AEG-V15-036 — Dispatcher next-due CAS

Scope

  • WBS ID: AEG-V15-036; Requirement / API / DB / Job / UI / Test: REQ-V15-SCH-04 / V15-SCH-API / MIG-0020 / J31~J40 / Cross / T-V15-SCH-04.
  • Dependency / Gate: AEG-V15-035 (completed, commit d18f6a7) / G3.
  • Acceptance: a lost lease or stale dispatcher must make zero next-due advances.

Source / Assumption / Unknown / Decision Required

  • Source: MIG-0020 supplies dispatch_revision; acquisition increments it, but the returned due-operation contract and both advance queries currently omit it.
  • Assumption: the acquisition revision is an optimistic-concurrency token. A transition may mutate next_due_at only when both the lease owner and acquired revision match.
  • Unknown: a live PostgreSQL runner is unavailable in this session, so a concurrent integration rehearsal cannot be asserted.
  • Decision Required: DEC-083 transactionality between enqueue and mark is separate. This Slice prevents stale state advance but does not make Hangfire enqueue transactional.

Actual evidence and remaining acceptance

  • dotnet test tests/KArtSell.ModelOperations.UnitTests/KArtSell.ModelOperations.UnitTests.csproj -c Release --filter "FullyQualifiedName~DapperModelScheduleRepositoryContractTests|FullyQualifiedName~ScheduleOccurrencePlannerTests|FullyQualifiedName~ModelOperationRequestServiceTests" --logger "trx;LogFileName=DispatcherCasContractTests_20260809.trx" --results-directory evidence/AEG-V15-036
  • Result: passed 8/8; artifact: evidence/AEG-V15-036/DispatcherCasContractTests_20260809.trx; SHA-256: 148FF7904CAE7372DD4728C24B845E280CEEE3116E5787BE621EC8E2E9005921.
  • The test locks the repository contract: dispatched, no-dispatch advance, and release SQL must all match both the lease owner and the acquired dispatch_revision.
  • Not complete: a PostgreSQL concurrency test must acquire/reacquire the same schedule and show the stale revision updates zero rows. Until that artifact exists, the WBS remains IN_PROGRESS.