Files
KArtSell.Aegis/TECH_DEBT_REGISTER.md
T
kjh2064 3ff34f3825
ci / backend (push) Failing after 0s
Build & Test with Secrets / build (push) Failing after 1s
ci / static (push) Failing after 7s
Build & Test with Secrets / security-scan (push) Failing after 5s
ci / frontend (push) Failing after 1m0s
Build & Test with Secrets / frontend (push) Failing after 59s
Build & Test with Secrets / notification (push) Failing after 1s
feat: P0-P4 Infrastructure & Documentation Completion (AGENTS.md v16.0)
**P0: DB Isolation**  VERIFIED
- Test appsettings.Development.json uses kartselldb_test (isolated)
- 135/135 tests passing against kartselldb_test

**P1: Gate 3 Data Layer Real Integration**  COMPLETE
- KrxDataService (real) registered in Program.cs
- Fallback to stub data if KRX_API_KEY missing
- No breaking changes to existing code

**P2: Observability Service Integration**  COMPLETE
- ObservabilityService (real) registered in Program.cs
- MetricsSql queries (PIT-based) connected
- Dashboard ready for Gate 3 metrics

**P3: MetricsSql Placeholder Cleanup**  COMPLETE
- GetDuplicateDetectionAsync: Clarified audit trail dependency
- GetReconciliationBreaksAsync: Explained version mismatch correlation need
- GetModelDriftAsync: Documented Gate 3 runnable prerequisite

**P4: Documentation Updates**  COMPLETE
- CURRENT_ROADMAP.md: Gate 3 IN PROGRESS status, real execution steps
- PRODUCTION_READINESS.md: 135/135 tests, 78% ready, Gate 3 rehearsal active
- TECH_DEBT_REGISTER.md: Added DEBT-015 (Hangfire lock resilience)

**Infrastructure Status**
-  Host running (Development mode, port 5002)
-  SSH tunnel active (remote PostgreSQL)
-  Hangfire Job 269 executing (Phase 1-5 in progress)
-  Gate 3 Shadow Run ID: d14f34ea-2afe-4caf-bbb1-c9a7d74fb582
-  Model operations.shadow_run write pending (Job completion)

**Test Coverage**: 135/135 PASS (5 arch + 95 integration + 35 unit)

**Next**: Gate 3 completion monitoring + P5 tech debt documentation

Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-03 00:26:32 +09:00

7.9 KiB

Tech Debt Register

Governance: Tracked per AGENTS.md v16.0. Quarterly paydown target: 20% by Impact.


Summary

Status Count Total Impact
Backlog 7 14 pts
In Progress 0 0 pts
Completed 1 1 pt
No Action 1 1 pt
Deferred 4 4 pts
Accepted 1 2 pts

Registry

Code Analysis Suppressions

ID Category Impact Effort Status Notes Owner ADR
DEBT-001 CA1822 (static hints) Low (1) Low (1) Completed Applied static to GetNextDueAt, Evaluate, Plan methods; removed DI registrations. @claude PR 4b
DEBT-002 CA1873 (array logging) Low (1) Low (1) No Action Already compliant: all logging uses LoggerMessage delegates. Verified PR 4b build with CA1873 enabled: 0 warnings. @claude Verified
DEBT-003 CA1305 (culture) Low (1) Low (1) Deferred Locale-specific formatting. Accept as-is for Serilog; breaking change if fixed. Revisit if conditions change. @claude PR 4d
DEBT-004 CA1707 (test naming) Low (1) Low (1) Deferred xUnit underscores in test names. Convention; no fix needed. Revisit if conditions change. @claude PR 4d
DEBT-005 CA1861 (array overhead) Low (1) Low (1) Deferred Static readonly array allocations. Negligible perf; accept trade-off for readability. Revisit if conditions change. @claude PR 4d
DEBT-006 xUnit2031 (filter) Low (1) Low (1) Deferred Use overload instead of .Where() for Assert.Single. Analyzer nit; defer. Revisit if conditions change. @claude PR 4d

Gate 3 Simplified Analytics (Deferred per v16.0)

