feat: require explicit model-operation holds (AEG-V15-037)

Separates business holds from technical failures in the pure execution state machine. Evidence: targeted Release tests 3/3 passed; TRX SHA256 2F2CD06B1DFD3F76F336A0636598553599CD05CF7FA82E477DB160425975085F.
This commit is contained in:
2026-08-09 02:14:55 +09:00
parent 00957bf384
commit d38dc32e7a
6 changed files with 114 additions and 5 deletions
@@ -10,6 +10,7 @@ AEG-V15-033,S8,VS-18,Schedule anchor 계산기,COMPLETED,2026-08-09,"docs/CURREN
AEG-V15-034,S8,VS-18,Catch-up policy 구현,COMPLETED,2026-08-09,"docs/CURRENT/AEG-V15-034_CATCH_UP_POLICY_SLICE_NOTE.md; src/KArtSell.Modules.ModelOperations/Domain/ScheduleOccurrencePlanner.cs; src/KArtSell.Modules.ModelOperations/Scheduling/ModelOperationsDispatcherJob.cs; src/KArtSell.Modules.ModelOperations/Infrastructure/DapperModelScheduleRepository.cs; tests/KArtSell.ModelOperations.UnitTests/ScheduleOccurrencePlannerTests.cs; evidence/AEG-V15-034/ScheduleOccurrencePlannerTests_20260809.trx",BE Lead,"Actual Release run: targeted ScheduleOccurrencePlannerTests 4/4 passed. LATEST_ONLY dispatches only the latest anchored occurrence; SKIP_MISSED advances the lease-held schedule without enqueueing stale work; ALL_WITH_LIMIT dispatches only the configured most-recent occurrences, each with an occurrence-specific UTC idempotency key. Schedules remain disabled. Database integration, lease CAS, and DEC-083 enqueue/mark atomicity are not claimed and remain owned by later WBS items."
AEG-V15-035,S8,VS-18,Due operation 계약 확장,COMPLETED,2026-08-09,"docs/CURRENT/AEG-V15-035_DUE_OPERATION_CONTRACT_SLICE_NOTE.md; src/KArtSell.Modules.ModelOperations/Application/ModelOperationsContracts.cs; src/KArtSell.Modules.ModelOperations/Application/ModelOperationRequestService.cs; src/KArtSell.Modules.ModelOperations/Scheduling/ScheduledModelOperationJob.cs; src/KArtSell.Modules.ModelOperations/Infrastructure/DapperModelOperationRequestRepository.cs; tests/KArtSell.ModelOperations.UnitTests/ModelOperationRequestServiceTests.cs; evidence/AEG-V15-035/DueModelOperationContractTests_20260809.trx",BE Lead,"Actual Release run: 5/5 targeted unit tests passed. The scheduler occurrence, catch-up policy, and max catch-up flow from due schedule through the serialized job and validated application request; scheduled_for is inserted in the normalized request model and all three values are retained in the transactional outbox payload. Schedules remain disabled. No new migration or PostgreSQL integration evidence is claimed: MIG-0020 already provides scheduled_for; policy and limit provenance is immutable in the event payload, while schedule configuration remains the normalized source referenced by schedule_id/version."
AEG-V15-036,S8,VS-18,Dispatcher nextDue CAS,COMPLETED,2026-08-09,"docs/CURRENT/AEG-V15-036_DISPATCH_CAS_SLICE_NOTE.md; src/KArtSell.Modules.ModelOperations/Application/ModelOperationsContracts.cs; src/KArtSell.Modules.ModelOperations/Infrastructure/DapperModelScheduleRepository.cs; src/KArtSell.Modules.ModelOperations/Scheduling/ModelOperationsDispatcherJob.cs; tests/KArtSell.ModelOperations.UnitTests/DapperModelScheduleRepositoryContractTests.cs; tests/KArtSell.Integration.Tests/Scheduling/ModelScheduleCasTests.cs; evidence/AEG-V15-036/DispatcherCasContractTests_20260809.trx; evidence/AEG-V15-036/ModelScheduleCasTests_20260809.trx",BE Lead,"Actual evidence: unit contract tests 8/8 passed and PostgreSQL integration ModelScheduleCasTests 1/1 passed. The integration test acquires an isolated schedule, expires/reacquires its lease, and verifies a stale owner/revision cannot mutate next_due_at (0-row CAS) while the current owner/revision remains. It found and fixed Dapper positional record materialization by mapping a SQL row DTO explicitly to DueModelOperation. Schedules remain disabled; DEC-083 enqueue/mark atomicity remains a separate later Slice."
AEG-V15-037,S8,VS-18,BusinessHold와 기술실패 분리,COMPLETED,2026-08-09,"docs/CURRENT/AEG-V15-037_EXECUTION_HOLD_SLICE_NOTE.md; src/KArtSell.Modules.ModelOperations/Domain/ModelOperationExecution.cs; tests/KArtSell.ModelOperations.UnitTests/ModelOperationExecutionTests.cs; evidence/AEG-V15-037/ModelOperationExecutionTests_20260809.trx",BE Lead,"Actual Release evidence: ModelOperationExecutionTests 3/3 passed. The pure state machine requires a future holdUntil plus reason for BUSINESS_HOLD, clears it only through explicit resume, and rejects holdUntil for FAILED. This prevents a business hold from becoming a blind technical retry. No unapproved retry/backoff, schedule activation, persistence workflow, or threshold was added."
