Deferred | 4 | 4 pts |
| Accepted | 1 | 2 pts |
---
## Registry
### Code Analysis Suppressions
| ID | Category | Impact | Effort | Status | Notes | Owner | ADR |
|----|----------|--------|--------|--------|-------|-------|-----|
| DEBT-001 | CA1822 (static hints) | Low (1) | Low (1) | Completed | Applied `static` to GetNextDueAt, Evaluate, Plan methods; removed DI registrations. | @claude | PR 4b |
| DEBT-002 | CA1873 (array logging) | Low (1) | Low (1) | No Action | Already compliant: all logging uses LoggerMessage delegates. Verified PR 4b build with CA1873 enabled: 0 warnings. | @claude | Verified |
| DEBT-003 | CA1305 (culture) | Low (1) | Low (1) | Deferred | Locale-specific formatting. Accept as-is for Serilog; breaking change if fixed. Revisit if conditions change. | @claude | PR 4d |
| DEBT-004 | CA1707 (test naming) | Low (1) | Low (1) | Deferred | xUnit underscores in test names. Convention; no fix needed. Revisit if conditions change. | @claude | PR 4d |
| DEBT-005 | CA1861 (array overhead) | Low (1) | Low (1) | Deferred | Static readonly array allocations. Negligible perf; accept trade-off for readability. Revisit if conditions change. | @claude | PR 4d |
| DEBT-006 | xUnit2031 (filter) | Low (1) | Low (1) | Deferred | Use overload instead of .Where() for Assert.Single. Analyzer nit; defer. Revisit if conditions change. | @claude | PR 4d |
### Gate 3 Simplified Analytics (Deferred per v16.0)
| ID | Category | Impact | Effort | Status | Notes | Owner | ADR |
|----|----------|--------|--------|--------|-------|-------|-----|
| DEBT-009 | PBO/Sharpe calculation | High (3) | High (3) | Backlog | MetricsCalculator.cs:148,170 use simplified percentile formulas. Need proper CSCV-based PBO and DSR methodology. Required for production Sharpe baseline. Gate 3 rehearsal will use simplified version; full implementation deferred to separate work. | @claude | Gate 3 Rehearsal Scope |
| DEBT-010 | Model prediction logic | High (3) | High (3) | Backlog | ReplayEngine.cs:90,163 predict fixed quantities (100 units). Need actual position-sizing algorithm. Required for realistic cost simulation. Gate 3 uses fixed quantities; full implementation deferred. | @claude | Gate 3 Rehearsal Scope |
| DEBT-011 | Cost 2x simulation | High (3) | High (3) | Backlog | ShadowRunJob.cs:132 uses linear approximation (TotalReturn * 0.5m). Need full re-simulation with actual fee/slippage impact. Required for realistic scenario analysis. Gate 3 uses linear model; full implementation deferred. | @claude | Gate 3 Rehearsal Scope |
| DEBT-012 | False-exit analysis | High (3) | High (3) | Backlog | ShadowRunJob.cs:136-139, FalseExitAnalyzer.cs always returns 0. Unimplemented feature. Required for accurate sell-reason attribution. Gate 3 rehearsal does not include false-exit analysis; deferred to separate work. | @claude | Gate 3 Rehearsal Scope |
| DEBT-013 | Credentials in appsettings | High (3) | Low (1) | Backlog | Host/tests appsettings.json contains plaintext DB password (kartsell4321@!). Must migrate to Gitea Actions Secrets and environment variables. Security compliance required. | @claude | Security / Ops |
| DEBT-014 | Duplicate & reconciliation tracking | Medium (2) | Medium (2) | Backlog | MetricsSql.cs GetDuplicateDetectionAsync/GetReconciliationBreaksAsync return null placeholders. Requires operation_audit_trail population by job consumers + OutboxPollerJob hooks. Non-blocking; dashboard degrades gracefully. | @claude | Observability Enhancement |
### Deferred Refactoring
| ID | Category | Impact | Effort | Status | Notes | Owner | ADR |
|----|----------|--------|--------|--------|-------|-------|-----|
| DEBT-007 | Newtonsoft.Json override | Medium (2) | Medium (2) | Completed | Fixed in 88ea5ed: CA1848/CA1859 actual implementation. LoggerMessage + HashSet/Dictionary. | @claude | - |
| DEBT-008 | Namespace consistency | Medium (2) | Low (1) | Accepted | All projects use RootNamespace=KArtSell.Aegis; AssemblyName retained per-project for DLL clarity. Trade-off accepted: DLL clarity > namespace alignment. No action. | @claude | PR 4d |
---
## Impact/Effort Matrix (Updated: PR 4)
```
Low Effort High Effort
High Impact QUICK WINS ROADMAP
(DEBT-007✓) (none currently)
Low Impact QUICK WINS MONITOR
(DEBT-001/002) (DEBT-003/004/005/006/008)
```
### Quick Wins — Q3 2026 (Completed)
**Rationale (per AGENTS.md v16.0 "Paydown Target: 20% quarterly"):**
- ✅ DEBT-001 (CA1822): static method hints — Completed in PR 4b. Applied `static` to ScheduleOccurrencePlanner.GetNextDueAt, PromotionGateEvaluator.Evaluate, EvaluationWindowPlanner.Plan; removed unnecessary DI registrations (+1 pt).
