PHASE-1_APPROVAL_MONITORING.md provides comprehensive monitoring toolkit: Core Monitoring Features: ✅ Approval Status Dashboard (8 critical items, real-time tracking) ✅ Daily Monitoring Checklist (9 AM, 3 PM, 5 PM gates) ✅ Response Tracking Template (evidence collection) ✅ Critical Timeline with Monitoring Gates (Day 1-6) ✅ Escalation Procedure (3-tier escalation path) ✅ Daily Summary Report Template (stakeholder updates) ✅ Final Sign-off Document (consolidation) ✅ Stakeholder Contact Quick Reference Timeline Breakdown: - Day 1 (Today): Distribution + initial check - Day 2 (Wed): Early response collection - Day 3 (Fri): 🔴 B+C DEADLINE (infrastructure) - Day 4 (Sat): 🟠 A+D DEADLINE (governance/data) - Day 5 (Sun): 🟡 E (monitoring, optional) - Day 6 (Mon): 🔐 Go/No-Go DECISION Escalation Rules: - T-2 days: Friendly reminder email - T-1 day: Urgent email (copy manager) - T-0 same: Direct phone call - T+1 overdue: Executive escalation Critical Success Factors: - A.1-A.3 (law/compliance) → MUST APPROVE - B.1-B.2 (infrastructure) → MUST PASS - C.1 (tools) → MUST PASS - D.1 (data) → MUST PASS AGENTS.md: Traceability (all responses documented), Right-Way (structured process vs ad-hoc), Maturity (complete coordination toolkit). Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
404 lines
13 KiB
Markdown
404 lines
13 KiB
Markdown
# Phase 1 Readiness — Stakeholder Approval Monitoring
|
|
|
|
**Date Created:** 2026-08-07
|
|
**Monitoring Period:** 2026-08-07 → 2026-08-12
|
|
**Owner:** Platform Lead
|
|
**Purpose:** Track stakeholder sign-offs in real-time
|
|
|
|
---
|
|
|
|
## 📊 APPROVAL STATUS DASHBOARD
|
|
|
|
### Critical Path (MUST PASS by 2026-08-12)
|
|
|
|
| Section | Owner | Task | Deadline | Status | Response Date | Notes |
|
|
|---------|-------|------|----------|--------|---------------|-------|
|
|
| **A.1** | Law Lead | DEC-037 (Source/License/SLA) | 2026-08-10 | ⏳ PENDING | ___________ | Approval document: ___________ |
|
|
| **A.2** | DataGov Lead | DEC-038 (Calendar/Owner) | 2026-08-12 | ⏳ PENDING | ___________ | Owner assigned: ___________ |
|
|
| **A.3** | DataGov Lead | DEC-079 (Timezone/SLA) | 2026-08-12 | ⏳ PENDING | ___________ | SLA confirmed: ___________ |
|
|
| **A.4** | Business Owner | VersionSet (model_id/dataset_id) | TBD | ⏳ PENDING | ___________ | Model ID: __________ Dataset ID: __________ |
|
|
| **B.1** | DBA | Database Connectivity | 2026-08-09 | ⏳ PENDING | ___________ | Migration 0032 verified: YES / NO |
|
|
| **B.2** | Backend Lead | Host Running (Debug mode) | 2026-08-09 | ⏳ PENDING | ___________ | Startup logs attached: YES / NO |
|
|
| **C.1** | SRE | freeze-versionset.ps1 Dry-run | 2026-08-09 | ⏳ PENDING | ___________ | Test output: ___________ |
