722c1d7306
Complete execution roadmap in one concise guide 5-Minute Overview: 1. Pre-Flight (15 min) - Infrastructure verification 2. Prepare Database (5 min) - Setup scripts 3. Execute Shadow Run (30-60 min) - Monitor via dashboard 4. Validate Results (10 min) - SQL gate checks 5. Approve (5 min) - Maker-checker workflow Total Time: ~90-120 minutes end-to-end References all 5 guides in execution order with time estimates Quick navigation to troubleshooting & support paths Status summary: PRODUCTION-READY Complete Toolkit Now Available: ✓ GATE_3_QUICK_START.md (this file - navigation hub) ✓ GATE_3_EXECUTION_GUIDE.md (detailed 7-section guide) ✓ GATE_3_PREFLIGHT_CHECKLIST.md (15-min verification) ✓ GATE_3_SETUP_SCRIPTS.md (automation & scripts) ✓ GATE_3_RESULTS_VALIDATION.md (post-execution checks) ✓ GATE_3_TROUBLESHOOTING.md (recovery & escalation) All 5 production readiness gates implemented & documented: - Gate 1: DbUp migrations ✅ - Gate 2: Crash-recovery ✅ - Gate 3: Shadow run (READY FOR EXECUTION) ✅ - Gate 4: Activation workflow ✅ - Gate 5: Observability metrics ✅ Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
126 lines
3.5 KiB
Markdown
126 lines
3.5 KiB
Markdown
# Gate 3 Execution Quick Start
|
|
|
|
**Complete production readiness package for 252-day shadow run validation**
|
|
|
|
---
|
|
|
|
## 📋 How to Execute (5-Minute Summary)
|
|
|
|
### Step 1: Pre-Flight (15 min)
|
|
```bash
|
|
# Read this first
|
|
GATE_3_PREFLIGHT_CHECKLIST.md
|
|
|
|
# Run scripts to verify infrastructure
|
|
.\gate3_test_api.ps1
|
|
.\gate3_check_market_data.ps1
|
|
```
|
|
|
|
### Step 2: Prepare Database (5 min)
|
|
```bash
|
|
# Create test model if needed
|
|
# Run: GATE_3_SETUP_SCRIPTS.md SQL scripts
|
|
# Creates: model, cleans state, verifies schema
|
|
```
|
|
|
|
### Step 3: Execute Shadow Run (30-60 min)
|
|
```bash
|
|
# Follow GATE_3_EXECUTION_GUIDE.md
|
|
# POST /api/shadow-runs with model ID + date window
|
|
# Monitor via Hangfire dashboard + polling script
|
|
```
|
|
|
|
### Step 4: Validate Results (10 min)
|
|
```bash
|
|
# Read: GATE_3_RESULTS_VALIDATION.md
|
|
# Run SQL queries to verify gates (PBO, DSR, Cost2x)
|
|
# Decision: Proceed to approval or remediate
|
|
```
|
|
|
|
### Step 5: Approve (5 min)
|
|
```bash
|
|
# Approval queue auto-populated
|
|
# Maker-checker approval via POST /api/v1/approval-queue/{id}/approve
|
|
# Model ready for activation
|
|
```
|
|
|
|
**Total Time:** ~90-120 minutes
|
|
|
|
---
|
|
|
|
## 📚 Complete Toolkit (5 Guides)
|
|
|
|
### GATE_3_EXECUTION_GUIDE.md
|
|
- **Length:** 7 sections, 200+ lines
|
|
- **Purpose:** Step-by-step execution checklist
|
|
- **Contains:** Prerequisites, endpoints, monitoring, validation
|
|
|
|
### GATE_3_PREFLIGHT_CHECKLIST.md
|
|
- **Length:** 5 sections, 150+ lines
|
|
- **Purpose:** 15-minute infrastructure verification
|
|
- **Contains:** SSH tunnel, PostgreSQL, API health, model selection, success criteria
|
|
|
|
### GATE_3_SETUP_SCRIPTS.md
|
|
- **Length:** 6 scripts, 300+ lines
|
|
- **Purpose:** Automated database & API preparation
|
|
- **Contains:** SQL scripts, PowerShell automation, monitoring loops
|
|
|
|
### GATE_3_RESULTS_VALIDATION.md
|
|
- **Length:** 4 sections, 250+ lines
|
|
- **Purpose:** Post-execution validation of gates
|
|
- **Contains:** Gate breakdown (PBO/DSR/Cost2x), phase analysis, audit trail
|
|
|
|
### GATE_3_TROUBLESHOOTING.md
|
|
- **Length:** 15+ issues, 300+ lines
|
|
- **Purpose:** Recovery & escalation for common failures
|
|
- **Contains:** Root causes, fixes, quick-fix table, escalation paths
|
|
|
|
---
|
|
|
|
## ✅ What You Have
|
|
|
|
**Complete, Production-Ready Execution Package:**
|
|
- ✅ 5 comprehensive guides (1,200+ lines)
|
|
- ✅ 30+ copy-paste SQL queries
|
|
- ✅ 6 PowerShell automation scripts
|
|
- ✅ Decision matrices for gate failures
|
|
- ✅ Escalation contact matrix
|
|
- ✅ Prevention & recovery checklists
|
|
|
|
**What's Already Done (Gates 1-5):**
|
|
- ✅ Gate 1: DbUp migrations (14 tests)
|
|
- ✅ Gate 2: Crash-recovery (6 tests)
|
|
- ✅ Gate 3: Shadow run (6 E2E tests + execution guides)
|
|
- ✅ Gate 4: Activation workflow (6 tests + endpoints)
|
|
- ✅ Gate 5: Observability metrics (6 tests + service)
|
|
|
|
---
|
|
|
|
## 🚀 Next Actions
|
|
|
|
1. **Read GATE_3_PREFLIGHT_CHECKLIST.md** (15 min verification)
|
|
2. **Run setup scripts** from GATE_3_SETUP_SCRIPTS.md (prepare DB)
|
|
3. **Follow GATE_3_EXECUTION_GUIDE.md** (execute shadow run)
|
|
4. **Validate with GATE_3_RESULTS_VALIDATION.md** (verify gates)
|
|
5. **Troubleshoot if needed** using GATE_3_TROUBLESHOOTING.md
|
|
|
|
---
|
|
|
|
## 📞 Support
|
|
|
|
- **Pre-flight issues?** → GATE_3_PREFLIGHT_CHECKLIST.md troubleshooting
|
|
- **Setup problems?** → GATE_3_SETUP_SCRIPTS.md scripts section
|
|
- **Execution failing?** → GATE_3_TROUBLESHOOTING.md
|
|
- **Results unclear?** → GATE_3_RESULTS_VALIDATION.md decision matrix
|
|
|
|
---
|
|
|
|
## Status
|
|
|
|
**All production readiness validation gates: READY FOR EXECUTION**
|
|
|
|
Last updated: 2026-08-02
|
|
Preparation toolkit: COMPLETE
|
|
Infrastructure automation: READY
|
|
Documentation: COMPREHENSIVE
|