docs(architecture): add OMS·WMS·ERP commercialization WBS as Phase 12 foundation
Validators (Pushes and Pull Requests) / UI & Storage Validation (push) Failing after 11s
Validators (Pushes and Pull Requests) / Core Validators & Database Setup (push) Failing after 26s
Validators (Pushes and Pull Requests) / Database & Schema Validation (push) Successful in 13s
Validators (Pushes and Pull Requests) / WBS & Audit Validations (push) Has been skipped
Validators (Pushes and Pull Requests) / .NET Contracts (push) Has been skipped
Validators (Pushes and Pull Requests) / Calibration & Performance (push) Has been skipped
Validators (Pushes and Pull Requests) / Operational Report & Decision Packet (push) Has been skipped
Validators (Pushes and Pull Requests) / Security & Secrets (push) Successful in 11s
Validators (Pushes and Pull Requests) / CI Workflow Lint (push) Failing after 11s
Validators (Pushes and Pull Requests) / Notify PR Results (push) Has been skipped
Frontend CI Pipeline / ci-frontend-8-steps (push) Failing after 2m1s

- Complete 1,600-line WBS (spec/60_oms_wms_erp_wbs.yaml) with 12 phases
- 18-week timeline, 13-person team, $371K budget
- Strategic principles: SOLID, data consistency, parsimony, zero hallucination
- Quantified success metrics (70%+ test coverage, Lighthouse 90+, 99.9% uptime)
- Phase breakdown: Requirements → Development → Testing → Deployment → Stabilization
- Phase 0 (Week 1-2): Baseline establishment, FRD, OpenAPI spec, wireframes
- Phase 1-11: Progressive build-out of 4-layer components + 11 CRUD templates
- Gated by QuantEngine Phase 2 completion (KIS API production validation)
- 30-year senior architect perspective: architecture, PM, PL, dev, UX, QA, ops

Alignment with QuantEngine roadmap: Phase 12 (OMS·WMS·ERP) follows Phase 5 (Admin UI).

Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
This commit is contained in:
2026-07-26 20:34:47 +09:00
parent 2816e31075
commit 7cef465ba3
2 changed files with 1882 additions and 0 deletions
+163
View File
@@ -1159,3 +1159,166 @@ When modifying workflows (.gitea/workflows/*.yml):
**Dependencies**:
- Release creation (prepare-release.yml) is gated by ci.yml success (workflow_run trigger)
- Deployment (deploy-prod.yml) is manual — only after release artifact exists
---
## OMS·WMS·ERP Commercialization Project WBS (2026-07-26)
**OFFICIAL PROJECT FOUNDATION** — 30-Year Senior Architect/PM/PL/Dev/UX/QA/User Perspective
### Strategic Vision
**Objective**: Enterprise-grade Order Management (OMS) + Warehouse Management (WMS) + Enterprise Resource Planning (ERP) platform commercialization with:
- 4-layer input components (Primitive/Composite/Smart/Domain Templates)
- 11 standard CRUD templates (fully normalized data model)
- Vue 3 + TypeScript modern stack
- SOLID principles, data consistency, process simplification
- 100% test-driven, zero hallucination, full traceability
**Duration**: 18 weeks (4.5 months, 12 phases)
**Team**: 13 FTE (PM, PL, 4 FE devs, 1 UX, 2 QA, 1 DevOps, 0.5 security, 0.5 docs)
**Budget**: $371K USD (infrastructure, tooling, salaries)
**Target Launch**: Q4 2026
### Core Principles (Engineering Foundation)
| Principle | Application | Success Metric |
|-----------|-------------|-----------------|
| **SOLID** | Single Responsibility, Open/Closed, Liskov, Interface Segregation, Dependency Inversion | TypeScript strict mode, component test coverage 70%+ |
| **Data Consistency** | PostgreSQL SSOT, audit trails, 3NF normalization | Zero data anomalies, complete audit log |
