# Gate 3 Execution Quick Start **Complete production readiness package for 252-day shadow run validation** --- ## 📋 How to Execute (5-Minute Summary) ### Step 1: Pre-Flight (15 min) ```bash # Read this first GATE_3_PREFLIGHT_CHECKLIST.md # Run scripts to verify infrastructure .\gate3_test_api.ps1 .\gate3_check_market_data.ps1 ``` ### Step 2: Prepare Database (5 min) ```bash # Create test model if needed # Run: GATE_3_SETUP_SCRIPTS.md SQL scripts # Creates: model, cleans state, verifies schema ``` ### Step 3: Execute Shadow Run (30-60 min) ```bash # Follow GATE_3_EXECUTION_GUIDE.md # POST /api/shadow-runs with model ID + date window # Monitor via Hangfire dashboard + polling script ``` ### Step 4: Validate Results (10 min) ```bash # Read: GATE_3_RESULTS_VALIDATION.md # Run SQL queries to verify gates (PBO, DSR, Cost2x) # Decision: Proceed to approval or remediate ``` ### Step 5: Approve (5 min) ```bash # Approval queue auto-populated # Maker-checker approval via POST /api/v1/approval-queue/{id}/approve # Model ready for activation ``` **Total Time:** ~90-120 minutes --- ## 📚 Complete Toolkit (5 Guides) ### GATE_3_EXECUTION_GUIDE.md - **Length:** 7 sections, 200+ lines - **Purpose:** Step-by-step execution checklist - **Contains:** Prerequisites, endpoints, monitoring, validation ### GATE_3_PREFLIGHT_CHECKLIST.md - **Length:** 5 sections, 150+ lines - **Purpose:** 15-minute infrastructure verification - **Contains:** SSH tunnel, PostgreSQL, API health, model selection, success criteria ### GATE_3_SETUP_SCRIPTS.md - **Length:** 6 scripts, 300+ lines - **Purpose:** Automated database & API preparation - **Contains:** SQL scripts, PowerShell automation, monitoring loops ### GATE_3_RESULTS_VALIDATION.md - **Length:** 4 sections, 250+ lines - **Purpose:** Post-execution validation of gates - **Contains:** Gate breakdown (PBO/DSR/Cost2x), phase analysis, audit trail ### GATE_3_TROUBLESHOOTING.md - **Length:** 15+ issues, 300+ lines - **Purpose:** Recovery & escalation for common failures - **Contains:** Root causes, fixes, quick-fix table, escalation paths --- ## ✅ What You Have **Complete, Production-Ready Execution Package:** - ✅ 5 comprehensive guides (1,200+ lines) - ✅ 30+ copy-paste SQL queries - ✅ 6 PowerShell automation scripts - ✅ Decision matrices for gate failures - ✅ Escalation contact matrix - ✅ Prevention & recovery checklists **What's Already Done (Gates 1-5):** - ✅ Gate 1: DbUp migrations (14 tests) - ✅ Gate 2: Crash-recovery (6 tests) - ✅ Gate 3: Shadow run (6 E2E tests + execution guides) - ✅ Gate 4: Activation workflow (6 tests + endpoints) - ✅ Gate 5: Observability metrics (6 tests + service) --- ## 🚀 Next Actions 1. **Read GATE_3_PREFLIGHT_CHECKLIST.md** (15 min verification) 2. **Run setup scripts** from GATE_3_SETUP_SCRIPTS.md (prepare DB) 3. **Follow GATE_3_EXECUTION_GUIDE.md** (execute shadow run) 4. **Validate with GATE_3_RESULTS_VALIDATION.md** (verify gates) 5. **Troubleshoot if needed** using GATE_3_TROUBLESHOOTING.md --- ## 📞 Support - **Pre-flight issues?** → GATE_3_PREFLIGHT_CHECKLIST.md troubleshooting - **Setup problems?** → GATE_3_SETUP_SCRIPTS.md scripts section - **Execution failing?** → GATE_3_TROUBLESHOOTING.md - **Results unclear?** → GATE_3_RESULTS_VALIDATION.md decision matrix --- ## Status **All production readiness validation gates: READY FOR EXECUTION** Last updated: 2026-08-02 Preparation toolkit: COMPLETE Infrastructure automation: READY Documentation: COMPREHENSIVE