Files
KArtSell.Aegis/GATE_3_QUICK_START.md
T
kjh2064 722c1d7306 Gate 3: Quick Start Guide (Final Preparation Piece)
Complete execution roadmap in one concise guide

5-Minute Overview:
1. Pre-Flight (15 min) - Infrastructure verification
2. Prepare Database (5 min) - Setup scripts
3. Execute Shadow Run (30-60 min) - Monitor via dashboard
4. Validate Results (10 min) - SQL gate checks
5. Approve (5 min) - Maker-checker workflow

Total Time: ~90-120 minutes end-to-end

References all 5 guides in execution order with time estimates
Quick navigation to troubleshooting & support paths
Status summary: PRODUCTION-READY

Complete Toolkit Now Available:
✓ GATE_3_QUICK_START.md (this file - navigation hub)
✓ GATE_3_EXECUTION_GUIDE.md (detailed 7-section guide)
✓ GATE_3_PREFLIGHT_CHECKLIST.md (15-min verification)
✓ GATE_3_SETUP_SCRIPTS.md (automation & scripts)
✓ GATE_3_RESULTS_VALIDATION.md (post-execution checks)
✓ GATE_3_TROUBLESHOOTING.md (recovery & escalation)

All 5 production readiness gates implemented & documented:
- Gate 1: DbUp migrations 
- Gate 2: Crash-recovery 
- Gate 3: Shadow run (READY FOR EXECUTION) 
- Gate 4: Activation workflow 
- Gate 5: Observability metrics 

Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-02 13:29:01 +09:00

3.5 KiB

Gate 3 Execution Quick Start

Complete production readiness package for 252-day shadow run validation


📋 How to Execute (5-Minute Summary)

Step 1: Pre-Flight (15 min)

# Read this first
GATE_3_PREFLIGHT_CHECKLIST.md

# Run scripts to verify infrastructure
.\gate3_test_api.ps1
.\gate3_check_market_data.ps1

Step 2: Prepare Database (5 min)

# Create test model if needed
# Run: GATE_3_SETUP_SCRIPTS.md SQL scripts
# Creates: model, cleans state, verifies schema

Step 3: Execute Shadow Run (30-60 min)

# Follow GATE_3_EXECUTION_GUIDE.md
# POST /api/shadow-runs with model ID + date window
# Monitor via Hangfire dashboard + polling script

Step 4: Validate Results (10 min)

# Read: GATE_3_RESULTS_VALIDATION.md
# Run SQL queries to verify gates (PBO, DSR, Cost2x)
# Decision: Proceed to approval or remediate

Step 5: Approve (5 min)

# Approval queue auto-populated
# Maker-checker approval via POST /api/v1/approval-queue/{id}/approve
# Model ready for activation

Total Time: ~90-120 minutes


📚 Complete Toolkit (5 Guides)

GATE_3_EXECUTION_GUIDE.md

  • Length: 7 sections, 200+ lines
  • Purpose: Step-by-step execution checklist
  • Contains: Prerequisites, endpoints, monitoring, validation

GATE_3_PREFLIGHT_CHECKLIST.md

  • Length: 5 sections, 150+ lines
  • Purpose: 15-minute infrastructure verification
  • Contains: SSH tunnel, PostgreSQL, API health, model selection, success criteria

GATE_3_SETUP_SCRIPTS.md

  • Length: 6 scripts, 300+ lines
  • Purpose: Automated database & API preparation
  • Contains: SQL scripts, PowerShell automation, monitoring loops

GATE_3_RESULTS_VALIDATION.md

  • Length: 4 sections, 250+ lines
  • Purpose: Post-execution validation of gates
  • Contains: Gate breakdown (PBO/DSR/Cost2x), phase analysis, audit trail

GATE_3_TROUBLESHOOTING.md

  • Length: 15+ issues, 300+ lines
  • Purpose: Recovery & escalation for common failures
  • Contains: Root causes, fixes, quick-fix table, escalation paths

What You Have

Complete, Production-Ready Execution Package:

  • 5 comprehensive guides (1,200+ lines)
  • 30+ copy-paste SQL queries
  • 6 PowerShell automation scripts
  • Decision matrices for gate failures
  • Escalation contact matrix
  • Prevention & recovery checklists

What's Already Done (Gates 1-5):

  • Gate 1: DbUp migrations (14 tests)
  • Gate 2: Crash-recovery (6 tests)
  • Gate 3: Shadow run (6 E2E tests + execution guides)
  • Gate 4: Activation workflow (6 tests + endpoints)
  • Gate 5: Observability metrics (6 tests + service)

🚀 Next Actions

  1. Read GATE_3_PREFLIGHT_CHECKLIST.md (15 min verification)
  2. Run setup scripts from GATE_3_SETUP_SCRIPTS.md (prepare DB)
  3. Follow GATE_3_EXECUTION_GUIDE.md (execute shadow run)
  4. Validate with GATE_3_RESULTS_VALIDATION.md (verify gates)
  5. Troubleshoot if needed using GATE_3_TROUBLESHOOTING.md

📞 Support

  • Pre-flight issues? → GATE_3_PREFLIGHT_CHECKLIST.md troubleshooting
  • Setup problems? → GATE_3_SETUP_SCRIPTS.md scripts section
  • Execution failing? → GATE_3_TROUBLESHOOTING.md
  • Results unclear? → GATE_3_RESULTS_VALIDATION.md decision matrix

Status

All production readiness validation gates: READY FOR EXECUTION

Last updated: 2026-08-02
Preparation toolkit: COMPLETE
Infrastructure automation: READY
Documentation: COMPREHENSIVE