# Gate 5: PBO/DSR Metrics Validation Report **Status:** ⏳ IN PREPARATION **Phase:** 2 (Post Job 893 Execution) **Timeline:** TBD (5-10 days after Phase 1) **Template Version:** 2026-08-03 --- ## 📊 **Metrics Summary** ### PBO (Probability of Backtest Overfit) | Metric | Target | Result | Status | |--------|--------|--------|--------| | **PBO Value** | ≥ ? | TBD | ⏳ Pending | | **CSCV Score** | ≥ ? | TBD | ⏳ Pending | | **Confidence Interval** | 95% | TBD | ⏳ Pending | | **Sample Size** | 252+ days | TBD | ⏳ Pending | ### DSR (Daily Sharpe Ratio) | Metric | Target | Result | Status | |--------|--------|--------|--------| | **DSR Value** | > baseline | TBD | ⏳ Pending | | **Baseline** | ? | TBD | ⏳ Pending | | **Minimum Period** | 252 days | TBD | ⏳ Pending | | **Volatility** | Acceptable | TBD | ⏳ Pending | --- ## ✅ **Validation Checklist** ### PBO Validation - [ ] Data extracted from Job 893 - [ ] CSCV methodology applied (or simplified variant if DEBT-009 deferred) - [ ] Cross-validation performed - [ ] Confidence intervals calculated - [ ] Results within acceptable range - [ ] Evidence documented ### DSR Validation - [ ] Daily returns calculated - [ ] Sharpe ratio computed (252-day window) - [ ] Baseline threshold established - [ ] DSR > baseline verified - [ ] No data gaps detected - [ ] Results documented ### OOS (Out-of-Sample) Performance - [ ] Bull market phase: DSR = ? - [ ] Bear market phase: DSR = ? - [ ] Sideways market phase: DSR = ? - [ ] Results within acceptable range - [ ] No systematic failure detected --- ## 📝 **Findings** ### PBO Analysis ``` [To be completed during Phase 2] Observation: Conclusion: Impact: ``` ### DSR Analysis ``` [To be completed during Phase 2] Observation: Conclusion: Impact: ``` ### OOS Phase Analysis ``` [To be completed during Phase 2] Bull Market DSR: TBD Bear Market DSR: TBD Sideways Market DSR: TBD Overall: TBD ``` --- ## ✅ **Gate 5 Phase 2 Completion** - [ ] All metrics collected - [ ] Validation complete - [ ] Evidence archived - [ ] Report approved - **Status:** ✅ **PASS** or ❌ **FAIL** (TBD) --- **Next:** Phase 3 (Crash Recovery Rehearsal)