chore: Start Phase 3 Crash Recovery Test execution (A+B parallel)
Phase 3: Crash Recovery Rehearsal (parallel with Phase 1)
Added:
- tests/PHASE_3_EXECUTION_LOG.md: Real-time execution tracking
* 4 crash recovery scenarios logged
* Pass/fail criteria defined
* Evidence collection planned
- tests/PHASE_3_TEST_PROCEDURES.md: Detailed test procedures
* Scenario 1: Outbox message loss recovery
* Scenario 2: PostgreSQL connection drop recovery
* Scenario 3: Hangfire distributed lock timeout (DEBT-015)
* Scenario 4: Inbox message processing failure
* Step-by-step procedures for each
* Evidence capture and verification criteria
Execution Strategy (AGENTS.md v16.0):
- Parallel execution: 4 scenarios simultaneously
- Estimated duration: 15-20 minutes
- Prerequisites verified: Host running, SSH tunnel open, Job 893 active
- Target: Complete testing before Phase 1 finishes (50-90 days)
Current Status:
✅ Phase 1: Job 893 running (22:04 KST)
✅ Phase 1 monitoring: Automated (5-min checks)
✅ Phase 3: READY TO EXECUTE (now)
⏳ Phase 2: Queued (Phase 1 results needed)
⏳ Phase 4: Queued (Phase 2-3 results needed)
Next: Execute Phase 3 scenarios (START NOW OR CONFIRM)
Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
|