# CI Monitoring & Retry Status (2026-07-24) ## 📊 Previous Execution Results ### Run #2587 (Failed) - **Status**: COMPLETED - **Conclusion**: FAILED - **Failure Reason**: Migration execution issue ### Run #2585 (Failed) - **Status**: COMPLETED - **Conclusion**: FAILED - **Failure Reason**: Migration execution issue --- ## 🔧 Improvements Applied ### Commit 855a800: Enhanced CI Migration Diagnostics ``` Changes to .gitea/workflows/ci.yml: ✓ Add database connection pre-check (SELECT version()) ✓ Improved migration error reporting with exit code handling ✓ Detailed table verification after each migration ✓ Better debugging output for failure scenarios ✓ Clearer success message with audit table count ``` **Specific Improvements**: ```yaml Before: for f in $(ls ...); do psql -U ... -f "$f" # No error checking done After: psql ... -c "SELECT version();" || exit 1 # Pre-check for f in $(ls ...); do psql ... -v ON_ERROR_STOP=1 -f "$f" || { echo "ERROR: Failed $f" psql ... -c "SELECT tablename FROM pg_tables..." # Debug exit 1 } done ``` --- ## ⏳ Current CI Execution **Latest Commit**: 855a800 **Branch**: main **Trigger**: Automatic (push event) **Expected Duration**: 15-20 minutes ### Job Status Tracking ``` [ ] core (critical validators) [ ] .NET unit tests [ ] Database migration execution (IMPROVED) [ ] WBS verdict generation [ ] Parallel Jobs (7) [ ] wbs-audit [ ] dotnet-contracts [ ] ui-storage [ ] database-schema [ ] calibration-pipeline [ ] security-validation [ ] workflow-lint [ ] notify-results (final) ``` --- ## 🎯 Success Criteria for Retry ### Core Job Must Pass ✓ Database connection established ✓ V003 migration: 3 audit tables created ✓ V004 migration: Schema preparation ✓ All unit tests: 214/214 passing ✓ No errors in migration logs ### All 9 Jobs Must Complete ✓ All parallel jobs complete ✓ No timeouts (30-min max per job) ✓ Final conclusion: SUCCESS ### Performance Baseline Confirmed ✓ Total duration: 15-20 minutes ✓ Consistent with expectation ✓ Ready for Phase 0 Week 1 reproducibility test --- ## 📍 Monitoring URL **Live CI Dashboard**: https://gitea.taxbaik.com/kjh2064/QuantEngineByItz/actions **Watch For**: 1. New run appears with latest commit (855a800) 2. core job completes (should show migration logs) 3. All parallel jobs reach success state 4. Final notification posted --- ## ⏱️ Timeline - **2026-07-24 T+0min**: Commit 855a800 pushed - **2026-07-24 T+0-1min**: CI auto-triggers - **2026-07-24 T+15-20min**: Expected completion - **Expected Result**: All jobs = SUCCESS (Retry 2) --- ## 🚀 Next Steps (After CI Completes) ### If CI Passes ✅ 1. Verify V003 migrations created audit tables 2. Confirm no errors in migration logs 3. Document Phase 0 Week 1 baseline: - CI duration: ~15-20 minutes - 214/214 unit tests pass - 9/9 jobs complete 4. Proceed to Week 2 (audit trail data collection) ### If CI Fails ❌ 1. Check core job logs for specific error 2. Identify root cause (DB connection, SQL syntax, etc.) 3. Apply targeted fix 4. Re-trigger CI (Retry 3) --- **Status**: MONITORING IN PROGRESS **Retry Attempt**: 2 of N **Phase**: Phase 0 Week 1 - CI Performance Baseline **Goal**: Establish 15-20 minute baseline, validate 9-job parallel pipeline