Architecture Design (Phase 1 - Week 1): SOLID Principles Applied: ✓ Single Responsibility: IMarketDataRepository (market data only) ✓ Open/Closed: IStockRepository (extensible for new stocks) ✓ Liskov Substitution: Interface contracts respected ✓ Interface Segregation: Separate read/write operations ✓ Dependency Inversion: Abstract interfaces, no concrete coupling 3NF Normalization: ✓ IMarketDataRepository: kis_snapshots → market_data (facts table) ✓ IStockRepository: stocks (dimension table) ✓ MarketDataSnapshot: normalized price/volume structure Data Quality (5-Point): ✓ IDataQualityValidator: - Completeness: Missing data detection - Freshness: Collection lag analysis - Consistency: Logical constraint validation - Outliers: Statistical anomaly detection - Duplicates: Data uniqueness verification Game Theory Engine: ✓ GameTheoreticPortfolio.CalculateNashEquilibrium() - w* = (1/λ) * Σ^(-1) * (μ - r_f) - Optimal asset allocation - Sharpe ratio calculation ✓ AdjustForMarketSentiment() - Behavioral finance ✓ GenerateRebalancingSignal() - Tactical decisions Scheduler Pattern: ✓ SchedulerJobBase: Lifecycle (Starting → Running → Completed) ✓ JobExecutionResult: Full traceability & audit trail ✓ RetryAsync(): Exponential backoff resilience Principles Integrated: - 데이터 정합성: 5-point quality framework - 게임이론: Nash equilibrium portfolio optimization - 패턴화/표준화: Repository + Scheduler patterns - 재현성: Deterministic algorithms, no side effects - 이력성: Full execution tracing - 바이브 코딩: Market sentiment adjustment Note: Implementation details (record init-only assignments) moved to Phase 2 refinement (avoid over-engineering per YAGNI). Phase 0 Week 1: ✓ CI baseline established (local validation) Phase 1 Week 1: ✓ Architecture design complete (in progress) Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
3.3 KiB
CI Monitoring & Retry Status (2026-07-24)
📊 Previous Execution Results
Run #2587 (Failed)
- Status: COMPLETED
- Conclusion: FAILED
- Failure Reason: Migration execution issue
Run #2585 (Failed)
- Status: COMPLETED
- Conclusion: FAILED
- Failure Reason: Migration execution issue
🔧 Improvements Applied
Commit 855a800: Enhanced CI Migration Diagnostics
Changes to .gitea/workflows/ci.yml:
✓ Add database connection pre-check (SELECT version())
✓ Improved migration error reporting with exit code handling
✓ Detailed table verification after each migration
✓ Better debugging output for failure scenarios
✓ Clearer success message with audit table count
Specific Improvements:
Before:
for f in $(ls ...); do
psql -U ... -f "$f" # No error checking
done
After:
psql ... -c "SELECT version();" || exit 1 # Pre-check
for f in $(ls ...); do
psql ... -v ON_ERROR_STOP=1 -f "$f" || {
echo "ERROR: Failed $f"
psql ... -c "SELECT tablename FROM pg_tables..." # Debug
exit 1
}
done
⏳ Current CI Execution
Latest Commit: 855a800
Branch: main
Trigger: Automatic (push event)
Expected Duration: 15-20 minutes
Job Status Tracking
[ ] core (critical validators)
[ ] .NET unit tests
[ ] Database migration execution (IMPROVED)
[ ] WBS verdict generation
[ ] Parallel Jobs (7)
[ ] wbs-audit
[ ] dotnet-contracts
[ ] ui-storage
[ ] database-schema
[ ] calibration-pipeline
[ ] security-validation
[ ] workflow-lint
[ ] notify-results (final)
🎯 Success Criteria for Retry
Core Job Must Pass
✓ Database connection established ✓ V003 migration: 3 audit tables created ✓ V004 migration: Schema preparation ✓ All unit tests: 214/214 passing ✓ No errors in migration logs
All 9 Jobs Must Complete
✓ All parallel jobs complete ✓ No timeouts (30-min max per job) ✓ Final conclusion: SUCCESS
Performance Baseline Confirmed
✓ Total duration: 15-20 minutes ✓ Consistent with expectation ✓ Ready for Phase 0 Week 1 reproducibility test
📍 Monitoring URL
Live CI Dashboard: https://gitea.taxbaik.com/kjh2064/QuantEngineByItz/actions
Watch For:
- New run appears with latest commit (
855a800) - core job completes (should show migration logs)
- All parallel jobs reach success state
- Final notification posted
⏱️ Timeline
- 2026-07-24 T+0min: Commit
855a800pushed - 2026-07-24 T+0-1min: CI auto-triggers
- 2026-07-24 T+15-20min: Expected completion
- Expected Result: All jobs = SUCCESS (Retry 2)
🚀 Next Steps (After CI Completes)
If CI Passes ✅
- Verify V003 migrations created audit tables
- Confirm no errors in migration logs
- Document Phase 0 Week 1 baseline:
- CI duration: ~15-20 minutes
- 214/214 unit tests pass
- 9/9 jobs complete
- Proceed to Week 2 (audit trail data collection)
If CI Fails ❌
- Check core job logs for specific error
- Identify root cause (DB connection, SQL syntax, etc.)
- Apply targeted fix
- Re-trigger CI (Retry 3)
Status: MONITORING IN PROGRESS Retry Attempt: 2 of N Phase: Phase 0 Week 1 - CI Performance Baseline Goal: Establish 15-20 minute baseline, validate 9-job parallel pipeline