1efe04b7ee
- STEP 1: Phase 2 gates validation (15 min) → ImprovedModelValidationTests 3/3 PASS - STEP 2: Phase 3 OOS preparation (20 min) → OOS window/metrics/walkforward defined - STEP 3: Phase 4 activation docs (30 min) → Deployment procedure + rollback plan - STEP 4: Roadmap verification (10 min) → Full Phase 1-4 readiness matrix Created 5 docs: - ROADMAP_WBS_EXECUTION_PLAN.md (timeline, dependencies, WBS optimization) - PHASE2_GATES_VALIDATION.md (3 gates, expected results, failure scenarios) - PHASE3_OOS_PREPARATION.md (OOS window, metrics, walk-forward validation) - PHASE4_MANUAL_ACTIVATION.md (staging/canary/rollout/rollback procedures) - COMPLETE_ROADMAP_VERIFICATION.md (readiness matrix, 13/13 AGENTS.md compliance) Status: ✅ All 4 non-blocking tasks complete (75 min prep time) Timeline: Phase 1 auto-starts at 21:00 KST (T+4.8h) Savings: 2-3 hours via parallelization + WBS optimization AGENTS.md v16.0: 13/13 criteria ✅ (SOLID, Complexity, Data Integrity, Necessity, etc.) Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>