|
|
| **D.1** | Quant Lead | Model/Dataset/Market Data | 2026-08-10 | ⏳ PENDING | ___________ | Data quality score: _____% |
|
|
|
|
**Legend:** ⏳ PENDING | ✅ APPROVED | ⚠️ NEEDS INFO | ❌ REJECTED | 🚫 OVERDUE
|
|
|
|
---
|
|
|
|
## 🔔 DAILY MONITORING CHECKLIST
|
|
|
|
### **Every Morning (9 AM)**
|
|
|
|
- [ ] Check email for overnight responses (A-F sections)
|
|
- [ ] Update dashboard above with latest status
|
|
- [ ] Identify any OVERDUE items (>24h no response)
|
|
- [ ] Note any "⚠️ NEEDS INFO" flagged by stakeholders
|
|
- [ ] Escalate if needed (see Escalation Procedure below)
|
|
|
|
### **Daily Afternoon Check (3 PM)**
|
|
|
|
- [ ] Send reminder emails to sections with no response (see template below)
|
|
- [ ] Verify test execution status (B/C sections)
|
|
- [ ] Compile partial approvals (if any ✅)
|
|
- [ ] Document blockers
|
|
|
|
### **End of Day (5 PM)**
|
|
|
|
- [ ] Record all responses in tracking sheet
|
|
- [ ] Update risk assessment (on-track vs at-risk vs blocked)
|
|
- [ ] Send daily summary to stakeholders (template below)
|
|
|
|
---
|
|
|
|
## 📬 RESPONSE TRACKING TEMPLATE
|
|
|
|
**For Each Approval Received:**
|
|
|
|
```
|
|
Section: [A/B/C/D/E/F]
|
|
Owner: [Name]
|
|
Email Received: [Date/Time]
|
|
Status: ✅ APPROVED / ⚠️ NEEDS INFO / ❌ REJECTED
|
|
|
|
Sign-off: [Name] + [Date]
|
|
Notes/Blockers:
|
|
- Item 1: [status]
|
|
- Item 2: [status]
|
|
|
|
Evidence Attached:
|
|
- ✅ / ❌ SQL query results
|
|
- ✅ / ❌ Build logs
|
|
- ✅ / ❌ Test output
|
|
- ✅ / ❌ Approval document
|
|
|
|
Follow-up Required: YES / NO
|
|
If YES: [Description]
|
|
```
|
|
|
|
---
|
|
|
|
## ⏰ CRITICAL TIMELINE WITH MONITORING GATES
|
|
|
|
### **Day 1 (2026-08-07 — TODAY)**
|
|
|
|
**Morning:**
|
|
- [ ] Send distribution email to all stakeholders
|
|
- [ ] Log distribution timestamp
|
|
- [ ] Record expected response dates
|
|
|
|
**Evening:**
|
|
- [ ] Check for early responses (enthusiastic teams)
|
|
- [ ] Document any immediate questions
|
|
- [ ] Verify all stakeholders received email
|
|
|
|
**Status:** 📧 Distribution sent, awaiting responses
|
|
|
|
---
|
|
|
|
### **Day 2 (2026-08-08 — WEDNESDAY)**
|
|
|
|
**Morning:**
|
|
- [ ] Check email for responses
|
|
- [ ] Expected: Early B/C responses (infrastructure teams often fastest)
|
|
- [ ] Note: No hard deadline yet (still 1-2 days away)
|
|
|
|
**Afternoon:**
|
|
- [ ] Send reminder to B/C if no response
|
|
- [ ] Message: "Infrastructure validation due Friday EOD"
|
|
|
|
**Evening:**
|
|
- [ ] Compile first batch of responses
|
|
- [ ] Identify any "⚠️ NEEDS INFO" from stakeholders
|
|
|
|
**Status:** 🔄 In progress, early responses expected
|
|
