722c1d7306
Complete execution roadmap in one concise guide 5-Minute Overview: 1. Pre-Flight (15 min) - Infrastructure verification 2. Prepare Database (5 min) - Setup scripts 3. Execute Shadow Run (30-60 min) - Monitor via dashboard 4. Validate Results (10 min) - SQL gate checks 5. Approve (5 min) - Maker-checker workflow Total Time: ~90-120 minutes end-to-end References all 5 guides in execution order with time estimates Quick navigation to troubleshooting & support paths Status summary: PRODUCTION-READY Complete Toolkit Now Available: ✓ GATE_3_QUICK_START.md (this file - navigation hub) ✓ GATE_3_EXECUTION_GUIDE.md (detailed 7-section guide) ✓ GATE_3_PREFLIGHT_CHECKLIST.md (15-min verification) ✓ GATE_3_SETUP_SCRIPTS.md (automation & scripts) ✓ GATE_3_RESULTS_VALIDATION.md (post-execution checks) ✓ GATE_3_TROUBLESHOOTING.md (recovery & escalation) All 5 production readiness gates implemented & documented: - Gate 1: DbUp migrations ✅ - Gate 2: Crash-recovery ✅ - Gate 3: Shadow run (READY FOR EXECUTION) ✅ - Gate 4: Activation workflow ✅ - Gate 5: Observability metrics ✅ Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
3.5 KiB
3.5 KiB
Gate 3 Execution Quick Start
Complete production readiness package for 252-day shadow run validation
📋 How to Execute (5-Minute Summary)
Step 1: Pre-Flight (15 min)
# Read this first
GATE_3_PREFLIGHT_CHECKLIST.md
# Run scripts to verify infrastructure
.\gate3_test_api.ps1
.\gate3_check_market_data.ps1
Step 2: Prepare Database (5 min)
# Create test model if needed
# Run: GATE_3_SETUP_SCRIPTS.md SQL scripts
# Creates: model, cleans state, verifies schema
Step 3: Execute Shadow Run (30-60 min)
# Follow GATE_3_EXECUTION_GUIDE.md
# POST /api/shadow-runs with model ID + date window
# Monitor via Hangfire dashboard + polling script
Step 4: Validate Results (10 min)
# Read: GATE_3_RESULTS_VALIDATION.md
# Run SQL queries to verify gates (PBO, DSR, Cost2x)
# Decision: Proceed to approval or remediate
Step 5: Approve (5 min)
# Approval queue auto-populated
# Maker-checker approval via POST /api/v1/approval-queue/{id}/approve
# Model ready for activation
Total Time: ~90-120 minutes
📚 Complete Toolkit (5 Guides)
GATE_3_EXECUTION_GUIDE.md
- Length: 7 sections, 200+ lines
- Purpose: Step-by-step execution checklist
- Contains: Prerequisites, endpoints, monitoring, validation
GATE_3_PREFLIGHT_CHECKLIST.md
- Length: 5 sections, 150+ lines
- Purpose: 15-minute infrastructure verification
- Contains: SSH tunnel, PostgreSQL, API health, model selection, success criteria
GATE_3_SETUP_SCRIPTS.md
- Length: 6 scripts, 300+ lines
- Purpose: Automated database & API preparation
- Contains: SQL scripts, PowerShell automation, monitoring loops
GATE_3_RESULTS_VALIDATION.md
- Length: 4 sections, 250+ lines
- Purpose: Post-execution validation of gates
- Contains: Gate breakdown (PBO/DSR/Cost2x), phase analysis, audit trail
GATE_3_TROUBLESHOOTING.md
- Length: 15+ issues, 300+ lines
- Purpose: Recovery & escalation for common failures
- Contains: Root causes, fixes, quick-fix table, escalation paths
✅ What You Have
Complete, Production-Ready Execution Package:
- ✅ 5 comprehensive guides (1,200+ lines)
- ✅ 30+ copy-paste SQL queries
- ✅ 6 PowerShell automation scripts
- ✅ Decision matrices for gate failures
- ✅ Escalation contact matrix
- ✅ Prevention & recovery checklists
What's Already Done (Gates 1-5):
- ✅ Gate 1: DbUp migrations (14 tests)
- ✅ Gate 2: Crash-recovery (6 tests)
- ✅ Gate 3: Shadow run (6 E2E tests + execution guides)
- ✅ Gate 4: Activation workflow (6 tests + endpoints)
- ✅ Gate 5: Observability metrics (6 tests + service)
🚀 Next Actions
- Read GATE_3_PREFLIGHT_CHECKLIST.md (15 min verification)
- Run setup scripts from GATE_3_SETUP_SCRIPTS.md (prepare DB)
- Follow GATE_3_EXECUTION_GUIDE.md (execute shadow run)
- Validate with GATE_3_RESULTS_VALIDATION.md (verify gates)
- Troubleshoot if needed using GATE_3_TROUBLESHOOTING.md
📞 Support
- Pre-flight issues? → GATE_3_PREFLIGHT_CHECKLIST.md troubleshooting
- Setup problems? → GATE_3_SETUP_SCRIPTS.md scripts section
- Execution failing? → GATE_3_TROUBLESHOOTING.md
- Results unclear? → GATE_3_RESULTS_VALIDATION.md decision matrix
Status
All production readiness validation gates: READY FOR EXECUTION
Last updated: 2026-08-02
Preparation toolkit: COMPLETE
Infrastructure automation: READY
Documentation: COMPREHENSIVE