Files
KArtSell.Aegis/docs/CURRENT/PHASE-1_SHADOW_RUN_STATUS_CORRECTION.md
T
kjh2064 c3242e3c67
ci / backend (push) Failing after 0s
ci / static (push) Failing after 5s
ci / backend (pull_request) Failing after 1s
ci / static (pull_request) Failing after 9s
Build & Test with Secrets / build (pull_request) Failing after 1s
ci / frontend (push) Successful in 3m42s
Build & Test with Secrets / security-scan (pull_request) Failing after 8s
Build & Test with Secrets / frontend (pull_request) Successful in 3m46s
ci / frontend (pull_request) Successful in 3m56s
ci / publish (push) Has been skipped
Build & Test with Secrets / notification (pull_request) Failing after 1s
ci / publish (pull_request) Has been skipped
docs: correct shadow run status from evidence
2026-08-06 14:11:22 +09:00

1.6 KiB

PHASE-1-SHADOW-RUN status correction

WBS traceability

  • WBS: PHASE-1-SHADOW-RUN
  • Requirement: REQ-PLAT-001 / Gate 5a
  • Source: docs/CURRENT/WBS_EXECUTION_PROCEDURES.md, WBS tracker, preserved execution logs
  • Assumption: preserved local logs are the authoritative evidence available in this workspace.
  • Unknown: current remote Hangfire/database state is not available from this read-only workspace.
  • Decision Required: approve the status contract correction and a fresh approved test-database rehearsal before re-queueing any Phase 1 run.

Observed evidence

  • logs/phase-1-execution.log: enqueue attempts report failure and a critical queue failure.
  • logs/host-startup-20260804-173000.log: PostgresException 23514, relation shadow_run, constraint check_status.
  • Same log: POST /api/shadow-runs responded 500.
  • evidence/gate-5-signoff/PRODUCTION_READY_DECLARATION.md: explicitly records that Job 893 was never actually started.

Correct status

PHASE-1-SHADOW-RUN is BLOCKED, not RUNNING.

The prior RUNNING claim is not retained as execution evidence. No 252+ trading-day result, PBO/DSR result, or production-readiness conclusion may be derived from the failed enqueue attempt.

Safe resolution sequence

  1. Reconcile the active shadow_run.check_status constraint with the application status contract.
  2. Rehearse fresh/upgrade/re-run/failure behavior on the approved test database.
  3. Preserve the corrected migration/test evidence and update the WBS tracker.
  4. Obtain explicit approval before re-queueing Phase 1.
  5. Record a new Run ID/Job ID and only then set the WBS status to RUNNING.