|
|
---
|
|
|
|
### **Day 3 (2026-08-09 — FRIDAY) 🔴 B+C DEADLINE**
|
|
|
|
**Morning:**
|
|
- [ ] **CRITICAL:** Check B+C responses urgently
|
|
- [ ] Infrastructure (B.1-B.3) MUST submit today
|
|
- [ ] Tools validation (C.1-C.3) MUST submit today
|
|
|
|
**Afternoon:**
|
|
- [ ] If B/C missing by 2 PM: escalate to Backend Lead / SRE Lead
|
|
- [ ] Verify test results (dry-run outputs, SQL queries)
|
|
- [ ] Document any blockers immediately
|
|
|
|
**Evening (5 PM):**
|
|
- [ ] Deadline for B+C: **HARD STOP**
|
|
- [ ] Tally completed sections
|
|
- [ ] Send Day 3 summary to stakeholders
|
|
- [ ] If missing: trigger escalation protocol
|
|
|
|
**Status:** 🔴 **CRITICAL DEADLINE** — B+C must respond today
|
|
|
|
**Go/No-Go Criteria for B+C:**
|
|
- B.1: Migration 0032 ✅ present
|
|
- B.2: Host ✅ runs in Debug mode
|
|
- C.1: freeze-versionset.ps1 ✅ dry-run passes
|
|
|
|
**If GO:** Continue monitoring A/D
|
|
**If NO-GO:** Document blocker, escalate to Platform Lead
|
|
|
|
---
|
|
|
|
### **Day 4 (2026-08-10 — SATURDAY) 🟠 A+D DEADLINE**
|
|
|
|
**Morning:**
|
|
- [ ] Check A+D responses urgently
|
|
- [ ] Governance (A.1-A.4) MUST submit today
|
|
- [ ] Data quality (D.1-D.2) MUST submit today
|
|
|
|
**Afternoon:**
|
|
- [ ] If A/D missing by 2 PM: escalate to Law Lead / DataGov Lead / Quant Lead
|
|
- [ ] Verify approval documents for A.1-A.3
|
|
- [ ] Verify data quality queries for D.1-D.2
|
|
|
|
**Evening (5 PM):**
|
|
- [ ] Deadline for A+D: **HARD STOP**
|
|
- [ ] Tally completed sections (A+B+C+D status)
|
|
- [ ] Send Day 4 summary
|
|
- [ ] If missing: trigger escalation protocol
|
|
|
|
**Status:** 🟠 **CRITICAL DEADLINE** — A+D must respond today
|
|
|
|
**Go/No-Go Criteria for A+D:**
|
|
- A.1: DEC-037 ✅ approved
|
|
- A.2: DEC-038 ✅ approved
|
|
- A.3: DEC-079 ✅ approved
|
|
- D.1: Model/Data ✅ validated
|
|
|
|
**If 3/4 A+ D APPROVED:** Continue, may defer A.4 (Business)
|
|
**If <3/4:** Document blockers, escalate immediately
|
|
|
|
---
|
|
|
|
### **Day 5 (2026-08-11 — SUNDAY) 🟡 E MONITORING (OPTIONAL)**
|
|
|
|
**Morning:**
|
|
- [ ] Check E responses (monitoring setup, non-blocking)
|
|
- [ ] This is **recommended but NOT blocking** Phase 1 activation
|
|
|
|
**Evening:**
|
|
- [ ] Optional deadline for E
|
|
- [ ] If missing: Can proceed to F decision (E can be set up during Phase 1)
|
|
|
|
**Status:** 🟡 **OPTIONAL** — E does not block Go/No-Go
|
|
|
|
---
|
|
|
|
### **Day 6 (2026-08-12 — MONDAY) 🔐 FINAL GO/NO-GO**
|
|
|
|
**Morning:**
|
|
- [ ] Final compilation of all approvals (A-E)
|
|
- [ ] Verify all sign-offs collected
|
|
- [ ] Review blockers (if any)
|
|
|
|
**Noon:**
|
|
- [ ] Platform Lead reviews Section F (Go/No-Go Matrix)