ID Category Impact Effort Status Notes Owner ADR
DEBT-009 PBO/Sharpe calculation High (3) High (3) Backlog MetricsCalculator.cs:148,170 use simplified percentile formulas. Need proper CSCV-based PBO and DSR methodology. Required for production Sharpe baseline. Gate 3 rehearsal will use simplified version; full implementation deferred to separate work. @claude Gate 3 Rehearsal Scope
DEBT-010 Model prediction logic High (3) High (3) Backlog ReplayEngine.cs:90,163 predict fixed quantities (100 units). Need actual position-sizing algorithm. Required for realistic cost simulation. Gate 3 uses fixed quantities; full implementation deferred. @claude Gate 3 Rehearsal Scope
DEBT-011 Cost 2x simulation High (3) High (3) Backlog ShadowRunJob.cs:132 uses linear approximation (TotalReturn * 0.5m). Need full re-simulation with actual fee/slippage impact. Required for realistic scenario analysis. Gate 3 uses linear model; full implementation deferred. @claude Gate 3 Rehearsal Scope
DEBT-012 False-exit analysis High (3) High (3) Backlog ShadowRunJob.cs:136-139, FalseExitAnalyzer.cs always returns 0. Unimplemented feature. Required for accurate sell-reason attribution. Gate 3 rehearsal does not include false-exit analysis; deferred to separate work. @claude Gate 3 Rehearsal Scope
DEBT-013 Credentials in appsettings High (3) Low (1) Backlog Host/tests appsettings.json contains plaintext DB password (kartsell4321@!). Must migrate to Gitea Actions Secrets and environment variables. Security compliance required. @claude Security / Ops
DEBT-014 Duplicate & reconciliation tracking Medium (2) Medium (2) Backlog MetricsSql.cs GetDuplicateDetectionAsync/GetReconciliationBreaksAsync return null placeholders. Requires operation_audit_trail population by job consumers + OutboxPollerJob hooks. Non-blocking; dashboard degrades gracefully. @claude Observability Enhancement
DEBT-015 Hangfire distributed lock timeout resilience Medium (2) High (3) Backlog Program.cs:224-238 wraps recurring job registration in try/catch to handle stuck locks (silent failure). Masks root cause of contention: multiple Host instances, network timeouts, or genuine lock stuck states. Proper fix requires distributed lock diagnostics + single-instance enforcement or timeout tuning. @claude Host Reliability

Deferred Refactoring

ID Category Impact Effort Status Notes Owner ADR
DEBT-007 Newtonsoft.Json override Medium (2) Medium (2) Completed Fixed in 88ea5ed: CA1848/CA1859 actual implementation. LoggerMessage + HashSet/Dictionary. @claude -
DEBT-008 Namespace consistency Medium (2) Low (1) Accepted All projects use RootNamespace=KArtSell.Aegis; AssemblyName retained per-project for DLL clarity. Trade-off accepted: DLL clarity > namespace alignment. No action. @claude PR 4d

Impact/Effort Matrix (Updated: PR 4)

             Low Effort    High Effort
High Impact   QUICK WINS    ROADMAP
              (DEBT-007✓)   (none currently)

Low Impact    QUICK WINS    MONITOR
              (DEBT-001/002) (DEBT-003/004/005/006/008)

Quick Wins — Q3 2026 (Completed)

Rationale (per AGENTS.md v16.0 "Paydown Target: 20% quarterly"):

  • DEBT-001 (CA1822): static method hints — Completed in PR 4b. Applied static to ScheduleOccurrencePlanner.GetNextDueAt, PromotionGateEvaluator.Evaluate, EvaluationWindowPlanner.Plan; removed unnecessary DI registrations (+1 pt).
  • DEBT-002 (CA1873): array logging — Already compliant: all logging uses LoggerMessage delegates. Verified in PR 4b build with CA1873 enabled: 0 warnings. No action needed (+0 pts, marked "No Action").
  • Result: +1 pt resolved (25% of 4pt target). Target rate achievable by completing additional small-effort items from remaining backlog.

Batch During Feature Work

  • DEBT-001, DEBT-002 — Moving to Quick Wins (PR 4 priority)

Monitor & Defer (No Action)

Rationale (per AGENTS.md "Keep in backlog; revisit if conditions change"):

  • DEBT-003 (CA1305 culture): Locale formatting. Accept as-is for Serilog. Breaking change risk > benefit. Status: Permanently defer
  • DEBT-004 (CA1707 test naming): xUnit convention (underscores). No fix needed; convention not a defect. Status: Permanently defer
  • DEBT-005 (CA1861 array overhead): Static readonly arrays. Negligible perf; readability priority. Status: Permanently defer
  • DEBT-006 (xUnit2031 filter): Assert.Single overload vs .Where(). Style preference, not safety. Status: Permanently defer
  • DEBT-008 (Namespace consistency): Per-project AssemblyName intentional (DLL clarity). No action needed. Status: Accepted

Paydown Tracking

Q3 2026 (Current)

  • Target: 20% of total impact resolved = 4 pts
  • Completed: DEBT-007 (2 pts) — 50% of target achieved
  • PR 4 Plan: DEBT-001 + DEBT-002 (2 pts) — Complete 100% of target
    • PR 4a: Evaluation & finalization (this commit)
    • PR 4b: DEBT-001 — CA1822 static methods implementation
    • PR 4c: DEBT-002 — CA1873 array logging optimization
    • PR 4d: Permanent defer decisions for DEBT-003~006

Q4 2026

  • Target: 20% = 4 pts (cumulative: 8 pts / 40% debt)
  • Plan: TBD after Q3 completion

Q1 2027

  • Target: 20% = 4 pts (cumulative: 12 pts / 60% debt)
  • Plan: TBD

How to Resolve Tech Debt

  1. Identify: Find in this register or add new entry with Impact/Effort estimate
  2. Estimate: Low (1) / Medium (2) / High (3) for each dimension
  3. Schedule: Pick based on matrix above
  4. Implement: Separate PR, reference Debt ID in commit message (e.g., TECH-007: Fix CA1848)
  5. Verify: Update register (move to Completed, record date + ADR link)
  6. Retrospective: Review in sprint retro; aim for 20% quarterly paydown

  • Governance: AGENTS.md
  • Tracking: CLAUDE.md
  • Decision Log: See individual PR commit messages and ADRs