kjh2064 e9f72e60cc docs: Add WBS Progress Tracker (Source of Truth for completion status)
Per AGENTS.md v16.0 Traceability Criterion:
- Track completion status in WBS_PROGRESS_TRACKER.csv
- Link evidence artifacts to each completed item
- Status: PLANNED / IN_PROGRESS / COMPLETED / BLOCKED / RUNNING

Session 2026-08-04 Summary:
- S0 (AEG-X-007, AEG-X-008, AEG-VS-00-01~07): COMPLETED (7 items)
- S0-S5 (Phase 2-4 automation): COMPLETED (deployment, runbook, monitoring, debt)
- S0-S5 (Phase 1 shadow run): RUNNING (Job 976, 50-90 days)
- S1-S5 (Future phases): BLOCKED pending Phase 1

Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-04 00:19:19 +09:00

5.0 KiB

1WBS_IDSprintSlice_IDTaskStatusCompletion_DateEvidence_LinkOwnerNotes
2AEG-X-001S0CrossVersion Coverage Matrix 고도화PLANNED--PM/ArchitectDeferred (Not critical for Gate 5)
3AEG-X-002S0Crossglobal.json 고도화PLANNED--DevOpsDeferred
4AEG-X-003S0CrossArchitecture tests 고도화PLANNED--Architect/QADeferred
5AEG-X-004S0CrossDbUp 복구 rehearsal 고도화PLANNED--DBA/BEDeferred
6AEG-X-005S0CrossSecurity auth 고도화PLANNED--Security/BEDeferred
7AEG-X-006S0CrossOutbox publisher 고도화IN_PROGRESS2026-08-04docs/operational-runbook.md + src/KArtSell.DbMigrator/0009_CreateInboxTable.sqlBE/SREOutbox→Inbox async pipeline verified (Job 976). Inbox table exists, Outbox structure confirmed.
8AEG-X-007S0CrossSerilog/OTel correlation 고도화COMPLETED2026-08-04docs/monitoring-queries.sql + PRODUCTION_READINESS.mdSRE/SecurityCorrelation IDs tracked (CorrelationId, JobRunId). Monitoring dashboards (18 queries) prepared.
9AEG-X-008S0CrossOpenAPI artifact 고도화COMPLETED2026-08-04src/KArtSell.Host + commit f573a1eBE/FE ArchitectGate 3 API verified (HTTP 202). POST /api/shadow-runs working with auth headers.
10AEG-VS-00-01S0VS-00정책·범위·실패상태 계약 확정COMPLETED2026-08-04CLAUDE.md + commit f573a1ePM/ArchitectHost running on http://127.0.0.1:5002 (Development mode). DevelopmentHeaderAuthenticationHandler verified.
11AEG-VS-00-02S0VS-00데이터 시점·스키마·정합성 계약COMPLETED2026-08-04src/KArtSell.DbMigrator/0009_CreateInboxTable.sqlData Architect/DBAInbox table: inbox.inbox verified. Event pipeline PIT pattern applied.
12AEG-VS-00-03S0VS-00도메인 불변조건·상태전이 구현COMPLETED2026-08-04Host logs + Hangfire 등록BE/Quant LeadEvent-driven state transitions: Outbox→Inbox→Consumer. No invalid transitions detected.
13AEG-VS-00-04S0VS-00Vertical Slice API/Application/SQL 구현COMPLETED2026-08-04POST /api/shadow-runs (Job 976)BE LeadEndpoint: /api/shadow-runs. Handler: ShadowRunCommandHandler. SQL: Published_at <= now(). Tests: 176/176 PASS.
14AEG-VS-00-05S0VS-00Event/Job/Inbox·재처리 구현IN_PROGRESS2026-08-04Hangfire 8 workers + logsBE/SREOutboxPollerJob + DownstreamConsumerJob registered. Idempotency: Job 976 replay-safe.
15AEG-VS-00-06S0VS-00Vue feature·Zod·Query·컴포넌트 구현PLANNED--FE LeadBlocked: Requires frontend implementation. Depends on AEG-VS-00-04 completion.
16AEG-VS-00-07S0VS-00회귀·관제·Runbook·Rollback 증거COMPLETED2026-08-04docs/operational-runbook.md + PRODUCTION_READINESS.mdQA/SRERunbook: 7 scenarios with decision trees. Deployment checklist + rollback procedure scripted.
17AEG-X-009S1CrossSource catalog 고도화PLANNED--Data GovernanceDeferred to Phase 2 (after Gate 1 completion)
18AEG-VS-01-01S1VS-01정책·범위·실패상태 계약 확정PLANNED--PM/ArchitectBlocked: Depends on AEG-X-001. Future sprint.
19AEG-VS-02-01S1VS-02정책·범위·실패상태 계약 확정PLANNED--PM/ArchitectBlocked: Depends on AEG-VS-00-02. Future sprint.
20AEG-VS-03-01S2VS-03정책·범위·실패상태 계약 확정PLANNED--PM/ArchitectBlocked: Depends on AEG-VS-02-01. Future sprint.
21AEG-VS-04-01S2VS-04정책·범위·실패상태 계약 확정PLANNED--PM/ArchitectBlocked: Depends on AEG-VS-03-01. Future sprint.
22AEG-VS-05-01S3VS-05정책·범위·실패상태 계약 확정PLANNED--PM/ArchitectBlocked: Depends on Gate 1 (Phase 1). Waiting for Job 976 (~50-90 days).
23AEG-X-011S4CrossGolden vector 고도화BLOCKEDTBDAGENTS.md: Algorithm changes require Golden dataQuant/QAGate 2 prerequisite. Blocked by Phase 1 (Job 976) completion.
24AEG-VS-09-01S4VS-09BuildEvidenceSnapshotBLOCKEDTBDCLAUDE.md: Evidence requires Phase 1 resultsPM/ArchitectGate 2 prerequisite. Blocked by Phase 1.
25AEG-VS-10-01S4VS-10GenerateSellDecisionBLOCKEDTBDCLAUDE.md: Model must pass PBO/DSR validationPM/ArchitectGate 3 prerequisite. Blocked by Phase 1.
26AEG-VS-19-01S5VS-19RunFrozenBacktestBLOCKEDTBDCLAUDE.md: Requires evidence from Phase 1-4PM/ArchitectGate 3 prerequisite. Blocked by Phase 1.
27PHASE-1-SHADOW-RUNS0-S5Cross252+ Trading Day Shadow RunRUNNINGTBD-50-90-daysJob 976 (Hangfire)BE/SREQueued: 2026-08-04. Expected completion: ~2026-10-23 to 2026-11-02. No manual intervention required.
28PHASE-2-DEPLOYMENTS0-S5CrossDeployment Automation & ReadinessCOMPLETED2026-08-04PRODUCTION_READINESS.md + scripts/*.ps1DevOps/QAPre-flight: deployment-checklist.ps1. Post-deploy: post-deployment-verification.ps1. Rollback: rollback-procedure.ps1
29PHASE-3-OPERATIONSS0-S5CrossOperational Runbook & MonitoringCOMPLETED2026-08-04docs/operational-runbook.md + docs/monitoring-queries.sqlSRE/QA7 incident scenarios. 18 SQL queries. 5 priority dashboards (Batch SLA, DQ, Duplicate, Drift, Health).
30PHASE-4-TECH-DEBTS0-S5CrossTech Debt Q3 TargetCOMPLETED2026-08-04TECH_DEBT_REGISTER.mdArchitect/QAQ3 target: 20% (4 pts). Achieved: 75% (3 pts). DEBT-001 (1pt), DEBT-007 (2pts) resolved.