1 Commits

Author SHA1 Message Date
kjh2064 a55c9d617d chore: Add Phase 2-3 validation templates for Gate 5 roadmap execution
ci / backend (push) Failing after 0s
Build & Test with Secrets / build (push) Failing after 1s
ci / static (push) Failing after 8s
Build & Test with Secrets / security-scan (push) Failing after 5s
Build & Test with Secrets / frontend (push) Successful in 2m57s
Build & Test with Secrets / notification (push) Failing after 1s
ci / frontend (push) Successful in 3m5s
Phase 2: PBO/DSR Metrics Validation
- Template for collecting Probability of Backtest Overfit metrics
- DSR (Daily Sharpe Ratio) validation checklist
- OOS (Out-of-Sample) performance by market phase
- Pass/fail criteria for each metric
- Evidence collection and archiving plan

Phase 3: Crash Recovery Rehearsal
- Four failure scenarios: outbox loss, DB drop, lock timeout, inbox failure
- Recovery procedures: state reconciliation, message replay, lock recovery
- Test result tracking matrix
- Verification checklist for each procedure
- Evidence documentation

Status (2026-08-03 22:30 KST):
 Phase 1 (Job 893): RUNNING (22:04 KST start)
 Phase 2 template: READY
 Phase 3 template: READY
 Phase 4 template: NEXT

These templates enable systematic Phase 2-3 execution when Phase 1 completes.

Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-03 22:12:20 +09:00