AEG-VS-05-01 — Execution Readiness Blocker

  • WBS ID: AEG-VS-05-01
  • Slice: VS-05 IngestFundamentalsPIT
  • Requirement / API / DB / Job / UI / Test IDs: REQ-FND-001 / DAT-05 / MIG-FND-001/002 / J04 / UI-FND-01 / T-FND-001
  • Gate: G1
  • Selected on: 2026-08-08
  • Status: BLOCKED — no implementation has started.

Source

  • docs/CURRENT/CATALOGS/WBS_MASTER.csv, row AEG-VS-05-01, defines VS-05 as IngestFundamentalsPIT and requires the public-time and correction history of disclosures, financials, and consensus data.
  • docs/CURRENT/CATALOGS/WBS_PROGRESS_TRACKER.csv records only AEG-VS-02-01 as completed for the declared VS-02 dependency.
  • docs/contracts/architecture/VS-05_RISK_METRICS_SLICE_SPEC.md and docs/contracts/data/VS-05_DATA_CONTRACT.md instead define VS-05 as Risk Metrics, including portfolio risk calculations and an unrelated migration 0034_risk_metrics.sql.

Assumption

  • VS-02 in the WBS dependency means the completed fundamentals-relevant governance/data prerequisite, not merely a similarly named document. This cannot presently be demonstrated from the tracker.

Unknown / Decision Required

  1. Confirm whether the two existing VS-05 contract files are superseded/misfiled Risk Metrics artifacts, or whether the WBS slice/module mapping must change.
  2. Approve the Fundamentals PIT contract: source authority, public availability timestamp semantics, correction/revision model, consensus licensing/entitlement, retention, and J04 schedule ownership.
  3. Record the concrete completed prerequisite(s) replacing ambiguous dependency VS-02, then approve Gate G1 entry.

Safe Resolution Options

  • Recommended: The PM/Architect issues an approved VS-05 IngestFundamentalsPIT Slice Spec and data contract (using the reviewed templates) and moves/makes obsolete the Risk Metrics documents with a Decision Log entry. Then the dependency is expressed with concrete WBS IDs and Gate G1 evidence.
  • Alternative: Amend WBS_MASTER.csv and Traceability Matrix so the existing Risk Metrics contracts become the authoritative VS-05 definition. This changes the planned product scope and requires formal approval.

Evidence Produced

  • This blocker record.
  • Updated WBS_PROGRESS_TRACKER.csv state and pointer.

No API, database migration, job, UI, policy, or test was added. Therefore no build, test, migration, or Gate pass is claimed.