Commit Graph

1 Commits

Author SHA1 Message Date
kjh2064 a06d1eeeca 📋 Phase 6 & 8: Testing & Deployment Configuration
Phase 6: Testing & Optimization
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━

 Unit Testing (bUnit)
- Example tests for Dashboard, Portfolio
- Form field validation tests
- Dialog interaction tests
- Target: 80%+ coverage

 Integration Testing
- Database repository tests
- API endpoint tests
- End-to-end workflows
- Real PostgreSQL connections

 Performance Optimization
- Bundle size targets (< 5MB)
- Loading time metrics
- Lazy loading configuration
- Asset pre-loading

 Accessibility (WCAG 2.1 AA)
- Keyboard navigation tests
- Screen reader compatibility
- Color contrast validation
- Form labeling requirements

Phase 8: Deployment & Operations
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━

 Production Build
- Release configuration setup
- Build output structure
- Deployment package creation
- Size verification

 Docker Deployment
- Multi-stage Dockerfile
- Image build process
- Container runtime config
- Health checks

 Nginx Reverse Proxy
- SSL/TLS configuration
- Load balancing setup
- WebSocket support
- Static asset caching

 Environment Configuration
- appsettings.production.json template
- Secrets management
- Database connections
- Kestrel endpoints

 Deployment Checklist
- Pre-deployment validation
- Step-by-step deployment procedure
- Post-deployment verification
- Monitoring setup

 Monitoring & Observability
- Health check endpoints
- Serilog logging configuration
- Metrics collection
- Alert thresholds

 Rollback Plan
- Version rollback procedure
- Database restore process
- Health verification
- Incident response

Deployment Pipeline:
1. Build: dotnet publish -c Release
2. Package: Docker image creation
3. Test: Health checks & verification
4. Deploy: Kubernetes/Docker orchestration
5. Monitor: Real-time observability
6. Rollback: Automated if needed

Success Criteria:
✓ 80%+ test coverage
✓ WCAG AA compliance
✓ Bundle size < 5MB
✓ 99.5% uptime target
✓ < 200ms avg response time
✓ Automated backups
✓ Comprehensive monitoring

Timeline:
- Phase 6: 2026-07-06
- Phase 7:  2026-07-05
- Phase 8:  2026-07-05
- Production Release: 2026-07-10

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-07-05 16:51:44 +09:00