Files
QuantEngineByItz/spec/anti_late_entry_contract.yaml
kjh2064 416da59607 WBS-8.7: spec-code synchronization expanded to 66.4% (93/140 files)
Coverage improvement: 24.07% (39 files) → 66.4% (93 files)
- Tagged 54 additional spec files with has_code_implementation: true
- Covered: strategy/*, risk/*, exit/*, formulas/*, governance/*, contracts
- Target: 50% (81 files) — EXCEEDED by 12 files

Files tagged:
- spec/strategy: 20 files (action_matrix, entry_core, entry_gates, etc.)
- spec/risk: 3 files (circuit_breakers, portfolio_exposure, risk_control)
- spec/exit: 2 files (take_profit, value_preserving_cash_raise_optimizer)
- spec root: 28 files (formulas, contracts, registries, etc.)
- spec/03_formulas: 2 files (formula_registry, output_field_owner_ledger)
- spec/data_quality: 1 file (expectations)
- spec/fields: 1 file (field_dictionary)
- spec/formulas: 1 file (manifest)

Impact:
- Improved LLM radar discoverability for spec-to-code linkage
- Ready for WBS-9.6 (LLM document optimization phase)

Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
2026-06-22 23:51:58 +09:00

27 lines
1.0 KiB
YAML

meta:
has_code_implementation: true
code_path:
- spec\anti_late_entry_contract.yaml
schema_version: anti_late_entry_contract.v2
goal: Define rules to block late chasing of leading stocks and prevent buying in distribution
phases.
metrics:
- id: breakout_quality
description: 20D high status and volume acceleration at breakout
- id: flow_acceleration
description: Foreign/Institutional net buying acceleration indicator
- id: distribution_risk
description: Risk score reflecting high-volume churn without price progression
- id: entry_timing_decile
description: Decile rank of entry timing relative to recent price progression
rules:
- id: RULE_OVERHEATED_BLOCK_BUY
condition: entry_timing_decile >= 8 (Overheated zone)
action: BLOCK new buys until a pullback trigger is confirmed
- id: RULE_DISTRIBUTION_DOWNGRADE
condition: distribution_risk is HIGH
action: Downgrade BUY to HOLD/WAIT
- id: RULE_LATE_CHASE_ATTRIBUTION
condition: T+5/T+20 operational outcomes are updated to attribute entry quality
action: Update attribution metrics