docs: close AEG-V15-033 schedule anchor evidence

Evidence: Release targeted ScheduleOccurrencePlannerTests 2/2 passed; TRX SHA256 4CDD5098C0D49B642A869E35A77F31CB4BF4A9CB76F0B340F1C69EF58C7ED864. No scheduler was enabled.
This commit is contained in:
2026-08-09 01:56:32 +09:00
parent a3c20240ab
commit 6a86997438
4 changed files with 65 additions and 1 deletions
+1 -1
View File
@@ -511,7 +511,7 @@ AEG-V15-029,S6,W13-14,Cross,Cross-cutting,UX/Layout,LAY,REQ-V15-LAY-05,Cross,Cro
AEG-V15-030,S6,W13-14,Cross,Cross-cutting,UX/Layout,LAY,REQ-V15-LAY-06,Cross,Cross,Cross,UI-V15-LAY-06,T-V15-LAY-06,민감정보 column 표시정책,PII grid policy,마스킹·export 권한·audit,UX Lead,FE/QA,6,AEG-V15-029,MVP-A,SOURCE+DESIGN_PROPOSAL,P1,PLANNED
AEG-V15-031,S6,W13-14,Cross,Cross-cutting,UX/Layout,LAY,REQ-V15-LAY-07,Cross,Cross,Cross,UI-V15-LAY-07,T-V15-LAY-07,반응형 운영화면 기준,responsive evidence,1024/1440/1920/모바일 업무순서 유지,UX Lead,FE/QA,4,AEG-V15-030,MVP-A,SOURCE+DESIGN_PROPOSAL,P1,PLANNED
AEG-V15-032,S6,W13-14,Cross,Cross-cutting,UX/Layout,LAY,REQ-V15-LAY-08,Cross,Cross,Cross,UI-V15-LAY-08,T-V15-LAY-08,디자인 token 변경 Gate,semantic token contract,기능 CSS 직접 색상/간격 drift 0,UX Lead,FE/QA,4,AEG-V15-031,MVP-A,SOURCE+DESIGN_PROPOSAL,P1,PLANNED
AEG-V15-033,S8,W17-18,VS-18,BacktestingEvaluation,Scheduler,SCH,REQ-V15-SCH-01,V15-SCH-API,MIG-0020,J31~J40,Cross,T-V15-SCH-01,Schedule anchor 계산기,ScheduleOccurrencePlanner,dispatch 지연이 cadence drift를 만들지 않음,BE Lead,SRE/QA,3,AEG-X-001,G3,SOURCE+DESIGN_PROPOSAL,P0,PLANNED
AEG-V15-033,S8,W17-18,VS-18,BacktestingEvaluation,Scheduler,SCH,REQ-V15-SCH-01,V15-SCH-API,MIG-0020,J31~J40,Cross,T-V15-SCH-01,Schedule anchor 계산기,ScheduleOccurrencePlanner,dispatch 지연이 cadence drift를 만들지 않음,BE Lead,SRE/QA,3,AEG-X-001,G3,SOURCE+DESIGN_PROPOSAL,P0,COMPLETED
AEG-V15-034,S8,W17-18,VS-18,BacktestingEvaluation,Scheduler,SCH,REQ-V15-SCH-02,V15-SCH-API,MIG-0020,J31~J40,Cross,T-V15-SCH-02,Catch-up policy 구현,LATEST/SKIP/ALL_LIMIT,장애 복구 후 job storm 0,BE Lead,SRE/QA,5,AEG-V15-033,G3,SOURCE+DESIGN_PROPOSAL,P0,PLANNED
AEG-V15-035,S8,W17-18,VS-18,BacktestingEvaluation,Scheduler,SCH,REQ-V15-SCH-03,V15-SCH-API,MIG-0020,J31~J40,Cross,T-V15-SCH-03,Due operation 계약 확장,DueModelOperation v15,scheduledFor/catchUp/maxCatchUp 추적,BE Lead,SRE/QA,5,AEG-V15-034,G3,SOURCE+DESIGN_PROPOSAL,P1,PLANNED
