Commit Graph

1 Commits

Author SHA1 Message Date
kjh2064 3d9d617c4c docs: ONGOING_MONITORING_SYSTEM - 50-90 Day Autonomous Support
Comprehensive monitoring & support system for Phase 1 execution:

Daily Monitoring:
 Phase 1 health check (automated 5-min)
 Job 893 status (automated 5-min)
 Production health (automated 5-min)
 Log rotation (automated)

Weekly Reports:
 Progress status (automated)
 Production metrics (automated)
 Incident tracking (if any)

Monthly Checklist:
 Phase 1 progress verification
 Production stability review
 Documentation updates
 Contingency testing

Alert Conditions:
 Phase 1 down: Restart procedure
 Job stuck: Investigate logs
 Production down: Rollback procedure

Support Procedures:
 Issue identification
 Root cause analysis
 Recovery steps
 Documentation

Automated Execution:
 No manual intervention required (50-90 days)
 Self-monitoring active
 Self-reporting configured
 Auto-escalation ready

Timeline:
- 50-90 days: Phase 1 autonomous execution
- Upon completion: Phase 3-4 auto-trigger
- Final result: 100% WBS completion

Status: 🟢 READY FOR AUTONOMOUS OPERATION

All monitoring documented and ready.
All support procedures prepared.
All contingencies planned.

Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-04 15:24:15 +09:00