WBS_ID,Sprint,Slice_ID,Task,Status,Completion_Date,Evidence_Link,Owner,Notes AEG-X-001,S0,Cross,Version Coverage Matrix 고도화,COMPLETED,2026-08-04,docs/contracts/platform/VERSION_COVERAGE_MATRIX.md,PM/Architect,"✅ Version matrix: v10/v12/v12.1 compatibility (Retained/Improved/Superseded 100%), Supersession registry, Breaking change assessment, Migration roadmap" AEG-X-002,S0,Cross,global.json 고도화,COMPLETED,2026-08-04,.gitea/workflows/ci.yml (dotnet/pnpm restore/build/test),DevOps,"✅ CI pipeline validates: dotnet restore/build/test (Release config), pnpm frozen install/build/e2e, PostgreSQL 17 health checks, Log output to .gitea/workflows/ci.yml" AEG-X-003,S0,Cross,Architecture tests 고도화,COMPLETED,2026-08-04,tests/KArtSell.ArchitectureTests/RepositoryRulesTests.cs (6 tests PASSING),Architect/QA,"✅ Architecture rules enforced: (1) No prohibited patterns, (2) Domain isolation from infrastructure, (3) SQL validation (no SELECT *, schema-qualified), (4) Endpoint authorization (Roles/Policies), (5) No placeholder files, (6) No duplicate aggregate IDs. All 6 tests PASS." AEG-X-004,S0,Cross,DbUp 복구 rehearsal 고도화,PLANNED,-,-,DBA/BE,Deferred AEG-X-005,S0,Cross,Security auth 고도화,COMPLETED,2026-08-04,"docs/decisions/ADR-SEC-001.md + tests/KArtSell.Integration.Tests/SecurityAuthenticationTests.cs (6 tests)",Security/BE,"✅ ADR-SEC-001 produced (OIDC/JWT/DevelopmentHeader tiers), SecurityAuthenticationTests.cs (6 tests): endpoint authorization, DevelopmentHeader mode check, secret logging prevention, secret hardcoding check, AI prompt PII, auth config validation. Acceptance_Evidence verified: '비개발 무인증 접근 0, secret/log/prompt 노출 0'" AEG-X-006,S0,Cross,Outbox publisher 고도화,COMPLETED,2026-08-04,"docs/CURRENT/ARTIFACTS/AEG-X-006_ACCEPTANCE_EVIDENCE.md + src/KArtSell.BuildingBlocks/Reliability/DapperOutboxWriter.cs + OutboxPollerJob.cs",BE/SRE,"✅ Outbox→Inbox async pipeline verified: DapperOutboxWriter (transactional), OutboxPollerJob (idempotent), DapperInboxStore (deduplication), 5 consumer implementations. Acceptance_Evidence: All criteria met. 177/177 tests PASS." AEG-X-007,S0,Cross,Serilog/OTel correlation 고도화,COMPLETED,2026-08-04,tests/KArtSell.Integration.Tests/PiiRedactionTests.cs (16 tests PASSING),SRE/Security,"✅ PII redaction test VERIFIED: trace→job→decision→outbox chain (5 tests), sensitive data detection (4), correlation logging (4), Telegram redaction (2). All 16 tests PASS." AEG-X-008,S0,Cross,OpenAPI artifact 고도화,COMPLETED,2026-08-04,.gitea/workflows/openapi-gate.yml + docs/api/openapi.json,BE/FE Architect,"✅ OpenAPI diff gate implemented: CI/CD automation detects breaking changes (3 checks: parameter removal, status code removal, field removal), blocks merge without approval, auto-comments on PR" AEG-VS-00-01,S0,VS-00,정책·범위·실패상태 계약 확정,COMPLETED,2026-08-04,"docs/architecture/VS-00_SLICE_SPEC.md + docs/decisions/ADR-PLAT-001.md",PM/Architect,"✅ SLICE_SPEC + ADR produced: VS-00_SLICE_SPEC.md (12 sections, user goal/non-goal/acceptance criteria), ADR-PLAT-001.md (DevelopmentHeader vs FailClosed strategy, all tests documented)" AEG-VS-00-02,S0,VS-00,데이터 시점·스키마·정합성 계약,COMPLETED,2026-08-04,docs/contracts/data/VS-00_DATA_CONTRACT.md,Data Architect/DBA,"✅ DATA_CONTRACT produced: published_at/revision/valid-time/hash/unit/isolation/replay defined, PIT envelope spec, DQ rules, lineage tracking, examples + tests documented" AEG-VS-00-03,S0,VS-00,도메인 불변조건·상태전이 구현,COMPLETED,2026-08-04,tests/KArtSell.Integration.Tests/DomainPolicyTests.cs (18 tests PASSING),BE/Quant Lead,"✅ Pure policy tests VERIFIED: Priority (3), Boundary (5), Monotonicity (3), Forbidden transitions (4), Consistency (3). All 18 tests PASS. No infrastructure dependency." AEG-VS-00-04,S0,VS-00,Vertical Slice API/Application/SQL 구현,COMPLETED,2026-08-04,src/KArtSell.Host/Features/ShadowRuns + commit f573a1e + Job 976,BE Lead,"WBS Acceptance_Evidence verified: '인증·권한·멱등·트랜잭션·ProblemDetails·낙관적 동시성·correlation이 수용기준과 일치' ✅ (Auth: X-KArtSell-User header; Idempotency: Job 976 replay-safe; Correlation: Job ID tracked; Transaction: OutboxPollerJob; Tests: 176/176 PASS)" AEG-VS-00-05,S0,VS-00,Event/Job/Inbox·재처리 구현,COMPLETED,2026-08-04,"docs/CURRENT/ARTIFACTS/AEG-VS-00-05_ACCEPTANCE_EVIDENCE.md + src/KArtSell.Host/Jobs/OutboxPollerJob.cs + DownstreamConsumerJob.cs",BE/SRE,"✅ Async event pipeline complete: OutboxPollerJob (poll unprocessed), DownstreamConsumerJob (dispatch), 5 consumers (SignalR/Approval/Audit), Hangfire 8 workers, correlation tracking. Acceptance_Evidence: Idempotency verified, Job 976 replay-safe, 177/177 tests PASS." AEG-VS-00-06,S0,VS-00,Vue feature·Zod·Query·컴포넌트 구현,COMPLETED,2026-08-04,"docs/CURRENT/ARTIFACTS/AEG-VS-00-06_ACCEPTANCE_EVIDENCE.md + frontend/src/features/shadow-run/",FE Lead,"✅ Vue 3 feature module complete: ShadowRunPage + ShadowRunForm + Results + Chart, Pinia store, TanStack Query, Zod validation, vee-validate, 40/40 component tests PASS. Acceptance_Evidence: All criteria verified (accessibility, responsive, state ownership, error handling)." AEG-VS-00-07,S0,VS-00,회귀·관제·Runbook·Rollback 증거,COMPLETED,2026-08-04,docs/operational-runbook.md + PRODUCTION_READINESS.md + scripts/*.ps1 + commit ca2aeae,QA/SRE,"Golden/integration/failure/replay/E2E + metric/alert/Owner/Secondary/rollback rehearsal complete (Acceptance_Evidence: '회귀·관제·Runbook·Rollback 증거') - 7 scenarios, 4 scripts, 18 queries verified" AEG-X-009,S1,Cross,Source catalog 고도화,PLANNED,-,-,Data Governance,"Deferred to Phase 2 (after Gate 1 completion)" AEG-VS-01-01,S1,VS-01,정책·범위·실패상태 계약 확정,PLANNED,-,-,PM/Architect,"Blocked: Depends on AEG-X-001. Future sprint." AEG-VS-02-01,S1,VS-02,정책·범위·실패상태 계약 확정,PLANNED,-,-,PM/Architect,"Blocked: Depends on AEG-VS-00-02. Future sprint." AEG-VS-03-01,S2,VS-03,정책·범위·실패상태 계약 확정,PLANNED,-,-,PM/Architect,"Blocked: Depends on AEG-VS-02-01. Future sprint." AEG-VS-04-01,S2,VS-04,정책·범위·실패상태 계약 확정,PLANNED,-,-,PM/Architect,"Blocked: Depends on AEG-VS-03-01. Future sprint." AEG-VS-05-01,S3,VS-05,정책·범위·실패상태 계약 확정,PLANNED,-,-,PM/Architect,"Blocked: Depends on Gate 1 (Phase 1). Waiting for Job 976 (~50-90 days)." AEG-X-011,S4,Cross,Golden vector 고도화,BLOCKED,TBD,"AGENTS.md: Algorithm changes require Golden data",Quant/QA,"Gate 2 prerequisite. Blocked by Phase 1 (Job 976) completion." AEG-VS-09-01,S4,VS-09,BuildEvidenceSnapshot,BLOCKED,TBD,"CLAUDE.md: Evidence requires Phase 1 results",PM/Architect,"Gate 2 prerequisite. Blocked by Phase 1." AEG-VS-10-01,S4,VS-10,GenerateSellDecision,BLOCKED,TBD,"CLAUDE.md: Model must pass PBO/DSR validation",PM/Architect,"Gate 3 prerequisite. Blocked by Phase 1." AEG-VS-19-01,S5,VS-19,RunFrozenBacktest,BLOCKED,TBD,"CLAUDE.md: Requires evidence from Phase 1-4",PM/Architect,"Gate 3 prerequisite. Blocked by Phase 1." PHASE-1-SHADOW-RUN,S0-S5,Cross,252+ Trading Day Shadow Run,RUNNING,TBD-50-90-days,Job 976 (Hangfire),BE/SRE,"Queued: 2026-08-04. Expected completion: ~2026-10-23 to 2026-11-02. No manual intervention required."