- ✅ DEBT-002 (CA1873): array logging — Already compliant: all logging uses LoggerMessage delegates. Verified in PR 4b build with CA1873 enabled: 0 warnings. No action needed (+0 pts, marked "No Action").
- Result: +1 pt resolved (25% of 4pt target). Target rate achievable by completing additional small-effort items from remaining backlog.
### Batch During Feature Work
- ~~DEBT-001~~, ~~DEBT-002~~ — Moving to Quick Wins (PR 4 priority)
### Monitor & Defer (No Action)
**Rationale (per AGENTS.md "Keep in backlog; revisit if conditions change"):**
- **DEBT-003 (CA1305 culture):** Locale formatting. Accept as-is for Serilog. Breaking change risk > benefit. **Status: Permanently defer**
- **DEBT-004 (CA1707 test naming):** xUnit convention (underscores). No fix needed; convention not a defect. **Status: Permanently defer**
- **DEBT-005 (CA1861 array overhead):** Static readonly arrays. Negligible perf; readability priority. **Status: Permanently defer**
- **DEBT-006 (xUnit2031 filter):** Assert.Single overload vs .Where(). Style preference, not safety. **Status: Permanently defer**
- **DEBT-008 (Namespace consistency):** Per-project AssemblyName intentional (DLL clarity). No action needed. **Status: Accepted**
---
## Paydown Tracking
### Q3 2026 (Current)
- **Target:** 20% of total impact resolved = 4 pts
- **Completed:** DEBT-007 (2 pts) — 50% of target achieved
- **PR 4 Plan:** DEBT-001 + DEBT-002 (2 pts) — Complete 100% of target ✅
- PR 4a: Evaluation & finalization (this commit)
- PR 4b: DEBT-001 — CA1822 static methods implementation
- PR 4c: DEBT-002 — CA1873 array logging optimization
- PR 4d: Permanent defer decisions for DEBT-003~006
### Q4 2026
- **Target:** 20% = 4 pts (cumulative: 8 pts / 40% debt)
- **Plan:** TBD after Q3 completion
### Q1 2027
- **Target:** 20% = 4 pts (cumulative: 12 pts / 60% debt)
- **Plan:** TBD
---
## How to Resolve Tech Debt
1. **Identify:** Find in this register or add new entry with Impact/Effort estimate
2. **Estimate:** Low (1) / Medium (2) / High (3) for each dimension
3. **Schedule:** Pick based on matrix above
4. **Implement:** Separate PR, reference Debt ID in commit message (e.g., `TECH-007: Fix CA1848`)
5. **Verify:** Update register (move to Completed, record date + ADR link)
6. **Retrospective:** Review in sprint retro; aim for 20% quarterly paydown
---
## Related Documents
- **Governance:** [`AGENTS.md`](AGENTS.md#13-tech-debt-management-tech-debt-registry)
- **Tracking:** [`CLAUDE.md`](CLAUDE.md#tech-debt-management)
- **Decision Log:** See individual PR commit messages and ADRs