|
|
- [ ] Decision: GO vs. NO-GO
|
|
|
|
**Afternoon (Decision Window):**
|
|
- [ ] **GO (All gates ✅):** Send activation signal to SRE
|
|
```
|
|
Go decision: APPROVED
|
|
Ready for activation: STEP 1-3 (freeze → generate → enqueue)
|
|
Launch window: [Date/Time]
|
|
```
|
|
- [ ] **NO-GO (Any gate ❌):** Document blocker, schedule recovery
|
|
```
|
|
No-Go reason: [specific blocker]
|
|
Remediation plan: [steps to resolve]
|
|
Retry date: [when to re-assess]
|
|
```
|
|
|
|
**End of Day (5 PM):**
|
|
- [ ] Final summary email to all stakeholders
|
|
- [ ] Archive all approval documents
|
|
|
|
**Status:** 🔐 **FINAL DECISION** — Go/No-Go declared
|
|
|
|
---
|
|
|
|
## 🚨 ESCALATION PROCEDURE
|
|
|
|
**When:** Section missing response by 50% of deadline (or upon request)
|
|
|
|
**Who:** Platform Lead (escalate to)
|
|
**Escalation Path:**
|
|
1. **First Reminder (T-2 days):** Friendly reminder email, include deadline
|
|
2. **Second Reminder (T-1 day):** Urgent email, copy manager/lead
|
|
3. **Escalation (T-0 same day):** Direct phone call to section owner
|
|
4. **Executive Escalation (T+1 overdue):** Escalate to [Executive Sponsor]
|
|
|
|
**Escalation Email Template:**
|
|
|
|
```
|
|
Subject: URGENT — Phase 1 Readiness [Section X] Validation Overdue
|
|
|
|
Dear [Section Owner],
|
|
|
|
Phase 1 shadow run readiness validation is **OVERDUE** for Section [X].
|
|
|
|
REQUIRED ACTIONS:
|
|
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
|
|
[List specific items from section X that need completion]
|
|
|
|
DEADLINE: [Date] EOD (in [N] hours)
|
|
|
|
If you encounter blockers, contact [Platform Lead] immediately.
|
|
This is a critical gate for Phase 1 activation.
|
|
|
|
[Signature]
|
|
```
|
|
|
|
---
|
|
|
|
## 📈 DAILY SUMMARY REPORT
|
|
|
|
**Template for 5 PM Daily Email to Stakeholders:**
|
|
|
|
```
|
|
Subject: Phase 1 Readiness — Daily Progress (2026-08-0X)
|
|
|
|
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
|
|
📊 TODAY'S STATUS
|
|
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
|
|
|
|
✅ APPROVED TODAY:
|
|
- [Section X]: [Item] (approved by [Name])
|
|
- [Section Y]: [Item] (approved by [Name])
|
|
|
|
⏳ STILL PENDING:
|
|
- [Section X]: [Item] — Deadline: [Date]
|
|
- [Section Y]: [Item] — Deadline: [Date]
|
|
|
|
⚠️ NEEDS INFO (Awaiting Clarification):
|
|
- [Section X]: [Item] — Question: [...]
|
|
|
|
❌ BLOCKERS (If any):
|
|
- [Section X]: [Item] — Issue: [...]
|
|
|
|
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
|
|
🎯 OUTLOOK
|
|
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
|
|
|
|
On-Track: YES / NO
|
|
[Brief assessment: are we tracking to Go/No-Go decision on 2026-08-12?]
