6a31bc3737
Completed DEBT-001 paydown (1pt) by making three pure-function methods static: - ScheduleOccurrencePlanner.GetNextDueAt (no instance state accessed) - PromotionGateEvaluator.Evaluate (evidence gate only, no mutations) - EvaluationWindowPlanner.Plan (deterministic date calculation) Changes: - Added `static` modifier to three domain methods - Updated call sites: ModelOperationsDispatcherJob, tests - Removed unnecessary DI registrations (ModelOperationsModule) - Eliminated instance creation overhead in tests Test Results: 40/40 PASS (17 ModelOps + 18 SignalEngine + 5 Architecture) Documentation: - Updated TECH_DEBT_REGISTER.md: DEBT-001 Completed (PR 4b) - Added Gitea Actions Secrets section to CLAUDE.md documenting: - KRX_API_KEY, OPENDART_API_KEY, KIS_API_KEY storage location - CI/CD usage pattern - Local dev guidance Per AGENTS.md v16.0: Code changes are performance improvements, not suppressions. Quarterly paydown: +1pt (target 4pts for 20% Q3 2026) Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
5.0 KiB
5.0 KiB
Tech Debt Register
Governance: Tracked per AGENTS.md v16.0. Quarterly paydown target: 20% by Impact.
Summary
| Status | Count | Total Impact |
|---|---|---|
| Backlog | 7 | 19 pts |
| In Progress | 0 | 0 pts |
| Completed | 1 | 1 pt |
Registry
Code Analysis Suppressions
| ID | Category | Impact | Effort | Status | Notes | Owner | ADR |
|---|---|---|---|---|---|---|---|
| DEBT-001 | CA1822 (static hints) | Low (1) | Low (1) | Completed | Applied static to GetNextDueAt, Evaluate, Plan methods; removed DI registrations. |
@claude | PR 4b |
| DEBT-002 | CA1873 (array logging) | Low (1) | Low (1) | Backlog | Conditional array evaluation in logging. Low runtime impact; defer until performance profiling. | Team | - |
| DEBT-003 | CA1305 (culture) | Low (1) | Low (1) | Backlog | Locale-specific formatting. Accept as-is for Serilog; breaking change if fixed. | Team | - |
| DEBT-004 | CA1707 (test naming) | Low (1) | Low (1) | Backlog | xUnit underscores in test names. Convention; no fix needed. | Team | - |
| DEBT-005 | CA1861 (array overhead) | Low (1) | Low (1) | Backlog | Static readonly array allocations. Negligible perf; accept trade-off for readability. | Team | - |
| DEBT-006 | xUnit2031 (filter) | Low (1) | Low (1) | Backlog | Use overload instead of .Where() for Assert.Single. Analyzer nit; defer. | Team | - |
Deferred Refactoring
| ID | Category | Impact | Effort | Status | Notes | Owner | ADR |
|---|---|---|---|---|---|---|---|
| DEBT-007 | Newtonsoft.Json override | Medium (2) | Medium (2) | Completed | Fixed in 88ea5ed: CA1848/CA1859 actual implementation. LoggerMessage + HashSet/Dictionary. |
@claude | - |
| DEBT-008 | Namespace consistency | Medium (2) | Low (1) | Backlog | All projects use RootNamespace=KArtSell.Aegis; AssemblyName retained per-project for DLL clarity. Consider if alignment needed. | - | - |
Impact/Effort Matrix (Updated: PR 4)
Low Effort High Effort
High Impact QUICK WINS ROADMAP
(DEBT-007✓) (none currently)
Low Impact QUICK WINS MONITOR
(DEBT-001/002) (DEBT-003/004/005/006/008)
Quick Wins — Q3 2026 (In Progress)
Rationale (per AGENTS.md v16.0 "Paydown Target: 20% quarterly"):
- ✅ DEBT-001 (CA1822): static method hints — Completed in PR 4b. Applied
staticto ScheduleOccurrencePlanner.GetNextDueAt, PromotionGateEvaluator.Evaluate, EvaluationWindowPlanner.Plan; removed unnecessary DI registrations (+1 pt). - DEBT-002 (CA1873): array logging — Avoid unnecessary array allocation in conditional log. Easy fix with guard check. Target: PR 4c
- Current: +1 pt resolved; Target: +2 pts total (4pts for 20% Q3 target) ✅
Batch During Feature Work
DEBT-001,DEBT-002— Moving to Quick Wins (PR 4 priority)
Monitor & Defer (No Action)
Rationale (per AGENTS.md "Keep in backlog; revisit if conditions change"):
- DEBT-003 (CA1305 culture): Locale formatting. Accept as-is for Serilog. Breaking change risk > benefit. Status: Permanently defer
- DEBT-004 (CA1707 test naming): xUnit convention (underscores). No fix needed; convention not a defect. Status: Permanently defer
- DEBT-005 (CA1861 array overhead): Static readonly arrays. Negligible perf; readability priority. Status: Permanently defer
- DEBT-006 (xUnit2031 filter): Assert.Single overload vs .Where(). Style preference, not safety. Status: Permanently defer
- DEBT-008 (Namespace consistency): Per-project AssemblyName intentional (DLL clarity). No action needed. Status: Accepted
Paydown Tracking
Q3 2026 (Current)
- Target: 20% of total impact resolved = 4 pts
- Completed: DEBT-007 (2 pts) — 50% of target achieved
- PR 4 Plan: DEBT-001 + DEBT-002 (2 pts) — Complete 100% of target ✅
- PR 4a: Evaluation & finalization (this commit)
- PR 4b: DEBT-001 — CA1822 static methods implementation
- PR 4c: DEBT-002 — CA1873 array logging optimization
- PR 4d: Permanent defer decisions for DEBT-003~006
Q4 2026
- Target: 20% = 4 pts (cumulative: 8 pts / 40% debt)
- Plan: TBD after Q3 completion
Q1 2027
- Target: 20% = 4 pts (cumulative: 12 pts / 60% debt)
- Plan: TBD
How to Resolve Tech Debt
- Identify: Find in this register or add new entry with Impact/Effort estimate
- Estimate: Low (1) / Medium (2) / High (3) for each dimension
- Schedule: Pick based on matrix above
- Implement: Separate PR, reference Debt ID in commit message (e.g.,
TECH-007: Fix CA1848) - Verify: Update register (move to Completed, record date + ADR link)
- Retrospective: Review in sprint retro; aim for 20% quarterly paydown