| **Parsimony** | No gold-plating, hypothesis-driven, necessity-based features | Feature scope fixed per phase, 0 scope creep |
| **Normalization** | 3NF minimum, denormalization only after performance proof | Schema review, query analysis |
| **Process Simplification** | Automate after validation, reduce cognitive load | Automated CI/CD, runbooks for ops |
| **Patterns & Standardization** | Consistent naming, API contracts, component interfaces | Code review checklist, lint/format automation |
| **Structuring** | Layered architecture, modularity, microfront-end expansion path reserved | 4-layer components, clear responsibilities |
| **Vibes Coding** | Clear naming, minimal cognitive overhead, consistency | Pair programming, weekly code reviews |
| **Hallucination Prevention** | Test-driven, contract validation, schema enforcement | All features backed by tests, no assumptions |
| **Ground Truth & Traceability** | 100% reproducible (deterministic inputs), full history | Git commit history, audit logs, runbook documentation |
| **Reliability** | Graceful degradation, fault isolation, auto-recovery | Blue-green deployment, automatic rollback, 99.9% uptime |
| **Componentization** | Smart/Dumb separation, reusability | npm package @quantengine/ui, Storybook coverage |
| **Technical Debt** | Zero new debt, reduce existing by 50% per half-year | Quarterly debt audit, refactoring sprints |
### Phase Breakdown (12 Phases)
| Phase | Goal | Effort | Key Deliverables | Exit Criteria |
|-------|------|--------|------------------|---------------|
| **0** | Requirements & Baseline | 2wks | FRD, OpenAPI spec, wireframes, risk register | Stakeholder sign-off |
| **1** | Dev Environment & CI/CD | 2wks | Vite project, Storybook, GitHub Actions, DB migrations | All devs local setup ✓ |
| **2** | Primitive & Composite Layers | 2wks | 30 components, Storybook docs, 70%+ test coverage | WCAG 2.1 AA audit ✓ |
| **3** | Smart Components & State | 2wks | 12 domain components, Pinia stores, API client | Integration tests ✓ |
| **4** | CRUD Templates & E2E | 2wks | 11 full CRUD screens, 50 E2E tests, responsive design | All screens tested ✓ |
| **5** | Design System & npm | 1wk | npm package @quantengine/ui, Storybook deployment | npm install works ✓ |
| **6** | Authorization & Security | 1wk | RBAC (5 roles, 50 perms), audit trails, OWASP validation | Zero critical vulns ✓ |
| **7** | Performance Optimization | 1wk | Lighthouse 90+, bundle <500KB, P95 <250ms | Performance budgets met ✓ |
| **8** | UAT & Load Testing | 1wk | 20 users × 2wks UAT, load test 100 concurrent users | UAT sign-off, no P1 bugs ✓ |
| **9** | Production Deployment | 1wk | Blue-green deployment, monitoring (Sentry), health checks | 99.9% uptime, rollback <5min ✓ |
| **10** | Stabilization & Hotfixes | 2wks | Bug triage, performance tuning, user feedback | Error rate <0.5%, NPS >70 ✓ |
| **11** | Documentation & Handover | 1wk | Wiki, training materials, ops runbooks, knowledge transfer | All docs reviewed ✓ |
### Quantified Success Metrics
**Quality Indicators**:
- ✅ Test Coverage: 70%+ (Vitest)
- ✅ TypeScript Strict: 100% (no `any`, no implicit `unknown`)
- ✅ Accessibility: WCAG 2.1 AA minimum
- ✅ Bundle Size: <500KB (gzip, main chunk)
- ✅ Lighthouse Score: 90+ (desktop & mobile)
- ✅ Uptime: 99.9% (SLA)
- ✅ Response Time: P95 <250ms
- ✅ Error Rate: <0.5%
**Process Indicators**:
- ✅ Story Point Completion: 90%+ per sprint
- ✅ Code Review Approval: 100%
- ✅ Automated Tests: 50 E2E scenarios
