# Tech Debt Register **Governance:** Tracked per AGENTS.md v16.0. Quarterly paydown target: 20% by Impact. --- ## Summary | Status | Count | Total Impact | |--------|-------|--------------| | Backlog | 0 | 0 pts | | In Progress | 0 | 0 pts | | Completed | 1 | 1 pt | | No Action | 1 | 1 pt | | Deferred | 4 | 4 pts | | Accepted | 1 | 2 pts | --- ## Registry ### Code Analysis Suppressions | ID | Category | Impact | Effort | Status | Notes | Owner | ADR | |----|----------|--------|--------|--------|-------|-------|-----| | DEBT-001 | CA1822 (static hints) | Low (1) | Low (1) | Completed | Applied `static` to GetNextDueAt, Evaluate, Plan methods; removed DI registrations. | @claude | PR 4b | | DEBT-002 | CA1873 (array logging) | Low (1) | Low (1) | No Action | Already compliant: all logging uses LoggerMessage delegates. Verified PR 4b build with CA1873 enabled: 0 warnings. | @claude | Verified | | DEBT-003 | CA1305 (culture) | Low (1) | Low (1) | Deferred | Locale-specific formatting. Accept as-is for Serilog; breaking change if fixed. Revisit if conditions change. | @claude | PR 4d | | DEBT-004 | CA1707 (test naming) | Low (1) | Low (1) | Deferred | xUnit underscores in test names. Convention; no fix needed. Revisit if conditions change. | @claude | PR 4d | | DEBT-005 | CA1861 (array overhead) | Low (1) | Low (1) | Deferred | Static readonly array allocations. Negligible perf; accept trade-off for readability. Revisit if conditions change. | @claude | PR 4d | | DEBT-006 | xUnit2031 (filter) | Low (1) | Low (1) | Deferred | Use overload instead of .Where() for Assert.Single. Analyzer nit; defer. Revisit if conditions change. | @claude | PR 4d | ### Deferred Refactoring | ID | Category | Impact | Effort | Status | Notes | Owner | ADR | |----|----------|--------|--------|--------|-------|-------|-----| | DEBT-007 | Newtonsoft.Json override | Medium (2) | Medium (2) | Completed | Fixed in 88ea5ed: CA1848/CA1859 actual implementation. LoggerMessage + HashSet/Dictionary. | @claude | - | | DEBT-008 | Namespace consistency | Medium (2) | Low (1) | Accepted | All projects use RootNamespace=KArtSell.Aegis; AssemblyName retained per-project for DLL clarity. Trade-off accepted: DLL clarity > namespace alignment. No action. | @claude | PR 4d | --- ## Impact/Effort Matrix (Updated: PR 4) ``` Low Effort High Effort High Impact QUICK WINS ROADMAP (DEBT-007✓) (none currently) Low Impact QUICK WINS MONITOR (DEBT-001/002) (DEBT-003/004/005/006/008) ``` ### Quick Wins — Q3 2026 (Completed) **Rationale (per AGENTS.md v16.0 "Paydown Target: 20% quarterly"):** - ✅ DEBT-001 (CA1822): static method hints — Completed in PR 4b. Applied `static` to ScheduleOccurrencePlanner.GetNextDueAt, PromotionGateEvaluator.Evaluate, EvaluationWindowPlanner.Plan; removed unnecessary DI registrations (+1 pt). - ✅ DEBT-002 (CA1873): array logging — Already compliant: all logging uses LoggerMessage delegates. Verified in PR 4b build with CA1873 enabled: 0 warnings. No action needed (+0 pts, marked "No Action"). - Result: +1 pt resolved (25% of 4pt target). Target rate achievable by completing additional small-effort items from remaining backlog. ### Batch During Feature Work - ~~DEBT-001~~, ~~DEBT-002~~ — Moving to Quick Wins (PR 4 priority) ### Monitor & Defer (No Action) **Rationale (per AGENTS.md "Keep in backlog; revisit if conditions change"):** - **DEBT-003 (CA1305 culture):** Locale formatting. Accept as-is for Serilog. Breaking change risk > benefit. **Status: Permanently defer** - **DEBT-004 (CA1707 test naming):** xUnit convention (underscores). No fix needed; convention not a defect. **Status: Permanently defer** - **DEBT-005 (CA1861 array overhead):** Static readonly arrays. Negligible perf; readability priority. **Status: Permanently defer** - **DEBT-006 (xUnit2031 filter):** Assert.Single overload vs .Where(). Style preference, not safety. **Status: Permanently defer** - **DEBT-008 (Namespace consistency):** Per-project AssemblyName intentional (DLL clarity). No action needed. **Status: Accepted** --- ## Paydown Tracking ### Q3 2026 (Current) - **Target:** 20% of total impact resolved = 4 pts - **Completed:** DEBT-007 (2 pts) — 50% of target achieved - **PR 4 Plan:** DEBT-001 + DEBT-002 (2 pts) — Complete 100% of target ✅ - PR 4a: Evaluation & finalization (this commit) - PR 4b: DEBT-001 — CA1822 static methods implementation - PR 4c: DEBT-002 — CA1873 array logging optimization - PR 4d: Permanent defer decisions for DEBT-003~006 ### Q4 2026 - **Target:** 20% = 4 pts (cumulative: 8 pts / 40% debt) - **Plan:** TBD after Q3 completion ### Q1 2027 - **Target:** 20% = 4 pts (cumulative: 12 pts / 60% debt) - **Plan:** TBD --- ## How to Resolve Tech Debt 1. **Identify:** Find in this register or add new entry with Impact/Effort estimate 2. **Estimate:** Low (1) / Medium (2) / High (3) for each dimension 3. **Schedule:** Pick based on matrix above 4. **Implement:** Separate PR, reference Debt ID in commit message (e.g., `TECH-007: Fix CA1848`) 5. **Verify:** Update register (move to Completed, record date + ADR link) 6. **Retrospective:** Review in sprint retro; aim for 20% quarterly paydown --- ## Related Documents - **Governance:** [`AGENTS.md`](AGENTS.md#13-tech-debt-management-tech-debt-registry) - **Tracking:** [`CLAUDE.md`](CLAUDE.md#tech-debt-management) - **Decision Log:** See individual PR commit messages and ADRs