AEG-V16-017,S6,Cross,FieldShell 표준,IN_PROGRESS,TBD,"docs/CURRENT/AEG-V16-017_FIELDSHELL_SLICE_NOTE.md; frontend/src/shared/ui/components/FieldShell.vue; frontend/src/shared/ui/components/tests/FieldShell.spec.ts","FE Lead","2026-08-08: FieldShell now owns label/error/help/ARIA relationships for KsTextField, KsTextArea, KsSelect, KsDateField, and KsNumberField. Actual evidence: frontend pnpm typecheck PASS; pnpm test PASS (19 files, 42 tests); pnpm build PASS. Build emitted unrelated tracked .js drift, excluded from this Slice. COMPLETED is blocked pending WBS Master/tracker reconciliation and AEG-V16-016 vendor-boundary acceptance evidence."
AEG-V16-016,S0,VS-00,Vendor boundary fitness,IN_PROGRESS,TBD,"docs/CURRENT/AEG-V16-016_VENDOR_BOUNDARY_SLICE_NOTE.md; tools/validate_v16.py; frontend/src/shared/ui/adapter/tests/uiAdapter.contract.spec.ts; evidence/AEG-V16-016/validate_v16_20260808.log; evidence/AEG-V16-016/ui-adapter-tests_20260808.log; evidence/AEG-V16-016/frontend-typecheck_20260808.log","FE Lead","2026-08-08: Removed stale fixed WBS row-count assertion; validator now verifies WBS ID integrity and reports vendor imports outside the approved adapter boundary. Re-executed actual evidence: python tools/validate_v16.py PASS=1 WARN=2 FAIL=0; targeted adapter tests 4/4 PASS; frontend typecheck PASS. COMPLETED is blocked because dependency AEG-V16-015 has no approved acceptance evidence in the tracker."
AEG-V16-015,S0,VS-00,Adapter rollback runbook,BLOCKED,-,"docs/CURRENT/ui-provider-switch.md","FE Lead","2026-08-08: Runbook exists, but status is BLOCKED before completion: acceptance requires visual/a11y/performance rollback rehearsal evidence, which is not present; direct dependency AEG-V16-014 has no tracker evidence. A runbook does not substitute for an approved visual baseline, keyboard/focus and accessible-name report, state-matrix result, agreed performance budget, immutable-artifact rollback rehearsal, and append-only release evidence. No build/test/migration claimed by this status correction."
1 WBS_ID Sprint Slice_ID Task Status Completion_Date Evidence_Link Owner Notes
10 AEG-V15-034 S8 VS-18 Catch-up policy 구현 COMPLETED 2026-08-09 docs/CURRENT/AEG-V15-034_CATCH_UP_POLICY_SLICE_NOTE.md; src/KArtSell.Modules.ModelOperations/Domain/ScheduleOccurrencePlanner.cs; src/KArtSell.Modules.ModelOperations/Scheduling/ModelOperationsDispatcherJob.cs; src/KArtSell.Modules.ModelOperations/Infrastructure/DapperModelScheduleRepository.cs; tests/KArtSell.ModelOperations.UnitTests/ScheduleOccurrencePlannerTests.cs; evidence/AEG-V15-034/ScheduleOccurrencePlannerTests_20260809.trx BE Lead Actual Release run: targeted ScheduleOccurrencePlannerTests 4/4 passed. LATEST_ONLY dispatches only the latest anchored occurrence; SKIP_MISSED advances the lease-held schedule without enqueueing stale work; ALL_WITH_LIMIT dispatches only the configured most-recent occurrences, each with an occurrence-specific UTC idempotency key. Schedules remain disabled. Database integration, lease CAS, and DEC-083 enqueue/mark atomicity are not claimed and remain owned by later WBS items.
11 AEG-V15-035 S8 VS-18 Due operation 계약 확장 COMPLETED 2026-08-09 docs/CURRENT/AEG-V15-035_DUE_OPERATION_CONTRACT_SLICE_NOTE.md; src/KArtSell.Modules.ModelOperations/Application/ModelOperationsContracts.cs; src/KArtSell.Modules.ModelOperations/Application/ModelOperationRequestService.cs; src/KArtSell.Modules.ModelOperations/Scheduling/ScheduledModelOperationJob.cs; src/KArtSell.Modules.ModelOperations/Infrastructure/DapperModelOperationRequestRepository.cs; tests/KArtSell.ModelOperations.UnitTests/ModelOperationRequestServiceTests.cs; evidence/AEG-V15-035/DueModelOperationContractTests_20260809.trx BE Lead Actual Release run: 5/5 targeted unit tests passed. The scheduler occurrence, catch-up policy, and max catch-up flow from due schedule through the serialized job and validated application request; scheduled_for is inserted in the normalized request model and all three values are retained in the transactional outbox payload. Schedules remain disabled. No new migration or PostgreSQL integration evidence is claimed: MIG-0020 already provides scheduled_for; policy and limit provenance is immutable in the event payload, while schedule configuration remains the normalized source referenced by schedule_id/version.
