Delivery Gate

G0 Toolchain/Repository

  • .NET 10 SDK, Node 22, pnpm 10 설치.
  • pnpm-lock.yaml 생성·검토·커밋.
  • dotnet restore/build/testpnpm install --frozen-lockfile/typecheck/test/build 통과.
  • PostgreSQL 17 fresh/upgrade/re-run migration.

G1 Data Minimum

  • SecurityMaster, MarketCalendar, Raw immutable, PIT timestamp, revision, DQ.
  • 기업행사·총수익·상폐·FX·Fee/Tax contract.
  • Replay same manifest/hash.

G2 Algorithm Contract

  • 6개 Sell Policy와 Reentry state machine Golden.
  • Lot/Cycle reset.
  • Evidence Version Set 100%.
  • 비용 2배, boundary ±epsilon, lookahead tests.

G3 Advisory MVP

  • Recommendation→Review→Publish→ClientDecision→Outcome E2E.
  • maker-checker, approval expiry, unapproved publication 0.
  • 고객 화면에 근거·반대증거·불확실성·비용·재진입 표시.

G4 Shadow

  • 최소 252 거래일, 복수 국면.
  • 운영 무결성 오류 0.
  • 매도/재진입/예측 calibration/위험감소 KPI 누적.

G5 Pilot Readiness

  • AuthN/AuthZ, PII, audit, reconciliation, kill-switch, DR.
  • SLO/RPO/RTO와 Runbook.
  • 법무·준법·정보보호 승인.

G6 Advisory Go-Live

  • 자동주문 OFF.
  • backfill/reconciliation/cutover/rollback rehearsal.
  • Release Evidence와 residual risk 승인.

일임형 별도 검토 Gate

Shadow 기간·OOS·PBO/DSR·비용후 효용·운영/준법/고객보호를 모두 통과한 뒤 별도 프로젝트로 검토한다. 적중률 하나로 전환하지 않는다.