# CI Validation Report (2026-07-24) ## 🎯 Current Status **Commit**: `82ec957a63d22e51cc8a2880e7cfe991c6a9e92d` **Branch**: `main` **Push Time**: 2026-07-24 (automated) **CI Trigger**: Automatic (via push event) ## ✅ Pre-CI Local Validation ### Build Status ``` ✓ .NET Release Build: 0 errors, 0 warnings ✓ Unit Tests: 214/214 passed (14-16s) ✓ Build Duration: ~4 seconds ``` ### Code Quality ``` ✓ No compilation warnings ✓ SOLID principles applied ✓ All interfaces properly defined ✓ Type-safe implementations ``` ### Database Migrations ``` ✓ V003_add_audit_trail_tables.sql (319 lines) - 3 audit tables (kis_*_audit) - PL/pgSQL trigger functions - Migration validation views - Rollback script included ✓ V004_normalize_snapshots_schema.sql (288 lines) - 4 normalized tables (3NF) - 9 optimized indexes - Migration validation views - Adapter pattern compatibility ``` ## 📊 CI Pipeline Structure ### 9 Parallel Jobs 1. **core** (critical) → blocks 3 parallel jobs - .NET unit tests - KIS API trading gate - Database migrations 2. **Parallel Jobs** (7 independent) - wbs-audit - dotnet-contracts - ui-storage - database-schema - calibration-pipeline - security-validation - workflow-lint 3. **Final** (notify-results) - PR status summary ### Timeline - **Expected Duration**: 15-20 minutes - **Speedup**: 3x vs sequential (~40min → ~15min) - **Critical Path**: core → calibration → reporting ## 🔍 Success Criteria ✓ All 9 jobs complete with `success` status ✓ No timeout errors (max 30min) ✓ Database migrations applied ✓ All contracts validated ✓ Operational report generated ## 📍 Monitoring ### Web UI (Real-time) ``` https://gitea.taxbaik.com/kjh2064/QuantEngineByItz/actions ``` ### What to Watch - Job execution order (core first, then parallel) - V003 migration timing (should be <30s) - Database schema validation (contracts job) - Final operational report rendering ## 🚀 Post-CI Actions If all jobs pass: 1. **Verify V003 Migrations** ```sql SELECT COUNT(*) FROM information_schema.tables WHERE table_schema='quantengine' AND table_name LIKE 'kis_%_audit'; -- Expected: 3 tables ``` 2. **Check Audit Trail** ```sql SELECT * FROM v_kis_collection_runs_recent_changes; ``` 3. **Proceed to Phase 1 Prep** (Sep 1) - 3NF schema design review - SOLID refactoring plan - Adapter pattern testing ## 📈 Success Metrics | Metric | Target | Method | |--------|--------|--------| | Build Pass | 100% | CI log | | Test Pass | 214/214 | dotnet-contracts | | Parallel Jobs | 9/9 success | Actions UI | | Duration | 15-20 min | CI duration | | DB Objects | 3+3 created | schema query | --- **Status**: CI Running **Trigger**: Automatic push to main **Phase**: Phase 0 Week 1 - CI Baseline Measurement **Target**: 15-20 minute execution