614f1416d4
ci / static (push) Failing after 8s
ci / backend (push) Failing after 1s
ci / publish (push) Has been cancelled
ci / frontend (push) Has been cancelled
Build & Test with Secrets / build (push) Failing after 1s
Build & Test with Secrets / security-scan (push) Failing after 7s
deploy / deploy (push) Successful in 2m48s
Build & Test with Secrets / frontend (push) Successful in 4m7s
deploy / notify (push) Successful in 1s
Build & Test with Secrets / notification (push) Failing after 1s
3.1 KiB
3.1 KiB
AEG-X-004 DbUp recovery rehearsal evidence
Traceability
- WBS:
AEG-X-004 - Requirement:
REQ-DB-001 - Gate:
G0 - Source:
docs/CURRENT/WBS_EXECUTION_PROCEDURES.md,db/migrations/*.sql, DbUp integration tests - Assumption: the configured integration database is the approved non-production test database
kartselldb_test. - Unknown: production rehearsal and DBA sign-off were not performed.
- Decision Required: none for this test-database rehearsal; production approval remains required.
Acceptance evidence
Commands were run sequentially to avoid concurrent build/output contention:
dotnet test tests/KArtSell.Integration.Tests/KArtSell.Integration.Tests.csproj --no-build -c Release --filter FullyQualifiedName~DbUpMigrationTests --logger trx --verbosity minimal
PASS: 11/11, duration 1m 2s
TRX: tests/KArtSell.Integration.Tests/TestResults/kjh20_KIMJAEHYUN-OFFI_2026-08-06_14_06_38_net10.0.trx
dotnet test tests/KArtSell.Integration.Tests/KArtSell.Integration.Tests.csproj --no-build -c Release --filter FullyQualifiedName~DbUpRecoveryTests --logger trx --verbosity minimal
PASS: 6/6, duration 28ms
TRX: tests/KArtSell.Integration.Tests/TestResults/kjh20_KIMJAEHYUN-OFFI_2026-08-06_14_07_41_net10.0.trx
The evidence covers the repository's fresh/upgrade/re-run/recovery and checksum protection test cases. No production database, automatic order, KIS submission, or migration mutation outside the approved test fixture was used.
Completion boundary
AEG-X-004 is marked COMPLETED for the executed test-database rehearsal. Production deployment, DBA approval, and any production migration execution remain out of scope.
Status-contract correction evidence (2026-08-06)
- Slice note:
docs/CURRENT/AEG-X-004_STATUS_CONTRACT_SLICE.md - Migration:
db/migrations/0032_shadow_run_queued_status_contract.sql - Regression:
DbUpMigrationTests.Migration0032_QueuedStatus_IsAccepted_AndRerunIsSafe - Command:
dotnet test tests/KArtSell.Integration.Tests/KArtSell.Integration.Tests.csproj -c Release --filter FullyQualifiedName~Migration0032_QueuedStatus --logger trx --verbosity minimal - Result:
1/1 passed, TRXtests/KArtSell.Integration.Tests/TestResults/kjh20_KIMJAEHYUN-OFFI_2026-08-06_14_15_10_net10.0.trx - Command:
dotnet test tests/KArtSell.Integration.Tests/KArtSell.Integration.Tests.csproj --no-build -c Release --filter FullyQualifiedName~DbUpMigrationTests --logger trx --verbosity minimal - Result:
12/12 passed, TRXtests/KArtSell.Integration.Tests/TestResults/kjh20_KIMJAEHYUN-OFFI_2026-08-06_14_15_28_net10.0.trx - Command:
dotnet test tests/KArtSell.Integration.Tests/KArtSell.Integration.Tests.csproj --no-build -c Release --filter FullyQualifiedName~DbUpRecoveryTests --logger trx --verbosity minimal - Result:
6/6 passed, TRXtests/KArtSell.Integration.Tests/TestResults/kjh20_KIMJAEHYUN-OFFI_2026-08-06_14_16_32_net10.0.trx
The correction accepts the existing application Queued state, rejects UnknownStatus, and preserves the inserted row across a direct re-run. This does not claim production migration, DBA approval, or Phase 1 execution/requeue.