Commit Graph

1 Commits

Author SHA1 Message Date
kjh2064 78048238ba chore: Add Gate 5 monitoring dashboard and status tracking
ci / backend (push) Failing after 0s
Build & Test with Secrets / build (push) Failing after 1s
ci / static (push) Failing after 6s
Build & Test with Secrets / security-scan (push) Failing after 5s
Build & Test with Secrets / frontend (push) Successful in 2m19s
ci / frontend (push) Successful in 2m21s
Build & Test with Secrets / notification (push) Failing after 1s
Gate 5: Production Ready Validation via Job 893 (252+ trading days)

Added:
- scripts/monitor-gate-5.ps1: Real-time Host & Job health monitoring
  * 5-minute check interval
  * Host connectivity verification
  * .NET process health tracking
  * Configurable monitoring duration (default 48h)

- GATE_5_STATUS.md: Daily status report template & tracking
  * Job details & configuration
  * Completed checklist (prerequisites verified)
  * Pending phases (Phases 1-4 timeline)
  * Risk log with mitigation strategies
  * Deliverables tracking matrix

Status (2026-08-03 22:04 KST):
 Job 893 queued and executing (253-day window)
 Host running in DEVELOPMENT mode (127.0.0.1:5002)
 Monitoring active (every 5 minutes)
 Phase 1 (Job execution): 50-90+ calendar days
 Phase 2-4 (Metrics/Crash-recovery/Sign-off): Queued after Phase 1

Success Criteria (Gate 5 = 100% Production Ready):
- Job 893 executes 252+ trading days
- PBO ≥ acceptable threshold
- DSR > baseline
- Outbox→Inbox crash-recovery verified
- All evidence documented

Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-03 22:06:34 +09:00