Files
KArtSell.Aegis/metrics/pbo_dsr_validation.md
kjh2064 a55c9d617d
ci / backend (push) Failing after 0s
Build & Test with Secrets / build (push) Failing after 1s
ci / static (push) Failing after 8s
Build & Test with Secrets / security-scan (push) Failing after 5s
Build & Test with Secrets / frontend (push) Successful in 2m57s
Build & Test with Secrets / notification (push) Failing after 1s
ci / frontend (push) Successful in 3m5s
chore: Add Phase 2-3 validation templates for Gate 5 roadmap execution
Phase 2: PBO/DSR Metrics Validation
- Template for collecting Probability of Backtest Overfit metrics
- DSR (Daily Sharpe Ratio) validation checklist
- OOS (Out-of-Sample) performance by market phase
- Pass/fail criteria for each metric
- Evidence collection and archiving plan

Phase 3: Crash Recovery Rehearsal
- Four failure scenarios: outbox loss, DB drop, lock timeout, inbox failure
- Recovery procedures: state reconciliation, message replay, lock recovery
- Test result tracking matrix
- Verification checklist for each procedure
- Evidence documentation

Status (2026-08-03 22:30 KST):
 Phase 1 (Job 893): RUNNING (22:04 KST start)
 Phase 2 template: READY
 Phase 3 template: READY
 Phase 4 template: NEXT

These templates enable systematic Phase 2-3 execution when Phase 1 completes.

Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-03 22:12:20 +09:00

2.1 KiB

Gate 5: PBO/DSR Metrics Validation Report

Status: IN PREPARATION
Phase: 2 (Post Job 893 Execution)
Timeline: TBD (5-10 days after Phase 1)
Template Version: 2026-08-03


📊 Metrics Summary

PBO (Probability of Backtest Overfit)

Metric Target Result Status
PBO Value ≥ ? TBD Pending
CSCV Score ≥ ? TBD Pending
Confidence Interval 95% TBD Pending
Sample Size 252+ days TBD Pending

DSR (Daily Sharpe Ratio)

Metric Target Result Status
DSR Value > baseline TBD Pending
Baseline ? TBD Pending
Minimum Period 252 days TBD Pending
Volatility Acceptable TBD Pending

Validation Checklist

PBO Validation

  • Data extracted from Job 893
  • CSCV methodology applied (or simplified variant if DEBT-009 deferred)
  • Cross-validation performed
  • Confidence intervals calculated
  • Results within acceptable range
  • Evidence documented

DSR Validation

  • Daily returns calculated
  • Sharpe ratio computed (252-day window)
  • Baseline threshold established
  • DSR > baseline verified
  • No data gaps detected
  • Results documented

OOS (Out-of-Sample) Performance

  • Bull market phase: DSR = ?
  • Bear market phase: DSR = ?
  • Sideways market phase: DSR = ?
  • Results within acceptable range
  • No systematic failure detected

📝 Findings

PBO Analysis

[To be completed during Phase 2]

Observation:
Conclusion:
Impact: 

DSR Analysis

[To be completed during Phase 2]

Observation:
Conclusion:
Impact:

OOS Phase Analysis

[To be completed during Phase 2]

Bull Market DSR: TBD
Bear Market DSR: TBD
Sideways Market DSR: TBD

Overall: TBD

Gate 5 Phase 2 Completion

  • All metrics collected
  • Validation complete
  • Evidence archived
  • Report approved
  • Status: PASS or FAIL (TBD)

Next: Phase 3 (Crash Recovery Rehearsal)