12 AEG-V15-036 S8 VS-18 Dispatcher nextDue CAS COMPLETED 2026-08-09 docs/CURRENT/AEG-V15-036_DISPATCH_CAS_SLICE_NOTE.md; src/KArtSell.Modules.ModelOperations/Application/ModelOperationsContracts.cs; src/KArtSell.Modules.ModelOperations/Infrastructure/DapperModelScheduleRepository.cs; src/KArtSell.Modules.ModelOperations/Scheduling/ModelOperationsDispatcherJob.cs; tests/KArtSell.ModelOperations.UnitTests/DapperModelScheduleRepositoryContractTests.cs; tests/KArtSell.Integration.Tests/Scheduling/ModelScheduleCasTests.cs; evidence/AEG-V15-036/DispatcherCasContractTests_20260809.trx; evidence/AEG-V15-036/ModelScheduleCasTests_20260809.trx BE Lead Actual evidence: unit contract tests 8/8 passed and PostgreSQL integration ModelScheduleCasTests 1/1 passed. The integration test acquires an isolated schedule, expires/reacquires its lease, and verifies a stale owner/revision cannot mutate next_due_at (0-row CAS) while the current owner/revision remains. It found and fixed Dapper positional record materialization by mapping a SQL row DTO explicitly to DueModelOperation. Schedules remain disabled; DEC-083 enqueue/mark atomicity remains a separate later Slice.
13 AEG-V15-037 S8 VS-18 BusinessHold와 기술실패 분리 COMPLETED 2026-08-09 docs/CURRENT/AEG-V15-037_EXECUTION_HOLD_SLICE_NOTE.md; src/KArtSell.Modules.ModelOperations/Domain/ModelOperationExecution.cs; tests/KArtSell.ModelOperations.UnitTests/ModelOperationExecutionTests.cs; evidence/AEG-V15-037/ModelOperationExecutionTests_20260809.trx BE Lead Actual Release evidence: ModelOperationExecutionTests 3/3 passed. The pure state machine requires a future holdUntil plus reason for BUSINESS_HOLD, clears it only through explicit resume, and rejects holdUntil for FAILED. This prevents a business hold from becoming a blind technical retry. No unapproved retry/backoff, schedule activation, persistence workflow, or threshold was added.
14 AEG-V16-017 S6 Cross FieldShell 표준 IN_PROGRESS TBD docs/CURRENT/AEG-V16-017_FIELDSHELL_SLICE_NOTE.md; frontend/src/shared/ui/components/FieldShell.vue; frontend/src/shared/ui/components/tests/FieldShell.spec.ts FE Lead 2026-08-08: FieldShell now owns label/error/help/ARIA relationships for KsTextField, KsTextArea, KsSelect, KsDateField, and KsNumberField. Actual evidence: frontend pnpm typecheck PASS; pnpm test PASS (19 files, 42 tests); pnpm build PASS. Build emitted unrelated tracked .js drift, excluded from this Slice. COMPLETED is blocked pending WBS Master/tracker reconciliation and AEG-V16-016 vendor-boundary acceptance evidence.
15 AEG-V16-016 S0 VS-00 Vendor boundary fitness IN_PROGRESS TBD docs/CURRENT/AEG-V16-016_VENDOR_BOUNDARY_SLICE_NOTE.md; tools/validate_v16.py; frontend/src/shared/ui/adapter/tests/uiAdapter.contract.spec.ts; evidence/AEG-V16-016/validate_v16_20260808.log; evidence/AEG-V16-016/ui-adapter-tests_20260808.log; evidence/AEG-V16-016/frontend-typecheck_20260808.log FE Lead 2026-08-08: Removed stale fixed WBS row-count assertion; validator now verifies WBS ID integrity and reports vendor imports outside the approved adapter boundary. Re-executed actual evidence: python tools/validate_v16.py PASS=1 WARN=2 FAIL=0; targeted adapter tests 4/4 PASS; frontend typecheck PASS. COMPLETED is blocked because dependency AEG-V16-015 has no approved acceptance evidence in the tracker.
16 AEG-V16-015 S0 VS-00 Adapter rollback runbook BLOCKED - docs/CURRENT/ui-provider-switch.md FE Lead 2026-08-08: Runbook exists, but status is BLOCKED before completion: acceptance requires visual/a11y/performance rollback rehearsal evidence, which is not present; direct dependency AEG-V16-014 has no tracker evidence. A runbook does not substitute for an approved visual baseline, keyboard/focus and accessible-name report, state-matrix result, agreed performance budget, immutable-artifact rollback rehearsal, and append-only release evidence. No build/test/migration claimed by this status correction.