|
|
|
|
Risks:
|
|
- [Risk 1]: [Mitigation plan]
|
|
|
|
Next Deadline: [Section X] due [Date] EOD
|
|
|
|
Questions? Contact [Platform Lead]
|
|
|
|
[Sender]
|
|
```
|
|
|
|
---
|
|
|
|
## 📋 RESPONSE CONSOLIDATION (Final)
|
|
|
|
**When All Responses Received (by 2026-08-12):**
|
|
|
|
Create final sign-off document:
|
|
|
|
```
|
|
═══════════════════════════════════════════════════════════════
|
|
PHASE 1 READINESS VALIDATION — FINAL SIGN-OFF RECORD
|
|
Date: 2026-08-12
|
|
═══════════════════════════════════════════════════════════════
|
|
|
|
SECTION A: GOVERNANCE & APPROVALS
|
|
A.1 (DEC-037): ✅ APPROVED by [Law Lead] on [Date]
|
|
A.2 (DEC-038): ✅ APPROVED by [DataGov] on [Date]
|
|
A.3 (DEC-079): ✅ APPROVED by [DataGov] on [Date]
|
|
A.4 (VersionSet): ✅ APPROVED by [Business] on [Date]
|
|
|
|
SECTION B: INFRASTRUCTURE
|
|
B.1 (Database): ✅ APPROVED by [DBA] on [Date]
|
|
B.2 (Host): ✅ APPROVED by [BE Lead] on [Date]
|
|
B.3 (Frontend): ✅ APPROVED by [FE Lead] on [Date]
|
|
|
|
SECTION C: TOOLS
|
|
C.1 (freeze): ✅ APPROVED by [SRE] on [Date]
|
|
C.2 (generate): ✅ APPROVED by [SRE] on [Date]
|
|
C.3 (Runbook): ✅ APPROVED by [SRE Lead] on [Date]
|
|
|
|
SECTION D: DATA QUALITY
|
|
D.1 (Model/Data): ✅ APPROVED by [Quant] on [Date]
|
|
D.2 (PIT Queries): ✅ APPROVED by [Data Arch] on [Date]
|
|
|
|
SECTION E: MONITORING (Optional)
|
|
E.1 (Logging): ✅ APPROVED by [SRE] on [Date]
|
|
E.2 (Alerts): ✅ APPROVED by [Observability] on [Date]
|
|
|
|
═══════════════════════════════════════════════════════════════
|
|
FINAL DECISION: GO / NO-GO
|
|
═══════════════════════════════════════════════════════════════
|
|
|
|
Decision: ☐ GO (Proceed to Phase 1 activation)
|
|
☐ NO-GO (Defer, reason: [_____])
|
|
|
|
Approved By: [Platform Lead]
|
|
Date: [Date]
|
|
Time: [Time]
|
|
|
|
Launch Window (if GO): [Date/Time] UTC
|
|
Emergency Contact: [Name/Phone]
|
|
|
|
Next Steps: [STEP 1-3 activation or defer plan]
|
|
```
|
|
|
|
---
|
|
|
|
## 🎯 SUCCESS CRITERIA
|
|
|
|
**GO Decision Requires:**
|
|
- ✅ All Section A items approved (A.1-A.3 MUST, A.4 SHOULD)
|
|
- ✅ All Section B-D items approved (blocking gates)
|
|
- ✅ Section E recommended (non-blocking)
|
|
- ✅ Emergency procedures documented
|
|
- ✅ On-call team briefed
|
|
|
|
**NO-GO Triggers:**
|
|
- ❌ Any Section A approval missing (law/compliance)
|
|
- ❌ Any Section B-D approval missing (infrastructure/data)
|
|
- ❌ Unresolved blocker without mitigation
|
|
- ❌ Data quality issue >10% bad rows
|
|
|
|
---
|
|
|
|
## 📞 STAKEHOLDER CONTACT QUICK REFERENCE
|
|
|
|
| Section | Owner | Email | Phone | Backup |
|
|
|---------|-------|-------|-------|--------|
|
|
| A | Law Lead | ___________ | ___________ | ___________ |
|
|
| A | DataGov Lead | ___________ | ___________ | ___________ |
|
|
| B | Backend Lead | ___________ | ___________ | ___________ |
|
|
| B | DBA | ___________ | ___________ | ___________ |
|
|
| C | SRE Lead | ___________ | ___________ | ___________ |
|
|
| D | Quant Lead | ___________ | ___________ | ___________ |
|
|
| D | Data Architect | ___________ | ___________ | ___________ |
|
|
| E | SRE/Observability | ___________ | ___________ | ___________ |
|
|
|
|
---
|
|
|
|
## ✅ MONITORING COMPLETION CHECKLIST
|
|
|
|
- [ ] Dashboard created and printed
|
|
- [ ] Daily checklist scheduled (9 AM, 3 PM, 5 PM reminders)
|
|
- [ ] Escalation procedure defined
|
|
- [ ] Stakeholder contacts populated
|
|
- [ ] Summary report template saved
|
|
- [ ] All monitoring docs in `docs/CURRENT/`
|
|
- [ ] Final sign-off template prepared
|
|
|
|
---
|
|
|
|