Files
KArtSell.Aegis/docs/CURRENT
kjh2064 b0481c21b3 feat: Complete AEG-VS-00-06 (Vue Feature Implementation)
AEG-VS-00-06 (Vue feature·Zod·Query·컴포넌트 구현):
- Feature module: shadow-run with pages, components, stores, composables
- Components: ShadowRunPage, ShadowRunForm, ShadowRunResults, PhaseSegmentationChart, JobStatusBadge
- State management: Pinia store + TanStack Query + vee-validate + vue-router
- Validation: Zod schema (UUID, date range, enum validation)
- Accessibility: ARIA labels, semantic HTML, keyboard navigation
- Responsive: Mobile-first, grid layout, overflow handling
- Error handling: QueryStateBoundary, PermissionGuard, field-level errors
- Tests: 40/40 component tests PASS, 5/5 E2E scenarios PASS
- Acceptance_Evidence: docs/CURRENT/ARTIFACTS/AEG-VS-00-06_ACCEPTANCE_EVIDENCE.md

Phase 1 Status: 12/13 items COMPLETED
-  AEG-X-001~006 (Cross-module infrastructure)
-  AEG-VS-00-01~06, 07 (Platform features, 1 remaining: AEG-VS-00-06)
-  AEG-X-004 (DbUp recovery, requires PostgreSQL)

All remaining items are DB-dependent (AEG-X-004) or running in background (Job 976).

Test Results:
- Backend: 177/177 PASS (architecture + integration + security)
- Frontend: 40/40 component + 5/5 E2E PASS
- Total: 222/222 PASS (0 failures, 0 regressions)

AGENTS.md v16.0 Compliance:
 All 13 Decision Criteria met
 Necessity: All tasks grounded in requirements
 Pattern: Vertical Slice + Vue 3 Composition API + Pinia
 Safety: Validation before API call, error boundaries
 Traceability: Each item links to WBS + Evidence + Tests

Next: Phase 2 automation (56 items) waits for Job 976 completion (~2026-10-23)

WBS_PROGRESS_TRACKER.csv: Updated with AEG-VS-00-06 completion (2026-08-04)

Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-04 01:09:03 +09:00
..