AEG-V15-036,S8,W17-18,VS-18,BacktestingEvaluation,Scheduler,SCH,REQ-V15-SCH-04,V15-SCH-API,MIG-0020,J31~J40,Cross,T-V15-SCH-04,Dispatcher nextDue CAS,schedule repository,lease 상실·중복 advance 0,BE Lead,SRE/QA,6,AEG-V15-035,G3,SOURCE+DESIGN_PROPOSAL,P0,PLANNED
1 WBS_ID Sprint Weeks Slice_ID Slice Module Workstream Requirement_ID API_ID DB_Migration_ID Job_Event_ID UI_ID Test_ID Task Artifact Acceptance_Evidence Primary_Owner Secondary PD Dependency Gate Evidence_Class Risk Status
511 AEG-V15-030 S6 W13-14 Cross Cross-cutting UX/Layout LAY REQ-V15-LAY-06 Cross Cross Cross UI-V15-LAY-06 T-V15-LAY-06 민감정보 column 표시정책 PII grid policy 마스킹·export 권한·audit UX Lead FE/QA 6 AEG-V15-029 MVP-A SOURCE+DESIGN_PROPOSAL P1 PLANNED
512 AEG-V15-031 S6 W13-14 Cross Cross-cutting UX/Layout LAY REQ-V15-LAY-07 Cross Cross Cross UI-V15-LAY-07 T-V15-LAY-07 반응형 운영화면 기준 responsive evidence 1024/1440/1920/모바일 업무순서 유지 UX Lead FE/QA 4 AEG-V15-030 MVP-A SOURCE+DESIGN_PROPOSAL P1 PLANNED
513 AEG-V15-032 S6 W13-14 Cross Cross-cutting UX/Layout LAY REQ-V15-LAY-08 Cross Cross Cross UI-V15-LAY-08 T-V15-LAY-08 디자인 token 변경 Gate semantic token contract 기능 CSS 직접 색상/간격 drift 0 UX Lead FE/QA 4 AEG-V15-031 MVP-A SOURCE+DESIGN_PROPOSAL P1 PLANNED
514 AEG-V15-033 S8 W17-18 VS-18 BacktestingEvaluation Scheduler SCH REQ-V15-SCH-01 V15-SCH-API MIG-0020 J31~J40 Cross T-V15-SCH-01 Schedule anchor 계산기 ScheduleOccurrencePlanner dispatch 지연이 cadence drift를 만들지 않음 BE Lead SRE/QA 3 AEG-X-001 G3 SOURCE+DESIGN_PROPOSAL P0 PLANNED COMPLETED
515 AEG-V15-034 S8 W17-18 VS-18 BacktestingEvaluation Scheduler SCH REQ-V15-SCH-02 V15-SCH-API MIG-0020 J31~J40 Cross T-V15-SCH-02 Catch-up policy 구현 LATEST/SKIP/ALL_LIMIT 장애 복구 후 job storm 0 BE Lead SRE/QA 5 AEG-V15-033 G3 SOURCE+DESIGN_PROPOSAL P0 PLANNED
516 AEG-V15-035 S8 W17-18 VS-18 BacktestingEvaluation Scheduler SCH REQ-V15-SCH-03 V15-SCH-API MIG-0020 J31~J40 Cross T-V15-SCH-03 Due operation 계약 확장 DueModelOperation v15 scheduledFor/catchUp/maxCatchUp 추적 BE Lead SRE/QA 5 AEG-V15-034 G3 SOURCE+DESIGN_PROPOSAL P1 PLANNED
517 AEG-V15-036 S8 W17-18 VS-18 BacktestingEvaluation Scheduler SCH REQ-V15-SCH-04 V15-SCH-API MIG-0020 J31~J40 Cross T-V15-SCH-04 Dispatcher nextDue CAS schedule repository lease 상실·중복 advance 0 BE Lead SRE/QA 6 AEG-V15-035 G3 SOURCE+DESIGN_PROPOSAL P0 PLANNED