kjh2064
|
252dba1a57
|
Gate 3: Comprehensive Preparation Toolkit
Creates three detailed guides for production-ready shadow run execution:
1. GATE_3_PREFLIGHT_CHECKLIST.md (15 min checklist)
- Infrastructure verification (SSH, PostgreSQL, KArtSell.Host)
- Schema validation (all tables present)
- Market data availability (KRX API or stub)
- Execution readiness (model selection, date range)
- Success criteria understanding
- Troubleshooting for common pre-flight issues
2. GATE_3_SETUP_SCRIPTS.md (Automated preparation)
- SQL scripts: Create test model, clean state
- PowerShell: Check market data, test API, monitor jobs
- Reusable monitoring script with timeout/retry logic
- SQL validation queries for post-execution analysis
- Save/reference environment variables
3. GATE_3_RESULTS_VALIDATION.md (Post-execution verification)
- Validation gates breakdown (PBO, DSR, Cost2x)
- SQL queries to verify each gate
- Phase analysis interpretation (Bull/Bear/Sideways)
- Audit trail verification (CorrelationId tracing)
- Decision matrix (what to do if gates pass/fail)
- Troubleshooting post-execution issues
Features:
✓ Step-by-step execution paths
✓ Copy-paste SQL queries for validation
✓ PowerShell scripts for automation
✓ Clear success/failure criteria
✓ Escalation paths (who to contact if gates fail)
✓ Post-execution approval workflow integration
Preparation level: PRODUCTION-READY
Next: Run checklist, execute shadow run, validate results
Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
|
2026-08-02 13:27:25 +09:00 |
|