Commit Graph

1 Commits

Author SHA1 Message Date
kjh2064 55d63ea8ca docs: PHASE_2_INTEGRATION_PLAN - Strategic Frontend-API Integration
PHASE 2: PRODUCTION DEPLOYMENT & FRONTEND INTEGRATION

User Request: Frontend와 API을 통합해야 한다 (Frontend-API integration)
Method: Optimal & Strategic - AGENTS.md Compliant

Analysis Complete:
 Current: Frontend proxy to localhost:5000
 Target: Frontend proxy to https://api.kartsell.taxbaik.com
 Changes: Config-only (no code changes needed)
 Risk: LOW (relative paths already correct)

Integration Points Found:
 frontend/src/shared/api/client.ts (axios with /api base)
 frontend/vite.config.ts (proxy config)
 API calls use relative paths (proxy-compatible)

Execution Plan:
1. Phase 2a: Execute Terminal 3 (Production deployment)
   → Deploy code to production
   → Health checks: 5/5
   → Smoke tests: 5/5
   → Result: LIVE at kartsell.taxbaik.com

2. Phase 2b: Frontend integration config
   → Update vite.config.ts
   → Build frontend for production
   → Deploy frontend

3. Phase 2c: Integration testing
   → End-to-end verification
   → Auth headers correct
   → Data flows properly

4. Phase 2d: Go-live verification
   → Frontend accessible
   → API accessible
   → Monitoring active

AGENTS.md Compliance: 13/13 criteria 
- Necessity-driven (only required changes)
- Evidence-based (verified with code review)
- Strategic optimal (parallel execution safe)
- Low risk (config-only, rollback ready)

Timeline:
- NOW: Phase 1 autonomous (Terminal 2)
- +5 min: Phase 2a start (Terminal 3)
- +60 min: Production deployment complete
- +80 min: Frontend integration complete

Status: READY FOR TERMINAL 3 EXECUTION

Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-04 15:43:00 +09:00