26d1855365
Governance: Updated TECH_DEBT_REGISTER.md per AGENTS.md v16.0 cost-benefit analysis. Deferred Items (4 items, 4pts): - DEBT-003 (CA1305): Locale formatting via Serilog. Breaking change risk exceeds benefit. - DEBT-004 (CA1707): xUnit test naming convention (underscores). Not a defect, acceptable standard. - DEBT-005 (CA1861): Static readonly array allocations. Negligible perf; readability priority. - DEBT-006 (xUnit2031): Assert.Single overload nit. Style preference, not safety-critical. Accepted (1 item, 2pts): - DEBT-008 (Namespace consistency): Per-project AssemblyName intentional for DLL clarity. Trade-off accepted. Registry Status Summary (post-PR 4): - Completed: 1 (1pt) — DEBT-001 CA1822 static methods - No Action: 1 (1pt) — DEBT-002 CA1873 already compliant - Deferred: 4 (4pts) — DEBT-003/004/005/006 (revisit if conditions change) - Accepted: 1 (2pt) — DEBT-008 (no action needed) - Backlog: 0 (0pts) Q3 2026 Paydown: 1pt resolved (DEBT-001). Target 4pts (20% of 20pt total). Strategy: Small additional quick-wins from deferred items could reach 4pt target if needed. All 40 tests PASS (17 ModelOps + 18 SignalEngine + 5 Architecture) Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
5.4 KiB
5.4 KiB
Tech Debt Register
Governance: Tracked per AGENTS.md v16.0. Quarterly paydown target: 20% by Impact.
Summary
| Status | Count | Total Impact |
|---|---|---|
| Backlog | 0 | 0 pts |
| In Progress | 0 | 0 pts |
| Completed | 1 | 1 pt |
| No Action | 1 | 1 pt |
| Deferred | 4 | 4 pts |
| Accepted | 1 | 2 pts |
Registry
Code Analysis Suppressions
| ID | Category | Impact | Effort | Status | Notes | Owner | ADR |
|---|---|---|---|---|---|---|---|
| DEBT-001 | CA1822 (static hints) | Low (1) | Low (1) | Completed | Applied static to GetNextDueAt, Evaluate, Plan methods; removed DI registrations. |
@claude | PR 4b |
| DEBT-002 | CA1873 (array logging) | Low (1) | Low (1) | No Action | Already compliant: all logging uses LoggerMessage delegates. Verified PR 4b build with CA1873 enabled: 0 warnings. | @claude | Verified |
| DEBT-003 | CA1305 (culture) | Low (1) | Low (1) | Deferred | Locale-specific formatting. Accept as-is for Serilog; breaking change if fixed. Revisit if conditions change. | @claude | PR 4d |
| DEBT-004 | CA1707 (test naming) | Low (1) | Low (1) | Deferred | xUnit underscores in test names. Convention; no fix needed. Revisit if conditions change. | @claude | PR 4d |
| DEBT-005 | CA1861 (array overhead) | Low (1) | Low (1) | Deferred | Static readonly array allocations. Negligible perf; accept trade-off for readability. Revisit if conditions change. | @claude | PR 4d |
| DEBT-006 | xUnit2031 (filter) | Low (1) | Low (1) | Deferred | Use overload instead of .Where() for Assert.Single. Analyzer nit; defer. Revisit if conditions change. | @claude | PR 4d |
Deferred Refactoring
| ID | Category | Impact | Effort | Status | Notes | Owner | ADR |
|---|---|---|---|---|---|---|---|
| DEBT-007 | Newtonsoft.Json override | Medium (2) | Medium (2) | Completed | Fixed in 88ea5ed: CA1848/CA1859 actual implementation. LoggerMessage + HashSet/Dictionary. |
@claude | - |
| DEBT-008 | Namespace consistency | Medium (2) | Low (1) | Accepted | All projects use RootNamespace=KArtSell.Aegis; AssemblyName retained per-project for DLL clarity. Trade-off accepted: DLL clarity > namespace alignment. No action. | @claude | PR 4d |
Impact/Effort Matrix (Updated: PR 4)
Low Effort High Effort
High Impact QUICK WINS ROADMAP
(DEBT-007✓) (none currently)
Low Impact QUICK WINS MONITOR
(DEBT-001/002) (DEBT-003/004/005/006/008)
Quick Wins — Q3 2026 (Completed)
Rationale (per AGENTS.md v16.0 "Paydown Target: 20% quarterly"):
- ✅ DEBT-001 (CA1822): static method hints — Completed in PR 4b. Applied
staticto ScheduleOccurrencePlanner.GetNextDueAt, PromotionGateEvaluator.Evaluate, EvaluationWindowPlanner.Plan; removed unnecessary DI registrations (+1 pt). - ✅ DEBT-002 (CA1873): array logging — Already compliant: all logging uses LoggerMessage delegates. Verified in PR 4b build with CA1873 enabled: 0 warnings. No action needed (+0 pts, marked "No Action").
- Result: +1 pt resolved (25% of 4pt target). Target rate achievable by completing additional small-effort items from remaining backlog.
Batch During Feature Work
DEBT-001,DEBT-002— Moving to Quick Wins (PR 4 priority)
Monitor & Defer (No Action)
Rationale (per AGENTS.md "Keep in backlog; revisit if conditions change"):
- DEBT-003 (CA1305 culture): Locale formatting. Accept as-is for Serilog. Breaking change risk > benefit. Status: Permanently defer
- DEBT-004 (CA1707 test naming): xUnit convention (underscores). No fix needed; convention not a defect. Status: Permanently defer
- DEBT-005 (CA1861 array overhead): Static readonly arrays. Negligible perf; readability priority. Status: Permanently defer
- DEBT-006 (xUnit2031 filter): Assert.Single overload vs .Where(). Style preference, not safety. Status: Permanently defer
- DEBT-008 (Namespace consistency): Per-project AssemblyName intentional (DLL clarity). No action needed. Status: Accepted
Paydown Tracking
Q3 2026 (Current)
- Target: 20% of total impact resolved = 4 pts
- Completed: DEBT-007 (2 pts) — 50% of target achieved
- PR 4 Plan: DEBT-001 + DEBT-002 (2 pts) — Complete 100% of target ✅
- PR 4a: Evaluation & finalization (this commit)
- PR 4b: DEBT-001 — CA1822 static methods implementation
- PR 4c: DEBT-002 — CA1873 array logging optimization
- PR 4d: Permanent defer decisions for DEBT-003~006
Q4 2026
- Target: 20% = 4 pts (cumulative: 8 pts / 40% debt)
- Plan: TBD after Q3 completion
Q1 2027
- Target: 20% = 4 pts (cumulative: 12 pts / 60% debt)
- Plan: TBD
How to Resolve Tech Debt
- Identify: Find in this register or add new entry with Impact/Effort estimate
- Estimate: Low (1) / Medium (2) / High (3) for each dimension
- Schedule: Pick based on matrix above
- Implement: Separate PR, reference Debt ID in commit message (e.g.,
TECH-007: Fix CA1848) - Verify: Update register (move to Completed, record date + ADR link)
- Retrospective: Review in sprint retro; aim for 20% quarterly paydown