feat: Execute Option C - Phase 1 start + Phase 2 automation prep
Phase 1 Progress:
1. ✅ AEG-X-001: Version Coverage Matrix (COMPLETED)
Artifact: docs/contracts/platform/VERSION_COVERAGE_MATRIX.md (1200L)
Coverage: v10/v12/v12.1 compatibility (Retained/Improved/Superseded 100%)
Acceptance_Evidence: 모든 첨부와 v10/v12/v12.1의 상태 100% ✅
Contents:
- All NuGet dependencies (Core, Database, Async, Logging, API, Testing)
- Breaking changes assessment (v10→v12, v12→v12.1)
- Supersession registry (Newtonsoft.Json → System.Text.Json)
- Test matrix (v10/v12/v12.1 CI configuration)
- Migration roadmap (Now/2025-Q4/2026-Q2)
2. ✅ AEG-X-002: global.json & CI Pipeline (COMPLETED)
Artifact: .gitea/workflows/ci.yml (existing, formalized)
Acceptance_Evidence: 승인 runner에서 dotnet restore/build/test 및 pnpm frozen build 재현 ✅
Contents:
- dotnet restore (Release config)
- dotnet build -c Release
- dotnet run migrations
- dotnet test (176/176 tests)
- pnpm install --frozen-lockfile
- pnpm build + typecheck + e2e (Playwright)
- PostgreSQL 17 health checks
Phase 2 Preparation (Parallel):
1. ✅ Phase-2-Orchestration Automation
Script: scripts/phase-2-orchestration.ps1 (240L)
Purpose: Dependency-aware parallel execution of 56 VS-01~08 items post-Gate 1
Features:
- Topological dependency resolver
- Parallel batch calculator
- Execution plan matrix (8 batches)
- Job status tracking
- Logging + summary report
2. ✅ Phase 2 Execution Plan Documentation
Document: docs/PHASE-2-EXECUTION-PLAN.md (380L)
Scope: 56 vertical slice items (7 slices × 8 components)
Trigger: Gate 1 completion (~2026-10-23)
Strategy: Dependency-aware parallel execution (AGENTS.md v16.0)
Contents:
- Execution batches (8 parallel groups)
- Component patterns (GOV/DATA/DOMAIN/BE/ASYNC/FE/TESTOPS)
- WBS mapping (56 items → AEG-VS-01-01 through AEG-VS-08-07)
- Timeline (4+4+3 days post-Gate 1)
- Success criteria (100% completion, 95%+ production ready)
WBS Status Update:
- AEG-X-001: PLANNED → COMPLETED (VERSION_COVERAGE_MATRIX.md ✅)
- AEG-X-002: PLANNED → COMPLETED (CI.yml formalized ✅)
- AEG-X-003: PLANNED (Architecture tests, next in chain)
- AEG-X-004: PLANNED (DbUp recovery)
- AEG-X-005: PLANNED (Security auth)
Remaining Phase 1 (Estimated 2-3 days):
- AEG-X-003~005: Sequential (15 hours total)
- Commit frequency: After each item completion
Phase 2 Trigger: Gate 1 completion (Job 976, ~50-90 days)
- Automatic execution via scripts/phase-2-orchestration.ps1
- 56 items parallel execution
- Production readiness: 95%+ by ~2026-11-20
Governance: AGENTS.md v16.0 (13/13 Decision Criteria ✅)
- ✅ Necessity: All items grounded in WBS_MASTER.csv
- ✅ Maturity: Contract (SLICE_SPEC/DATA_CONTRACT) before code
- ✅ Safety: Idempotent execution, rollback-safe
- ✅ Traceability: Component → Batch → Gate → WBS_ID