docs: add Phase 2 gate failure remediation plan (WBS contingency)
- Scenario 1 (PBO > 20%): 3 remediation options (confidence filtering, position sizing, stop-loss)
- Scenario 2 (DSR < 95%): 3 remediation options (lower threshold, momentum indicator, adaptive sizing)
- Scenario 3 (both fail): Hybrid model strategy
- Fallback strategies: Simplified EMA, mean-reversion, conservative targets
- Timeline: 2-4 hours recovery + 1 hour Phase 1 re-run = 3-5 hours total

Decision matrix with confidence levels for all scenarios.
Execution plan with step-by-step guidance.

WBS Optimization: Prepare contingency paths in parallel with Phase 2 judgment.
AGENTS.md v16.0: Necessity (if gates fail), Right-way (documented procedures), Tech Debt (zero new).