- ✅ Deployment Time: <30min (zero-downtime)
- ✅ Documentation: 100% coverage
**Business Outcomes**:
- ✅ Developer Productivity: +30% (vs baseline)
- ✅ Ops Cost: -40% (automation & monitoring)
- ✅ Defects: -80% (test automation)
- ✅ User Satisfaction (NPS): 70+
- ✅ ROI: 1:3 payback (within 4 months)
### Risk Matrix (Top 3)
| Risk | Probability | Impact | Mitigation |
|------|------------|--------|-----------|
| Requirement Creep | HIGH (80%) | HIGH | Fix scope per phase, Phase 12+ backlog |
| Production Outage | LOW (5%) | CRITICAL | Blue-green, auto-rollback, RTO <5min |
| Data Loss | VERY LOW (1%) | CRITICAL | Automated backup/restore testing |
### Team & Budget
**Composition**:
- PM (Product Manager): 1 FTE
- PL (Technical Lead/Architect): 1 FTE
- Frontend Developers: 4 FTE (1 lead + 3 junior)
- Backend Developers: 2 FTE (.NET dedicated)
- UX/UI Designer: 1 FTE
- QA Engineers: 2 FTE (1 automation + 1 manual)
- DevOps/SRE: 1 FTE
- Security Specialist: 0.5 FTE (consultant)
- Technical Writer: 0.5 FTE
**Estimated Costs** (8 months):
- Payroll: $360K (avg $2.7K/person/month × 13 × 8)
- Infrastructure: $4K (AWS, PostgreSQL, CDN)
- Tools & Licenses: $4K (Sentry, DataDog, BrowserStack, Chromatic)
- **Total Budget**: $371K
**Expected ROI**:
- 30% productivity improvement (component reuse, automation)
- 40% ops cost reduction (monitoring, incident auto-response)
- 80% defect reduction (test coverage)
- **Payback Period**: 4 months
### Immediate Actions (Week 1-2, Phase 0)
**Tasks**:
1. T0.1: Stakeholder requirements (3 days) → FRD
2. T0.2: Architecture decision (4 days) → Monolithic SPA confirmed
3. T0.3: 4-Layer component design (5 days) → Figma library
4. T0.4: 11 CRUD template inventory (4 days) → Template matrix
5. T0.5: API OpenAPI 3.0 (5 days) → 30 endpoints spec
6. T0.6: UI/UX wireframes (5 days) → High-fidelity mockups
7. T0.7: Risk register (2 days) → 15+ risks with mitigations
### Detailed WBS Document
**Complete work breakdown with all tasks, effort estimates, deliverables, and acceptance criteria:**
📄 **[spec/60_oms_wms_erp_wbs.yaml](spec/60_oms_wms_erp_wbs.yaml)** (1,600 lines)
**Contents**:
- 12 phases with detailed task breakdowns
- Effort estimates (person-days per task)
- Deliverables checklist
- QA checkpoints and acceptance criteria
- Risk mitigation strategies
- Weekly retrospectives process
- Post-project knowledge transfer plan
### Phase 0 Exit Checklist (GO/NO-GO Decision)
- [ ] FRD (Functional Requirements Document) signed by all stakeholders
- [ ] OpenAPI 3.0 specification: 30 endpoints documented
- [ ] Figma wireframes: 80%+ completion
- [ ] 4-layer component architecture: Layer 1-4 defined
- [ ] 11 CRUD templates: Business rules documented
- [ ] Risk register: 15+ identified with mitigation plans
- [ ] Architecture decision documented (ADR-001)
- [ ] **Decision**: GO/NO-GO for Phase 1
### Alignment with QuantEngine Phases
This OMS·WMS·ERP WBS represents **Phase 12 of QuantEngine commercialization**:
- ✅ Phase 1 (Web UI Migration): Complete ✓ 2026-07-11
- ✅ Phase 2 (KIS Data Collection): 95% complete ✓ 2026-07-24
- ✅ Phase 4 (CI/CD Pipeline): 80% complete ✓ 2026-07-24
- ✅ Phase 5 (Admin UI & Deployment): Complete ✓ 2026-07-11
- 🆕 **Phase 12 (OMS·WMS·ERP Commercialization): START 2026-08-01**
**Constraint**: OMS·WMS·ERP development is **gated by QuantEngine Phase 2 completion** (KIS API integration). Phase 12 can begin only after Phase 2 validation in production.
File diff suppressed because it is too large Load Diff